Was'nt Crewe North Junction also to be done to speed up to/from the Manchester direction?

I don't think remodelling Crewe was ever on the WCRM list, as it's "too new".
There was a different plan taking shape to relocate Crewe station southwards quite a way and use the independent lines to reach Manchester, but this was ditched mainly because of local opposition to the move (only then did NR start to repair the roof!).
Somewhere else I read that the famed Manchester South SSC was supposed to take over control of Crewe and Crewe-Liverpool as well as Crewe-Stockport, but that hasn't happened either.
I guess it's all in how NR got the WCRM cost down from £13bn to £8bn - by leaving a lot of big things out!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Butts

Veteran Member
Joined
16 Jan 2011
Messages
11,849
Location
Stirlingshire
Anyone going to Birmingham should seriously consider Flying with this fiasco.

Flybe currently have Flights available from Edinburgh to Birmingham right up to and including X-Mas eve at £21.49pp return in late Dec/Early January from £23.49. I dare say the same is available from Glasgow.

I'm a bit miffed cause I booked em at £29.99 (which was cheap enough) a few weeks ago. :oops:

The big difference is they can be booked now - I am coming back up to Edinburgh December 28th and have just booked a further trip down 30th and back 2nd at these "cheap as chips " prices.

How do they do it ???????
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
Why is it a fiasco ? If you have a major bit of work that needs doing when is it best to do it and how ? I bet NR would love to hear better solutions !
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,127
Location
Birmingham
Anyone going to Birmingham should seriously consider Flying with this fiasco.

Flybe currently have Flights available from Edinburgh to Birmingham right up to and including X-Mas eve at £21.49pp return in late Dec/Early January from £23.49. I dare say the same is available from Glasgow.

I'm a bit miffed cause I booked em at £29.99 (which was cheap enough) a few weeks ago. :oops:

The big difference is they can be booked now - I am coming back up to Edinburgh December 28th and have just booked a further trip down 30th and back 2nd at these "cheap as chips " prices.

How do they do it ???????

I thought the WCML closure was on the southern section by Bletchley? Is there another section to be closed that would affect Birmingham to Scotland trains?
 

Butts

Veteran Member
Joined
16 Jan 2011
Messages
11,849
Location
Stirlingshire
I thought the WCML closure was on the southern section by Bletchley? Is there another section to be closed that would affect Birmingham to Scotland trains?

Humblest apologies :oops: - should have read the whole thread and not made assumptions.

Information may of be interest to anyone doing Edinburgh/Birmingham at X-Mas / New Year who wants to firm up now at a reasonable price.
 

Caertroia

Member
Joined
7 Oct 2010
Messages
44
As usual the media only highly the bads bits, clearly missing that tocs like xc and ec have mostly a normal xmas service with no major engineering work planned.

No, it's a news story, about something out of the ordinary. Thats what news is. What do you want The Guardian to do, run a full page of all the trains that will be running okay on the two days before christmas?
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,127
Location
Birmingham
Humblest apologies :oops: - should have read the whole thread and not made assumptions.

Information may of be interest to anyone doing Edinburgh/Birmingham at X-Mas / New Year who wants to firm up now at a reasonable price.

:) Well New Street was closed last Christmas wasn't it? Are they doing any Gateway work this Christmas?
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
No, it's a news story, about something out of the ordinary. Thats what news is. What do you want The Guardian to do, run a full page of all the trains that will be running okay on the two days before christmas?

It's arguable, though, whether it is right to use the word chaos in headlines and reports. It's unlikely to be chaos, as it is being publicised well in advance and alternatives will be in place. So, unwelcome, yes, chaotic no. The latter word could be applied to quite a few unplanned incidents on the railway, but whenever I have had to use replacement buses it has been normally been irritating, added extra travelling time etc, but it has been also been planned properly, well organised and efficient.
 

Squaddie

Member
Joined
6 Dec 2009
Messages
1,072
Location
London
It's arguable, though, whether it is right to use the word chaos in headlines and reports. It's unlikely to be chaos, as it is being publicised well in advance and alternatives will be in place. So, unwelcome, yes, chaotic no. The latter word could be applied to quite a few unplanned incidents on the railway, but whenever I have had to use replacement buses it has been normally been irritating, added extra travelling time etc, but it has been also been planned properly, well organised and efficient.
However, this probably will be chaos. Passengers herded onto overcrowded shuttle services at Euston, with little or no assistance or advice from station staff, to be dumped at Nuneaton for onward trains that may or may not run - and almost certainly without any sort of seat reservations in place. Passengers will be arriving at their destinations an hour or two later than usual, having travelled in worse conditions, but because the inconvenience is "planned" passengers won't be entitled to any sort of compensation.

