Peterborough gets more than enough fast East Coast services, so slowing down its semi-fast services makes more sense.

... And what about the commuting population in between? Our trains have already been messed with enough!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Lee_Again

Member
Joined
29 Sep 2007
Messages
691
Location
Stevenage
Here's my attempt at posting a timetable.

Please spot for errors and provide feedback.

12.01p = passing time

removed. another attempt coming soon
--- old post above --- --- new post below ---
Attempt 2

Code:
Destination	 EDI 	 LDS 	 OA 	 WGSL 	 HNSF 	 CC 	 HNSF 	 WGSL 	 LDS 	 NEW 	 HNSL 	 FS/TL 	 HNSL 	 OA 	 SF/KX 	 LDS 	 WGSL 	 HNSF 	 CC/TL 	 HNSF 	 WGSL 	 EDI 	 SF/TL 	 HNSL 	 FS/KX 	 HNSL 
Kings Cross	12.00	12.03	13.06			12.15			12.23	12.30				12.36		12.43						13.00	12.54		13.00	
St Pancras TL	x	x	x	12.02								12.30			12.27		12.32		12.45							
Moorgate 	x	x	x		11.59			12.09			12.12							12.29			12.39			12.42		
Old Street	x	x	x		12.01			12.11			12.14							12.31			12.41			12.44		
Essex Road	x	x	x		12.04			12.14			12.17							12.34			12.44			12.47		
Highbury  	x	x	x		12.06			12.16			12.19							12.36			12.46			12.49		
Drayton Park	x	x	x		12.08			12.18			12.21							12.38			12.48			12.51		
Finsbury Park	x	x	x	12.07	12.11	12.20p		12.22			12.24	12.35			12.32		12.37	12.41	12.50p		12.52		12.59	12.54	13.05	
Harringay	x	x	x	12.09				12.24			12.26						12.39				12.54			12.56		
Hornsey       	x	x	x	12.11				12.26			12.28						12.41				12.56			12.58		
Alexandra Plc	x	x	x	12.14	12.16	12.22p		12.29			12.31	13.37					12.44	12.46	12.52p		12.59			12.51		
New Southgate	x	x	x					12.32													13.02					
Oakleigh Park	x	x	x					12.35													13.05					
New Barnet	x	x	x	12.21				12.37									12.51				13.07					
Hadley wood	x	x	x					12.40													13.10					
Potters Bar	x	x	x	12.27				12.44							12.42		12.57				13.14		13.09			
Brookmans Park	x	x	x	12.30				12.47									13.00				13.17					
Welham Green	x	x	x	12.32				12.49									13.02				13.19					
Hatfield    	x	x	x	12.35				12.52							12.48		13.05				13.22		13.15			
Welwyn Gdn	x	x	x	12.41				12.58							12.52		13.11				13.28		13.19			
Welwyn North	12.16p	12.19p	12.22p						12.39p	12.46p				12.52p	12.55	12.59p						13.16p	13.22			
Knebworth	x	x	x												12.59								13.26			
Bowes Park	x	x	x								12.33													13.03		
Palmers Green	x	x	x		12.20						12.36							12.50						13.06		
Winchmore Hill	x	x	x		12.23						12.38							12.53						13.08		
Grange Park	x	x	x								12.40													13.10		
Enfield Chase	x	x	x		12.27						12.43							12.57						13.13		
Gordon Hill (a)	x	x	x		12.30	12.32p					12.45	12.47						13.00	13.02p					13.15	13.17p	
Gordon Hill (d)	x	x	x				12.33						12.48							13.03						13.18
Crews Hill	x	x	x										12.51													13.21
Cufley       	x	x	x										12.54													13.24
Bayford      	x	x	x										12.59													13.29
Hertford North	x	x	x			12.36p	12.37						13.03							13.07					13.22	13.33
Watton at Stone	x						12.42													13.12						
Stevenage	12.18p	12.21p	13.24p			12.45p	12.50		12.43	12.48p		13.00			13.03					13.20		13.18p	13.30		13.33	
Hitchin      	x	x	x				12.55					13.05			13.08					13.25			13.35		13.38	
Letchworth	x	x	x				12.59					13.09								13.29			13.39			
Baldock      	x	x	x				13.02					13.12								13.32			13.42			
Ashwell     	x	x	x				13.06													13.36			13.46			
Royston     	x	x	x				13.10					13.20								13.40			13.50			
Meldreth  	x 	x	x																				13.54			
Shepreth  	x	x	x																				13.57			
Foxton       	x	x	x																				13.59			
Cambridge	x	x	x			13.09						13.37							13.39				14.15			
Arlesley    	x	x	x												13.13										13.43	
Biggleswade	x	x	x												13.18										13.48	
Sandy       	x	x	x												13.22										13.52	
St Neots  	x	x	x												13.29										13.59	
Peterborough	12.44p	12.47p	12.50p						13.11	13.15				13.25p	13.37	13.28						13.44p			14.07
 
