Then you have the hordes that use the train between Brum and Coventry. People are guilty of assuming that the West Coast is purely a London service. Sure, it's ultimately the selling point, but it serves many other short routes. Prestatyn/Rhyl - Llandudno, Runcorn-Liverpool, Macc-Manchester.
There was the question during the consultation of whether some of the stops on the Coventry and Wolverhampton corridor could be removed on some services.
However this invitation to tender has gone out and the calling pattern has to as minimum remain as frequent as it is now. So that idea came as a non starter.
Operator specific tickets are already available on the route but it's done little to combat the overcrowding north of Coventry at certain times. I guess it's just going to be a fact of life for the foreseeable.
Only way around it is hope LNR run all their sets as minimum 8 cars once they get their new stock and TPE units and offer LNR only local tickets in the Coventry corridor perhaps at a cheaper price with encouragement from the DFT.
Back to capacity. No new stock means no new capacity. So one potentially 9 car (some) train per hour between Euston and Liverpool until minimum 2026. Is this going to be enough? The 1907 on a Friday is already full and standing as a matter of course and has to be first stop Runcorn in order to try and limit passenger numbers beyond over loading.
How's it going to be in 2024?
Last edited: