swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,300
Unlikely to happen as the modellers hope the capacity increase by this project will last until the slow lines go into the crossrail 2 tunnels.
Thanks for confirming that, it did seem a fairly logical explanation hence me suggesting it in the earlier post.