This is an odd one.
Now I'm no expert on infrastructure, but is this article just spouting rubbish or are there any good ideas in there?
http://www.wharfedaleobserver.co.uk...bosses_in_bid_to_reform_rail_services/?ref=ec
The writer of the article doesn't seem to realise that the Wharfedale line is already electrified but would need redoing for Underground trains to run on it. Presuimably it'd have to be in addition to the current system or trains would be unable to run to Bradford. I suspect the current frequency on the line has more to do with the level of usage or stock availability (or paths into Leeds). Otherwise it probbaly wouldn't drop to hourly in the evening.
Now I'm no expert on infrastructure, but is this article just spouting rubbish or are there any good ideas in there?
http://www.wharfedaleobserver.co.uk...bosses_in_bid_to_reform_rail_services/?ref=ec
The writer of the article doesn't seem to realise that the Wharfedale line is already electrified but would need redoing for Underground trains to run on it. Presuimably it'd have to be in addition to the current system or trains would be unable to run to Bradford. I suspect the current frequency on the line has more to do with the level of usage or stock availability (or paths into Leeds). Otherwise it probbaly wouldn't drop to hourly in the evening.