All conjecture, of course, but drawing on my own experience of a similar situation on the WCML a few years ago. Britain's railways are a national disgrace.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Britain's railways are a national disgrace.

It's rare that railway closures are national, unlike the complete grounding of all airline flights, which has happened for protracted periods on at least two occasions in the last 10.1 years ... the skies are an international disgrace I say!

Seriously, there is no good time to take major possessions, and if the railway does things in timetabled no-train periods the costs rocket and the public/Britgov Plc complains about the price. Do it midweek and the business community whinge, over bank holidays the leisure sector kicks off, in school holidays the PTEs grumble and during term-time everyone complains.

The only way round any of this is to

BUILD MORE DIVERSIONARY ROUTES
Like HS2​
 

Poggs

Verified Rep - OpenTrainTimes
Joined
28 Aug 2008
Messages
294
Location
London
The only way round any of this is to

BUILD MORE DIVERSIONARY ROUTES
Like HS2​

Then what happens when HS2 has to be closed for engineering work and... oh no! Everyone is forced on to the 'slow' trains! Disgrace.

NR will never please everybody!
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
I'm not saying this for this Christmas but how about EMT HSTs via the Midland Main Line and Hope Valley to cover Manchester / Liverpool? It's been done before over the years (and in May this year also, to get Liverpool fans to Wembley), and as far as I know, there's an undiagrammed HST available on weekends, unless that's the one that went to East Coast. Failing that, 222s? They're certainly cleared that way and often get a couple of yearly outings for Aintree. This may seem a naive question but is there any way an agreement between VT (or FWC) and EMT could be reached to help in future?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
Then what happens when HS2 has to be closed for engineering work and... oh no! Everyone is forced on to the 'slow' trains! Disgrace.
NR will never please everybody!

Supposedly, only one track will be closed at a time and you just switch to the other track with its bi-directional signalling and flight the trains through.
That's how it works on French LGVs and maybe HS1.

One of the claimed advantages of the recent WCRM was bi-directional signalling between Rugby and Lichfield (and Sandbach-Cheadle Hulme on the Manchester line), but I've no idea if it has helped possession planning at all.
I've never seen a train going "wrong line" on these routes.
Doesn't help Bletchley this year of course.
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
However, this probably will be chaos. Passengers herded onto overcrowded shuttle services at Euston, with little or no assistance or advice from station staff, to be dumped at Nuneaton for onward trains that may or may not run - and almost certainly without any sort of seat reservations in place. Passengers will be arriving at their destinations an hour or two later than usual, having travelled in worse conditions, but because the inconvenience is "planned" passengers won't be entitled to any sort of compensation.

All conjecture, of course, but drawing on my own experience of a similar situation on the WCML a few years ago. Britain's railways are a national disgrace.

I've never experienced WCML route closures, so I will bow to your knowledge of the route, but I have to say that it was not like that when the GWML was closed at various points between Christmas and New Year in 2009 and 2010.

Of course on the latter occasion when Reading was closed we took one of the diverted trains via Banbury. Although this made it a much longer journey at least we were spared the annoyances of having to get on and off buses or coaches. This is how things should be wherever possible, as has been said above, use diversionary routes!

In 2009 the line was closed between Newport and Bristol Parkway. There were plenty of coaches, plenty of staff, and the entire operation seemed pretty smooth to me. Neither year was chaos anywhere in sight when we travelled and it was far from a national disgrace.

In fact, I would say that the experiences many travellers in the north day having to travel on overcrowded two car trains day in day out throughout the year is much more of a national disgrace!
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,960
Location
Fenny Stratford
there is some utter wibble written by people on here.

Ok then: when SHOULD the line be closed to do a complete remodel, rewire and resignal that will take the best part of a week. Suggestions please
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
there is some utter wibble written by people on here.

