Masbroughlad
Established Member
hasnt thought of that, dont know whether i should be happy or sad...
Meaning....HS2 won't be passed? And the Existing TOCs and network will be left to pick up the pieces?
HS2 MUST happen! (please)
hasnt thought of that, dont know whether i should be happy or sad...
Meaning....HS2 won't be passed? And the Existing TOCs and network will be left to pick up the pieces?
HS2 MUST happen! (please)
Compared to Reading, Milton Keynes gets quite a poor deal at this time. There is still the question on if the minimum service levels apply to the combined total in both directions or not. I think it's reasonable that there is a requirment to maintain at least the existing level of service on the south WCML. Remmber that what they are setting is a mimimum level of service and not telling the bidders exactly what services they must run. Philip Hammond made a point of saying that the franchisee could if they wanted make more calls at Nuneaton than they are required to.606 services a week between Stockport and Euston??? And did they really have to specify minimum 732 services a week for Milton Keynes?
I also noticed Wrexham and Carstairs are not (were not) in the franchise spec, it's up to bidders if they want to stop there.
It allows more freedom than now, it won't be a case that every single train in the timetable has to run exactly as specified by the dft.If that's innovative, the jokes on the horse thread were good!
It allows more freedom than now, it won't be a case that every single train in the timetable has to run exactly as specified by the dft.
So you would prefer to have every service specified exactly by the dft?Freedom to do the bare minmum!
So you would prefer to have every service specified exactly by the dft?
So you would prefer to have every service specified exactly by the dft?