Last edited:

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
I've not had chance to read through it in too much detail, so can't make too many comments on the plan as a whole - just a couple of observations on some of the finer points though.

Firstly, the Moorgate branch seems to end up with a rather irregular service - sometimes a 10' interval, but at other times a 17'/3' pattern (reducing to 2' by Finsbury Park - I think the ROTP headway is 5½'!). I'm not sure that'd be too well received!

Secondly (and finally for now), some of the running times on the Hertford Loop look a little bit out. Four minutes to cover nearly ten miles from Gordon Hill to Hertford North is ambitious to say the least! You've also got one train running at a 1' headway behind another, from its extended stop at Gordon Hill to Hertford North - I still maintain that a 3 minute stop isn't enough in that case (inside clear 3' before the fast passes, with a further 2' to then allow the fast to get one signal section beyond, and get the stopper away), but either way there'll be more distance between them by Hertford.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,577
Location
Brighton
When I used to use the fast KX-CBG services I always thought that stopping at Hitchin would have made sense, rather than forcing everyone to do all stations from Stevenage to Cambridge. Our train was usually pretty empty, and it seemed like it could improve the service to the extremities of the KX commuter services by such things as using a fast Peterborough service to overtake and then catch a previous stopping service to Cambridge, and vice versa, saving some time over waiting for the next fast service. Pre-flyover, I also figured it would help regulate the conflicting movement.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
What, and have the fast stand at Hertford North for 20 minutes to provide a 10:51 departure? I only included a Hertford call as otherwise it'd probably just catch the stopper up (but it does mean that Hertford's provided with a fast service to KX too). In any case, following the half-hourly pattern, the 'next' stopper would depart Hertford North at 10:54 anyway.

No you misunderstand me, I mean for a alternative service to be provided 30 mins later.

I wasn't aware of the train at 10:54 by the way, :(
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Ah, I see. As you've hopefully now understood, there would be a similar service 30' later (at 10:54).
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
When I used to use the fast KX-CBG services I always thought that stopping at Hitchin would have made sense, rather than forcing everyone to do all stations from Stevenage to Cambridge. Our train was usually pretty empty, and it seemed like it could improve the service to the extremities of the KX commuter services by such things as using a fast Peterborough service to overtake and then catch a previous stopping service to Cambridge, and vice versa, saving some time over waiting for the next fast service. Pre-flyover, I also figured it would help regulate the conflicting movement.

Alternatively, next West Anglia upgrade, put in provision to send them via Bishop's Stortford and Tottenham Hale. Two paths freed up with no loss of service, although it might slow things down a bit.
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,508
Location
London
Nobody likes losing a direct service from their local station, but it's a question of the best use of overall resources.

At the moment the spread of Cambridge services is like this (based on MF southbound)

  • 50 minutes non-stop
  • 54 minutes stopping only at Royston and Baldock
  • 62 minutes with six stops
  • 84 minutes with fifteen stops so gets overtaken by the next "fast" service

If you gave all of the Potters Bar/ WGC/ Knebworth (etc) stops to the "semi fast" Peterborough services then you could spread out the four Cambridge services much better to give one every fifteen minutes from London taking 60-65 minutes (with some running faster/ slower north of Hitchin, so slightly staggered arrivals at Cambridge), ensuring no Cambridge train gets overtaken.

