Just looking at some of the stations I use quite regularly on the North London Line and the growth is absolutely crazy.
From pre-LOROL in 2008 operation to 2013, there are some massive gains.
H&I has went from ~4million passengers a year to over 16million, making the growth something similar to the same of the entirety of Liverpool Lime Street - in just 5 years.
Dalston Kingsland has seen growth from 2.5m to 5m - despite Dalston Junction being added to share the load. Hackney central & Homerton have also seen 200% growth.
This is really obvious when you look at the loadings. I was on the train today at 3pm on a Thursday - perhaps worse because the schools were on strike, though there weren't many kids and parents that I could see - but the train was absolutely packed. It usually stays that way until past 8pm.
If this growth continues at any sort of the same pace then the 25% capacity increase that 5 car operation will bring is not even going to touch the sides - that's less than annual % growth of pax at many of the stations, and won't be ready until 2015 at the earliest.
Does TfL have any further plans to increase capacity? Diverting freight via GOBLIN when it is electrified seems plausible - would that free up a significant amount of paths to get it to say, 10tph operation? Would it be horrendously expensive to extend it to 6, 7 or even 8 car operation?
I think something is going to be have to be done. The platforms at H&I are starting to become dangerously overcrowded in the evening peak and the dwell times are becoming unsustainable, meaning it falls behind schedule and extra padding would have to be put in - further reducing capacity.
From pre-LOROL in 2008 operation to 2013, there are some massive gains.
H&I has went from ~4million passengers a year to over 16million, making the growth something similar to the same of the entirety of Liverpool Lime Street - in just 5 years.
Dalston Kingsland has seen growth from 2.5m to 5m - despite Dalston Junction being added to share the load. Hackney central & Homerton have also seen 200% growth.
This is really obvious when you look at the loadings. I was on the train today at 3pm on a Thursday - perhaps worse because the schools were on strike, though there weren't many kids and parents that I could see - but the train was absolutely packed. It usually stays that way until past 8pm.
If this growth continues at any sort of the same pace then the 25% capacity increase that 5 car operation will bring is not even going to touch the sides - that's less than annual % growth of pax at many of the stations, and won't be ready until 2015 at the earliest.
Does TfL have any further plans to increase capacity? Diverting freight via GOBLIN when it is electrified seems plausible - would that free up a significant amount of paths to get it to say, 10tph operation? Would it be horrendously expensive to extend it to 6, 7 or even 8 car operation?
I think something is going to be have to be done. The platforms at H&I are starting to become dangerously overcrowded in the evening peak and the dwell times are becoming unsustainable, meaning it falls behind schedule and extra padding would have to be put in - further reducing capacity.