Ok then: when SHOULD the line be closed to do a complete remodel, rewire and resignal that will take the best part of a week. Suggestions please

As far as I'm concerned this thread is more about how to manage line closures than saying it shouldn't be done! ;)
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,960
Location
Fenny Stratford
As far as I'm concerned this thread is more about how to manage line closures than saying it shouldn't be done! ;)

Agreed - i am just saying if it isn't over Christmas, which lets not kid ourselves will be a pain in the rse to travelers, me included, when should it be. That said there are less people expected to travel on these dates

This possession allows for a weeks worth of work with 2 days disruption
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
Agreed - i am just saying if it isn't over Christmas, which lets not kid ourselves will be a pain in the rse to travelers, me included, when should it be. That said there are less people expected to travel on these dates

This possession allows for a weeks worth of work with 2 days disruption

I completely agree. These things have to be done, and I think Christmas and New Year is the best time, even though it becomes a massive pain for us if we want to travel somewhere and the line concerned is one of those that is closed.

We do go, though with a lot of moaning and grumbling to ourselves, and we have always found it to be not quite as bad as we had expected!
 

neilmc

Member
Joined
23 Oct 2011
Messages
1,070
I don't know what the current track usage is on the Midland main line, but surely it can't be anything like as extensive as the WCML? If London-Manchester is busy enough to warrant 3 trains per hour, a regular service via Midland/Hope Valley should surely have been considered even WITHOUT any line closures to maximise North/South potential.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,437
Location
Yorks
I suppose ideally the better time to close the route would be in the period between Christmas and New Year rather than the run up. I guess it's down to whether contractors tend to work over this period.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
there is some utter wibble written by people on here.
Ok then: when SHOULD the line be closed to do a complete remodel, rewire and resignal that will take the best part of a week. Suggestions please

I think the point of the newspaper item is that the competition (air, road, ferry) does not simply give up over bank holidays and say "sorry, it has to be done".
It's an Achilles heel for rail.

If, say, you are trying to book a train to Euston to connect with flights for a skiing holiday over Christmas/New Year you would find the whole process useless.
Even three months out nobody can tell you what will/won't be running, or by what route.
Meanwhile the flights will have been on sale for a year.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,960
Location
Fenny Stratford
I think the point of the newspaper item is that the competition (air, road, ferry) does not simply give up over bank holidays and say "sorry, it has to be done".
It's an Achilles heel for rail.

If, say, you are trying to book a train to Euston to connect with flights for a skiing holiday over Christmas/New Year you would find the whole process useless.
Even three months out nobody can tell you what will/won't be running, or by what route.
Meanwhile the flights will have been on sale for a year.

but with the greatest of respect the airlines dont have to upgrade, repair or replace their routes and the infrastructure owner only has one bit of infrastructure to cover! Once you research the runways what else do you do?

again - If you dont do the work over the quietest periods ( school holidays, bank holidays Christmas) when DO you do it?

Someone has to take the hit; either the commuter paying a great deal every day or the leisure traveler paying still quite a lot on a less regular basis. Who do YOU want to upset?
 

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
If major projects aren't carried out at quiet times, then the railway wouldn't be able to function at busy times & it just causes a knock on effect & cause major problems.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
I think the point of the newspaper item is that the competition (air, road, ferry) does not simply give up over bank holidays and say "sorry, it has to be done".

That's true about air and sea travel, but roads (from country tracks up to four-lane motorways) are subject to engineering closures as well as rail. Sometimes for weeks on end (the A303 has been quite bad for this recently, as the closures always seem to line up with school holidays, when it should be busiest).

Difference with roads being that diversions are extremely easy to arrange and manage, being as a) there are lots of roads everywhere so there are many appropriate diversions and b) there are obviously no problems with no suitable vehicles or no driver knowledge.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,139
Location
Redcar
again - If you dont do the work over the quietest periods ( school holidays, bank holidays Christmas) when DO you do it?

In this case of this work? A couple of days later so you avoid the run up to Christmas and do it entirely between Christmas and New Year.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
but with the greatest of respect the airlines dont have to upgrade, repair or replace their routes and the infrastructure owner only has one bit of infrastructure to cover! Once you research the runways what else do you do?

again - If you dont do the work over the quietest periods ( school holidays, bank holidays Christmas) when DO you do it?

Someone has to take the hit; either the commuter paying a great deal every day or the leisure traveler paying still quite a lot on a less regular basis. Who do YOU want to upset?

I'm not objecting to the work being done, and I understand the constraints.
But I do think it should be a lot better managed from the public's point of view (details published earlier, single line/reversible working used, diversions rather than buses etc).
Extended journey times should also attract lower fares (the TOCs get compensated, why not the passengers?).
 