Peterborough gets more than enough fast East Coast services, so slowing down its semi-fast services makes more sense.
Peterborough might get plenty of East Coast services, but nowhere else between there and Hitchin gets anything other than a half hourly service (excluding peak-only extras).. Those services that currently stop at Potters Bar etc can sometimes take over 15 minutes more than those that don't, I can't see adding that to all services being popular.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,059
Location
Reston City Centre
... And what about the commuting population in between? Our trains have already been messed with enough!

Peterborough might get plenty of East Coast services, but nowhere else between there and Hitchin gets anything other than a half hourly service (excluding peak-only extras).. Those services that currently stop at Potters Bar etc can sometimes take over 15 minutes more than those that don't, I can't see adding that to all services being popular.

I appreciate that what I'm suggesting wouldn't be popular at the five stations between Peterborough and Hitchin (Huntingdon, St Neots, Sandy, Biggleswade and Arlesey), but I was taking the suggestion of diverting four services an hour via Hertford (to free up spaces over the viaduct) as a starting point...

...since the FCC KX - Cambridge service is the fastest/ main one (whilst Peterborough has alternative faster services) it seemed logical to concentrate on the London - Cambridge market (which, lets face it, is bigger than the London - St Neots/ Biggleswade/ Sandy market).

Giving Cambridge four KX services an hour with a better split of times seems a better use of resources.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,059
Location
Reston City Centre
Not for the thousands of people who use those other stations it isn't.

Of course.

But (based on the 2011 figures from Wiki)...

  • Arlesey - 445,000
  • Biggleswade - 740,000
  • Sandy - 444,000
  • St Neots - 1,091,000
  • Huntingdon - 1,630,000

...vs...

  • Cambridge - 8,240,000

Obviously not all of the journeys from each station are just to Kings Cross, but I don't have anything more specific to use. It does kind of put things in a little perspective though.
 

Ediswan

Established Member
Joined
15 Nov 2012
Messages
3,441
Location
Stevenage
Please spot for errors and provide feedback.

I don't pretend to understand the whole thing, so a question. I probably have the terminology wrong as well.

Does your plan either allow for, or eliminate:
* Trains which use the bay platform at Gordon Hill and need to cross the up line on arrival.
* Trains which use the bay platform at Hertford North and need to cross the down line on departure.
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,508
Location
London
Of course.

But (based on the 2011 figures from Wiki)...

  • Arlesey - 445,000
  • Biggleswade - 740,000
  • Sandy - 444,000
  • St Neots - 1,091,000
  • Huntingdon - 1,630,000

...vs...

  • Cambridge - 8,240,000

Obviously not all of the journeys from each station are just to Kings Cross, but I don't have anything more specific to use. It does kind of put things in a little perspective though.
Although those numbers are largely considered to be inaccurate.. however, I'd like to point out that Cambridge also has services to Liverpool Street - passengers are more than welcome to use that route.

Taking in to account the far larger number of destinations available from Cambridge than somewhere like Arlesey the figures above are even further skewed.. that 8m is likely to end up far closer to those 5 stations put together.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
Although those numbers are largely considered to be inaccurate.. however, I'd like to point out that Cambridge also has services to Liverpool Street - passengers are more than welcome to use that route
Although they take, what, 30-40 minutes longer than FCC's non-stop?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,059
Location
Reston City Centre
Although those numbers are largely considered to be inaccurate.. however, I'd like to point out that Cambridge also has services to Liverpool Street - passengers are more than welcome to use that route.

Taking in to account the far larger number of destinations available from Cambridge than somewhere like Arlesey the figures above are even further skewed.. that 8m is likely to end up far closer to those 5 stations put together.

If those figures are inaccurate then I'd be interested if you could provide me with some accurate ones.

There are other places you can get to from Cambridge (including some slow services to Liverpool Street) but London is a much bigger market than the alternatives.

Am not suggesting removing any services from the five stations between Peterborough and Hitchin, just giving them the same stopping pattern south of Hitchin (so that the bigger market of Cambridge to London can be better served.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
The Cambridge non-stops are often 8 car and full during the daytime off-peak on weekdays and most of the weekend- it really isn't uncommon to get a Saturday mid-morning service and find it full and standing. Adding stops to full and standing services is, um, foolish.
 

