Class08Shunter
On Moderation
If the Channel Tunnel had not been abandoned in the 70s and finished in 1980, would BR, SNCF and SNCB have formed Eurostar or would things be different?
Although I haven't been able to find it with any Google searching, I do recall seeing a BR publicity document or poster from the 1980s for the Channel Tunnel ( when the idea was being revived again - and ultimately got built this time round ) which included an artist's impression of a train in the tunnel.The cranks would have hoped for pairs of 73s running with mk2/3 stock through to France. More likely there would have been an anglo French built dual voltage UK gauge TGV type train. You never know....this design may have ended up on the East or West Coast ML.
I think the original plan was just the undersea tunnel. When high speed line through kent the NIMBYs went off on one, and the treasury got frightened by the new costsAlthough I haven't been able to find it with any Google searching, I do recall seeing a BR publicity document or poster from the 1980s for the Channel Tunnel ( when the idea was being revived again - and ultimately got built this time round ) which included an artist's impression of a train in the tunnel.
That train was unmistakably an SR style EPB...
The Night Ferry would probably be renamed as it wouldn't go on a ferry after the 'chunnel' was openedRemember there was no HS1 or LGV Nord at this time, so travel time would have been slower either side of the tunnel - which itself has a 160km/h limit.
I imagine that the Night Ferry would have not been axed and instead diverted through the tunnel, almost certainly with a somewhat shortened runtime. New stock would have been ordered as the Type Fs were getting rather old - and their stoves would have been a safety hazard.
More likely there would have been an anglo French built dual voltage UK gauge TGV type train. You never know....this design may have ended up on the East or West Coast ML.
In pictures of the CC 40100 class hauling various European coaches the loco is not noticeably dwarfed by the coaches as you might expect if that were true. Similarly for the SNCB Alsthom Class 18s derived from them.Perhaps it is an urban myth, but were not the SNCF CC40100 and SNCB Type 18 built to the British loading gauge to work TEE services through to London (Victoria?) on the assumption that the British would not be entertaining the idea of running international express services off the third rail juice, and that Kent would be OLE'd?
Or some iteration of the APT?
With additional French money and expertise yes this could have been a possibility. Development would have been quicker and it may have been ready by 1980. Not sure if they would have suffered the centre power cars though? They certainly wouldn't have accepted mk3s with plug doors on the continent.
It was the talk of a new line to London which sank the 1970s tunnel scheme.That does bring up a point - I can very vaguely remember that chunnel attempt, but I've never come across anything talking about how it was going to be linked to ... well, it'd be London, I guess, but the rest of the network. Was there any talk of a new line at all?
The UK was also in a deep recession with high inflation (sound familiar?).
I dont understand your question i doubt there would have been any difference had it opened in 1980 compared to when it opened in 1993. The origins of Eurostar today are exactly what you said it was formed from an agreement between BR, SNCF and SNCB. Eurostar trains were built using dual voltage stock and run on existing 3rd rail dc lines in kent when the tunnel opened.If the Channel Tunnel had not been abandoned in the 70s and finished in 1980, would BR, SNCF and SNCB have formed Eurostar or would things be different?
What i'm saying is would Eurostar have been formed, or would the three companies have ran their own trains? BR trains through the tunnel, SNCF trains through the tunnel and SNCB trains through the tunnel.I dont understand your question i doubt there would have been any difference had it opened in 1980 compared to when it opened in 1993. The origins of Eurostar today are exactly what you said it was formed from an agreement between BR, SNCF and SNCB. Eurostar trains were built using dual voltage stock and run on existing 3rd rail dc lines in kent when the tunnel opened.
The service would have had purpose-built loco-hauled stock (almost certainly including sleepers) which probably would have survived well into this century. Other than the fact that travel patterns (particularly overnight) might have had time to get established before the low cost airlines got going, little would be different by now (except possibly for where the London terminus was - or even if it was a terminus)I dont understand your question i doubt there would have been any difference had it opened in 1980 compared to when it opened in 1993.
Concur about the sleepers. They declined in mainland Europe due to high speed day trains and low cost airlines.The service would have had purpose-built loco-hauled stock (almost certainly including sleepers) which probably would have survived well into this century. Other than the fact that travel patterns (particularly overnight) might have had time to get established before the low cost airlines got going, little would be different by now (except possibly for where the London terminus was - or even if it was a terminus)
Out of interest, why is that?They certainly wouldn't have accepted mk3s with plug doors on the continent.
While they may have died out later, that wouldn't stop high speed trains taking over, and with us still firmly in the EU in those days, and Sleeper routes likely going further afield, the high speed trains would do the same, which would make Brexit even more interesting as they wouldn't just have to worry about border control at St Pancras, but likely stations all across the network.Concur about the sleepers. They declined in mainland Europe due to high speed day trains and low cost airlines.
Out of interest, why is that?