I think the Heart of Wales line timetable would have problems if all stops became compulsory, and it would make very little sense.
As an extreme example, I've been through Sugar Loaf on a train probably forty or fifty times, and stopped there exactly twice - one of which was because I'd requested it.
At Cynghordy, I've probably been on trains that stopped on no more than ten occasions at most. The platform is on a rising gradient (1 in 50 iirc) and the track is tree-lined, meaning adhesion is often poor. Northbound (up-hill) trains can struggle to re-start, and stopping every train there would mean that difficult start would usually be pointless.
Other stations further north like Llanbister Road and Llangynllo have similar levels of usage. Stopping every train would further slow an already long journey time, for the benefit of whom? The few people likely to use these remote stations are unlikely to have any difficulty in signalling to the driver.
Their situation is completely different from examples like Conwy, which I agree was a very strange choice to be a request stop.
As an extreme example, I've been through Sugar Loaf on a train probably forty or fifty times, and stopped there exactly twice - one of which was because I'd requested it.
At Cynghordy, I've probably been on trains that stopped on no more than ten occasions at most. The platform is on a rising gradient (1 in 50 iirc) and the track is tree-lined, meaning adhesion is often poor. Northbound (up-hill) trains can struggle to re-start, and stopping every train there would mean that difficult start would usually be pointless.
Other stations further north like Llanbister Road and Llangynllo have similar levels of usage. Stopping every train would further slow an already long journey time, for the benefit of whom? The few people likely to use these remote stations are unlikely to have any difficulty in signalling to the driver.
Their situation is completely different from examples like Conwy, which I agree was a very strange choice to be a request stop.