LNW-GW Joint
Veteran Member
Was'nt Crewe North Junction also to be done to speed up to/from the Manchester direction?
I don't think remodelling Crewe was ever on the WCRM list, as it's "too new".
There was a different plan taking shape to relocate Crewe station southwards quite a way and use the independent lines to reach Manchester, but this was ditched mainly because of local opposition to the move (only then did NR start to repair the roof!).
Somewhere else I read that the famed Manchester South SSC was supposed to take over control of Crewe and Crewe-Liverpool as well as Crewe-Stockport, but that hasn't happened either.
I guess it's all in how NR got the WCRM cost down from £13bn to £8bn - by leaving a lot of big things out!
Well New Street was closed last Christmas wasn't it? Are they doing any Gateway work this Christmas?