Jordan Adam
Established Member
Do we know how EX1 and EX2 are doing in terms of pax?
See post #2833. I doubt much has changed since Monday.
Do we know how EX1 and EX2 are doing in terms of pax?
Thanks, No idea how I missed that post!See post #2833. I doubt much has changed since Monday.
6 hrs ·
If you're travelling on our service 43 tomorrow, you could be the first to try the new contactless capping system!
This will give you the best value price for all the journeys you make in one day – only available on service 43/X43 (for now!)
Get tapping![]()
PM0003030/5 Cancelled
SAMUEL JAMES DOUGLAS
Route: Eastfield Church Street to Bathgate, King Street Station via Harthill, Blackridge, Armadale
Service number: 150 ()
Service type: Normal Stopping
Effective date: 29 Aug 2019
PM0003030/5 Cancelled
SAMUEL JAMES DOUGLAS
Route: Eastfield Church Street to Bathgate, King Street Station via Harthill, Blackridge, Armadale
Service number: 150 ()
Service type: Normal Stopping
Effective date: 29 Aug 2019
For a second I thought this was another new LCB service, though if they were to hit Harthill I would be surprised they extended the X18 or a new service altogether
150 was commercial, not subsidised.
in the future possibly, im expecting them to do a Skylink route out to LivingstonDo you think Bo'ness will ever be covered by LCB?
The A90 needs a park and ride ASAP.Id like to see something along the lines of
Ex4 2 am trips to Edinburgh, 2 pm trips from Edinburgh
Probably starting Bo'mains Road via Dean Road, through Grahamsdyke to Ecline Corner, then A90 and as 43 to St. Andrew Sq.
Stopping pattern a.m. : all stops Bo'ness to Ecline Corner, then Ferrymuir Tesco, non-stop via A90 to Cramond Brig, Barnton, Blackhall (shops), Holiday Inn, Orchard Brae, West End, St.Andrew Sq
P.m.: stops at West End, Orchard Brae, Holiday Inn, Blackhall, Barnton, Cramond Brig, non stop to Ferrymuir Tesco, Ecline Corner then all stops.
Of course, this is all lovely on paper and in a world of a bus enthusiast......however the congestion faced along A90 corridor pretty much makes it a non-starter....
A dedicated bus lane with priority lights from West end to Ferrymuir would be a game changer imo.....but that ain't gonna happen!
It would need to be faster than the 600 if it were on a similar route.in the future possibly, im expecting them to do a Skylink route out to Livingston
Even if it's an EH postcode it's not West Lothian Council.Do you think Bo'ness will ever be covered by LCB?
Do you think Bo'ness will ever be covered by LCB?
in the future possibly, im expecting them to do a Skylink route out to Livingston
While correct, it surely is not a major problem. While LCB is named Lothian, is there anything legally stopping LCB from doing that? I don't think there is?Even if it's an EH postcode it's not West Lothian Council.
The A90 needs a park and ride ASAP.
I don't think the shareholders will say no to possiblity of extra income as long as it has no negitive impact on current services.LB has to have the express permission of the shareholders to beyond the boundaries of the old Lothian Region.
Yes, which I spoke about on the LB & ECB thread. Lothian don't service it, but you also have folk from the M9/M90 using the A90 to head towards town, so a P&R might help with that. I assume you meaning the Barnton junction? It needs to be looked at properly. A flyover or something would be a good start for there for A90-A90 traffic. Sadly, this is a council thing and not a Lothian thing and I doubt the council would even contemplate such a move even if it would speed up traffic.It does in Fife. However the problems on the A90 are linked to traffic from North Edinburgh heading to maybury etc.
If it was a part of West Lothian I would be positive they would consider it, but much like Ferrymuir I’m doubtful they will extend beyond the region, heck even the thought of Harthill which is 50% West Lothian and 50% North Lancashire is a gamble..
Traffic modelling shows that if bus lanes were introduced on the A90, delays to vehicles in the general traffic lane would increase significantly. Queues would also
increase at critical junctions which are already at capacity. This may negatively affect the ability of buses to access the lane in the first place and could result in buses experiencing more delay than present.
Because of this, it is not considered feasible to introduce bus lanes on the A90 at present, however, bus priority measures will be considered within the context of a wider regional transport plan.
North LANCASHIRE?? I think you mean Lanarkshire? I know Lothian are ambitious, but still.....................!
That’s what I get when I rely on autocorrectI’m doubtful but anything could happen at this point. Especially if they consider Harthill a fully West Lothian town, which it should be, that way it would be a simple extension for the 275
Doubt they would have any interest plus it was only retendered recently for 7 years was it not?It could get more interesting if lothian bid for spt contract 235/236.