Lee_Again

Member
Joined
29 Sep 2007
Messages
691
Location
Stevenage
I don't pretend to understand the whole thing, so a question. I probably have the terminology wrong as well.

Does your plan either allow for, or eliminate:
* Trains which use the bay platform at Gordon Hill and need to cross the up line on arrival.
* Trains which use the bay platform at Hertford North and need to cross the down line on departure.

There are no trains terminating at Gordon Hill. Each arrives in the loop platform, waits for a fast to pass, then follows it to either Hertford or Royston.

2 trains per hour would reverse at Hertford and need to cross from the down side to the upside. There are only 6 trains per hour so a path would be straight forward to find.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,059
Location
Reston City Centre
The Cambridge non-stops are often 8 car and full during the daytime off-peak on weekdays and most of the weekend- it really isn't uncommon to get a Saturday mid-morning service and find it full and standing. Adding stops to full and standing services is, um, foolish.

Presumably partly because at the moment the Cambridge traffic is skewed towards the one fast train each hour, rather than the badly spaced other services (one of which gets overtaken)?

Four fairly evenly spaced services each hour should manage that demand better.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
Presumably partly because at the moment the Cambridge traffic is skewed towards the one fast train each hour, rather than the badly spaced other services (one of which gets overtaken)?
There are two fast services to Cambridge per hour. One continues through to King's Lynn and the other terminates at Cambridge.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,059
Location
Reston City Centre
There are two fast services to Cambridge per hour. One continues through to King's Lynn and the other terminates at Cambridge.

jopsuk was talking about the non-stop one though, which I was answering about. There is another "fast" service, albeit stopping en route (and is therefore a little slower).
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Both the Cambridge-Kings Cross only and the Kings Lynn-Cambridge-Kings Cross service, spaced half an hour apart, are very busy services. The semi-fast, which doesn't get overtaken, is pretty busy. The Liverpool Street trains are quiet leaving Cambridge as despite being cheaper they're much slower (especially the xx21). Sending the Cambridge-Kings Cross non-stops to Liverpool Street would drastically slow them down; even with special conditions for a record run they weren't able to match the Kings Cros timing. There's also not really any spare capacity through Clapton.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
jopsuk was talking about the non-stop one though, which I was answering about. There is another "fast" service, albeit stopping en route (and is therefore a little slower).
No, both services I am referring to are fast to Cambridge. There are two non-stop trains per hour to Cambridge with one continueing to King's Lynn.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,059
Location
Reston City Centre
No, both services I am referring to are fast to Cambridge. There are two non-stop trains per hour to Cambridge with one continueing to King's Lynn.

At least some of the xx:50s from Cambridge stop en route - not all though, apologies.
 

Zoe

Established Member
Joined
22 Aug 2008
Messages
5,905
At least some of the xx:50s from Cambridge stop en route - not all though, apologies.
That's only in the morning peak and up to 11:00 and only in the Cambridge to London direction. Off peak it's xx:15 and xx:45 from Cambridge both non-stop to London. In the evening peak the reverse situation applies with 2 tph non-stop from Cambridge to London but not from London to Cambridge.
 
Last edited:

Ediswan

Established Member
Joined
15 Nov 2012
Messages
3,441
Location
Stevenage
There are no trains terminating at Gordon Hill. Each arrives in the loop platform, waits for a fast to pass, then follows it to either Hertford or Royston.

OK. You threw me a bit by putting the assumptions after the plan.
 
Last edited:

Lee_Again

Member
Joined
29 Sep 2007
Messages
691
Location
Stevenage
OK. You threw me a bit by putting the assumptions after the plan.

Sorry.

If you read the thread from the start all the 'plans' are discussed. The timetable was more a method to see if it works.

Most of the times come from the existing timetable and/or are based on my experiences of doing the journies. So not very scientific?!?

It's more to generate debate rather then being seen as the finshed article. It can be updated or improved as required.

You'll see that I have made some assumptions about the new Thameslink services. These may very well be wrong.

Don't forget, the idea is to free as many paths across the viaduct as possible.

At present I have 5EC, 2OA and 2FCC each hour.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,270
Location
Isle of Wight
I was just reading the East Coast Main Line 2016 Capacity Review and it's take on the whole issue is worth reading.

