It should be possible, with Voyagers being diesel electric I believe they are considering fitting them, which im sure would be very much welcomed by everyone
Yes definitely! How about a speed upgrade to 140mph? If we could do that, get bombardier to build a load of 222s like this and cancel expensive and not as good IEP! Job done!
Plus we could divert the money to more electrification and cancel the 17b HS2, using the money to upgrade WCML and GWML. Some of these politicians haven't a clue when it comes to railways- let's just hope Philip Hammond is clued up on it!![]()
Plus we could divert the money to more electrification and cancel the 17b HS2, using the money to upgrade WCML and GWML. Some of these politicians haven't a clue when it comes to railways- let's just hope Philip Hammond is clued up on it!![]()
Yes definitely! How about a speed upgrade to 140mph? If we could do that, get bombardier to build a load of 222s like this and cancel expensive and not as good IEP! Job done!
Plus we could divert the money to more electrification and cancel the 17b HS2, using the money to upgrade WCML and GWML. Some of these politicians haven't a clue when it comes to railways- let's just hope Philip Hammond is clued up on it!![]()
Are you suggesting adding a further coach to the Voyagers, making them 5 and 6 cars?
If so, then the pantograph car is going to do an extreme amount of work
The next issue will be distributing the electricity to the other cars
The train will be moving the "dead weight" of the diesel engines
Finally, these units are already inefficient and expensive to operate, an extra diesel powered coach increases these costs further
They should be made to 6 car trains.Are you suggesting adding a further coach to the Voyagers, making them 5 and 6 cars?
If so, then the pantograph car is going to do an extreme amount of work
The next issue will be distributing the electricity to the other cars
The train will be moving the "dead weight" of the diesel engines
Finally, these units are already inefficient and expensive to operate, an extra diesel powered coach increases these costs further
Perhaps the conversion could be in two parts
The Cross Country ones could be partial conversions, allowing bi-mode
The West Coast ones could be complete conversions, for electric only, which would include removal of the diesel engines completely
This would then also free up some internal space currently occupied by the exhaust system
I realise the additional car would be a trailer, the same as on the Class 390The pantograph car would be a trailer, but would power the traction motors in the other cars of the train.
It's not as if the Voyagers are underpowered anyway.
Are you suggesting adding a further coach to the Voyagers, making them 5 and 6 cars?
If so, then the pantograph car is going to do an extreme amount of work
The next issue will be distributing the electricity to the other cars
The train will be moving the "dead weight" of the diesel engines
Finally, these units are already inefficient and expensive to operate, an extra diesel powered coach increases these costs further
Perhaps the conversion could be in two parts
The Cross Country ones could be partial conversions, allowing bi-mode
The West Coast ones could be complete conversions, for electric only, which would include removal of the diesel engines completely
This would then also free up some internal space currently occupied by the exhaust system
Yes, they are identical units, just with the addition of the tilting mech in the 221's![]()
I realise the additional car would be a trailer, the same as on the Class 390
No, they are not.
A 221 is not compatible with a 222 BECAUSE their wiring and electrics is different.
I suspect you are thinking of 220 vs 221.
Bodyshell is the same.
Plus electric is capable of supplying much more power then the diesel engines...

If you are going with the bother of building a pantograph car, why have they never bothered converting them to 7-8 car sets as well?
I'll say this until I'm blue in the face - if there were ever the need to couple Voyagers and Meridians, it would not be beyond the wit of man to make them compatible.
I'll say this until I'm blue in the face - if there were ever the need to couple Voyagers and Meridians, it would not be beyond the wit of man to make them compatible.
Thats exactly what I've been saying, adding a pantograph coach would increase capacity and cut down on emissions by allowing the Voyagers (and possibly Meridians south of Bedford) to run from overhead lines where they can. Theres no need to replace the IC225 trains yet, and with HS2 we could displace the pendo's onto the GWML.
I disagree with you on HS2 though, its the most cost effective way to increase capacity between London and Rugby, the route of which will be running over capacity by the time HS2 would be finished.
Off topic, but on the subject of 313s, where does rectification take place, on the PTSO or the Motor coaches? I know that travelling in a 313 motor coach on AC there is a hum, suggesting the presence of 50Hz AC. Oviously the 314s and 315s supply AC to the motor coaches as it's needed for the thyristors (and the hum is very noticable on them). Another thing I've always wonders is how similar 313, 314 and 315 PTSOs and 313, 507 and 508 motor coaches are and if they are interchangeable (for example in the event of an accident or fire). I know their weights are slightly different and their are cosmetic differences (window layout at the pan end), but that's another issue.
What would be the point displacing Pendos on the GWML? What would replace the Pendos on WCML?