Question: what proportion of electrification schemes in London and SE in the past 30 years came with new trains? (Projects funded by BAA do not count)
The response to this question is deafening!
Question: what proportion of electrification schemes in London and SE in the past 30 years came with new trains? (Projects funded by BAA do not count)
What is the failure rate of existing PEP-family stock? My understanding was that it's pretty low due to their fairly simple nature.HSTEd said:4. And reliability is not that important because if a unit decides it doesn't want to work one morning you have carriage sidings that stretch as far as the eye can see, all of them full of alternative units.
Aberthaw Power Station on Vale of Glamorgan, Tower Open Cast at the end of the Aberdare line and the open cast at Cwmbargoed off the Rhymney line all have daily trains and mean every single diagram in the Valleys except the Bay Shuttle shares tracks with heavy freight.
The Manchester Metrolink system, by its original use of existing heavy-rail platforms on the Manchester to Bury line and the Manchester to Altrincham line, is one of those systems that do not have ground-level access facilities and if the decision to retain all the existing heavy-rail platforms on the Valley Lines stations (how many stations would be involved ?), similar rolling stock would be required there.
Yes, in fact the new M5000 would be ideal on a converted valley lines running high floor trams as in Manchester....
On the proviso they don't go any faster than 45mph - the Sale line is vomit inducing at 50mph
The Hitachi Bi mode IEP is essentially an electric that turns itself into a DMU and hundreds of carriages of them are being built,
97 DMU Coradia Lints have just been ordered by the German Federal Government. Funny how the UK and German Governments have got around the emissions issue and are ordering fleet size underfloor DMU's.
97 DMU Coradia Lints have just been ordered by the German Federal Government. Funny how the UK and German Govternments have got around the emissions issue and are ordering fleet size underfloor DMU's.
I don't think not wanting 40 year old stock which is essentially life expired can be described as gold plating everything
It is my understanding that phasing expenditure by spending on new electricification intrastructure first while using redeployed older rolling stock and then procuring new rolling stock later (up to about 10 years) is a well proven approach which has worked elsewhere.
The old Southern Railways/Southern region would then take bits off the 50 year old rolling stock resulting and incorporate them into "new" trains (cf the class 442 problems.....).
Yes there have been some examples of that including West Yorkshire where I come from, but even there the 308's were replaced at 40 years old.
Somebody suggested a 321 demonstrator style refurb for such as 313/315's although I doubt such a refurb would be justified on such an old train, plus the MK2 design isn't the best, at least the MK3 based designs are meant to be fairly robust with good crashworthiness.
Somebody suggested a 321 demonstrator style refurb for such as 313/315's although I doubt such a refurb would be justified on such an old train, plus the MK2 design isn't the best, at least the MK3 based designs are meant to be fairly robust with good crashworthiness.
Question: what proportion of electrification schemes in London and SE in the past 30 years came with new trains? (Projects funded by BAA do not count)
The original Thameslink came with new 319s didn't it, with its few hundred yards of new 3rd rail?
The ELL got 378s.
WLL also got various new stock on Southern services, and Eurostars.
HS1 got 395s.
King's Cross outers got the recycled Thameslink 317s.
PS Stansted got new 322s.
Question: what proportion of electrification schemes in London and SE in the past 30 years came with new trains? (Projects funded by BAA do not count)
The Q is do you spend £Ms on a capital upgrade (VLE) only to leave a heavily subsidised network (if HR)
Or do you spend perhaps a little more £M (perhaps phased) and convert the whole core valley network to tram (again perhaps phased) which can run at low/perhaps even zero operational subsidy and offer higher frequencies and shorter journey times (driving higher demand) at the same time.....
And pretty sure the WLL and ELL were electrified long before the 1980s......
The original Thameslink came with new 319s didn't it, with its few hundred yards of new 3rd rail?
The ELL got 378s.
WLL also got various new stock on Southern services, and Eurostars.
HS1 got 395s.
King's Cross outers got the recycled Thameslink 317s.
PS Stansted got new 322s.
You missed the whole point of the question.
None of the things you listed counts under the question posted.
The possible argument of Thameslink which actually wasn't an electrification scheme but rebuilding the railway on disused land.
ELL yes, but WLL was done for the tunnel freight traffic in 1993 , and the passenger service was operated on opening by... Class 313s. Which were perfectly adequate until Westfield opened.
So without suitable trains, the "bit in the middle" wouldn't work!What point would that be?
Every one of the lines I listed was electrified/newly built since 1984, and is in London and the SE.
Thameslink 1 got 86 new trains even though there were perfectly usable electric trains in use on the northern and southern ends, without the bit in the middle.
Are you saying that the Eurostar stock was provided new in 1993 for the WLL DC electrification? The WLL services joined those of the NLL services requiring provision of enough AC/DC stock to run the whole timetable. Once again, there were no 313s or equivalent to cascade.By WLL I meant the West London line, in case anyone was confused, electrified as part of the Channel Tunnel routes scheme.
Would you suggest that Thameslink should not have happened at all then?Thameslink 1 got 86 new trains even though there were perfectly usable electric trains in use on the northern and southern ends, without the bit in the middle.
What point would that be?
Every one of the lines I listed was electrified/newly built since 1984, and is in London and the SE.
Thameslink 1 got 86 new trains even though there were perfectly usable electric trains in use on the northern and southern ends, without the bit in the middle.
By WLL I meant the West London line, in case anyone was confused, electrified as part of the Channel Tunnel routes scheme.
The 313s and other PEP based designs have aluminium bodyshells. As well as being lighter than steel, aluminium is also much more resistant to corrosion, contributing to the units' longevity. Although not record breakers in this respect they are also comparatively reliable. A heavy refurb of the interiors and fitting of modern information systems together with wi-fi could produce a very modern looking functional train, that could be indistinguishable from a new train if done well. There are no toilets to worry about, which shouldn't be too much of a problem for typical journey length on the Valleys network, and it's unlikely that any alternative tram based replacements for the current diesel fleet would have toilets either.
The ideal scenario for the Valleys would be for a fully refurbished 31x fleet to be deployed in the medium term, growing the business such that a new train or tram order can be better justified in the future. I don't think the passenger cares and certainly most wouldn't have a clue of the real age of a rail vehicle (unless a big fuss about such things is made by politicians and the media), as long as it is attractively fitted out inside, clean and reliable. I think the 313 exterior also looks quite modern too - their 70s styling has aged well.
Ok yes I stand corrected about the aluminium design, however If the 313's are so good with loads of like left in them as you seem to think maybe TSGN should keep them and not replace them. Personally I would rate them worse than a Railbus
The 313s and other PEP based designs have aluminium bodyshells. As well as being lighter than steel, aluminium is also much more resistant to corrosion, contributing to the units' longevity. Although not record breakers in this respect they are also comparatively reliable. A heavy refurb of the interiors and fitting of modern information systems together with wi-fi could produce a very modern looking functional train, that could be indistinguishable from a new train if done well. There are no toilets to worry about, which shouldn't be too much of a problem for typical journey length on the Valleys network, and it's unlikely that any alternative tram based replacements for the current diesel fleet would have toilets either.
The ideal scenario for the Valleys would be for a fully refurbished 31x fleet to be deployed in the medium term, growing the business such that a new train or tram order can be better justified in the future. I don't think the passenger cares and certainly most wouldn't have a clue of the real age of a rail vehicle (unless a big fuss about such things is made by politicians and the media), as long as it is attractively fitted out inside, clean and reliable. I think the 313 exterior also looks quite modern too - their 70s styling has aged well.