"The four-tracking of the Welwyn viaduct is not expected to resolve the capacity constraints on the southern end of the route. Four-tracking would allow the trains calling at Welwyn North to use the slow lines, providing an approximate two to three trains per hour increase in fast line capacity. Any other trains using the slow lines would either need to run along the slow lines from Finsbury Park (incurring significant pathing time) or weave to the slow lines north of Potters Bar.

Weaving at Potters Bar (assuming an upgraded fast – slow crossover is provided) would result in capacity issues on the slow lines and extension of journey times unless the linespeed on the slow lines was increased. Weaving at Welwyn Garden City (assuming an upgraded crossover is provided) would be possible; however, the running time differential between LDHS and outer suburban services between Welwyn Garden City and Woolmer Green Junction is only 30 seconds and thus only a minimal capacity gain would result.

Therefore, the total capacity gains from fourtracking Welwyn Viaduct would likely be too small to offset the significant cost. A more cost-effective
solution would be to reduce signalling headways over the section."


Chris
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,577
Location
Brighton
Speaking of increasing capacity on that section...one thing that occurred to me when I used to travel that section was that there didn't seem any great obstacles to 6-tracking out to WGC from AAP, enabling the stopping metro services to operate segregated (and thus more frequently) from the suburban (i.e. Thameslink) services, which could then just run FPK, WGC, then all-stations to Peterborough/Cambridge.

In most cases the only obstacles would be the tunnels, and these could be handled quite simply by just widening out the single bores added when the line was quadrupled to give three double bores.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
In most cases the only obstacles would be the tunnels, and these could be handled quite simply by just widening out the single bores added when the line was quadrupled to give three double bores.

Although you could leave some/all of the tunnels as they are and not have too much in the way of capacity constraints.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
I was just reading the East Coast Main Line 2016 Capacity Review and it's take on the whole issue is worth reading.

"The four-tracking of the Welwyn viaduct is not expected to resolve the capacity constraints on the southern end of the route. Four-tracking would allow the trains calling at Welwyn North to use the slow lines, providing an approximate two to three trains per hour increase in fast line capacity. Any other trains using the slow lines would either need to run along the slow lines from Finsbury Park (incurring significant pathing time) or weave to the slow lines north of Potters Bar.

Weaving at Potters Bar (assuming an upgraded fast – slow crossover is provided) would result in capacity issues on the slow lines and extension of journey times unless the linespeed on the slow lines was increased. Weaving at Welwyn Garden City (assuming an upgraded crossover is provided) would be possible; however, the running time differential between LDHS and outer suburban services between Welwyn Garden City and Woolmer Green Junction is only 30 seconds and thus only a minimal capacity gain would result.

Therefore, the total capacity gains from fourtracking Welwyn Viaduct would likely be too small to offset the significant cost. A more cost-effective
solution would be to reduce signalling headways over the section."


Chris

That's an equally important issue. The whole route between Woolmer Green and Bounds Green needs work. It hasn't been upgraded since electrification. To take full advantage of a four-track Welwyn, we need 100 mph slows, 125 mph fasts (if possible) and full ERTMS. This suggests a complete route upgrade, of which the viaduct would only be one part. However, there are probably other priorities at the moment, and the ECML has to take its place at the back of the queue.
--- old post above --- --- new post below ---
Speaking of increasing capacity on that section...one thing that occurred to me when I used to travel that section was that there didn't seem any great obstacles to 6-tracking out to WGC from AAP, enabling the stopping metro services to operate segregated (and thus more frequently) from the suburban (i.e. Thameslink) services, which could then just run FPK, WGC, then all-stations to Peterborough/Cambridge.

In most cases the only obstacles would be the tunnels, and these could be handled quite simply by just widening out the single bores added when the line was quadrupled to give three double bores.

The tricky ones would be Hadley South, Hadley North and Potter's Bar, which are two double-track tunnels. There, you would need a third bore and slew the line over (not sure if there's room, though).

BTW, the Cambridge slows are more to serve intermediate stations south of Stevenage, and tend to be single units, while the semi-fasts are pairs. This works fine from a North Herts perspective.
 