craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,827
Nothing. No current bi mode locos at all which would be capable. 68s the best diesels, but unlikely that DRS would have enough for this. 67s probably available, but their performance isn't great.

Exactly. So as strange as it is for XC to need to alter it's timetable to make it work, it makes more sense then using them to replace Voyagers when there's pretty much nothing available that can match their performance.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tetudo boy

Member
Joined
5 Apr 2018
Messages
382
Location
Near Liverpool
CrossCountry could use some to increase capacity, but I don't know what loco could be used for them. Maybe some Class 67's if they are available and compatible?
 

Metal_gee_man

Member
Joined
28 Oct 2017
Messages
672
Class 90, 140mph? Are you thinking of 91s?
Yes I was, why did I type 90s? You all knew what I meant, but you've all brought up a decent argument for acceleration but not because its a crappy idea (I'll take that as a sort of win)
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,398
Location
"Marston Vale mafia"
I've seen some suggestions on this forum...

Crosscountry splitting their services for the sake of using electrics sounds like a rather bizarre way to tackle things. If anyone was really dead set on using these Mark 4s the most sensible thing would be a diesel or bi-mode loco haul

I think the reason this is seriously being considered (and I don't think I'd put something published in Modern Railways on the same level as suggestions on here, though it's amazing how often suggestions on here get rubbished then come true) is that Arriva already lease them and may well have no get-out clause, so if they're paying for them and XC needs capacity they might as well use them.

== Doublepost prevention - post automatically merged: ==

CrossCountry could use some to increase capacity, but I don't know what loco could be used for them. Maybe some Class 67's if they are available and compatible?

XC are proposing to run them between Manchester and Birmingham using Class 90s, as it's all wired.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
CrossCountry could use some to increase capacity, but I don't know what loco could be used for them. Maybe some Class 67's if they are available and compatible?

67s aren't compatible as things stand - could be done, but would require work to both locos and stock.

There probably are enough - DB have a number stored. However, their acceleration is not good so they are not ideal for busy routes. They wouldn't be able to keep to Voyager timings.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I think the reason this is seriously being considered is that Arriva already lease them and may well have no get-out clause, so if they're paying for them and XC needs capacity they might as well use them.

Beware the sunk cost fallacy. They've got the carriages which they've got to pay for, but that doesn't mean it's worth then spending additional on locos, staff, etc. Particularly in these times when there's not going to be any additional revenue for it, and the DfT would seem reluctant to pay for anything they've not asked for
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,398
Location
"Marston Vale mafia"
Beware the sunk cost fallacy. They've got the carriages which they've got to pay for, but that doesn't mean it's worth then spending additional on locos, staff, etc. Particularly in these times when there's not going to be any additional revenue for it, and the DfT would seem reluctant to pay for anything they've not asked for

It seems DaFT have asked them to increase capacity, though, as they have (also according to the same article) leased 2 additional HST power cars so they can add another HST diagram (presumably on a day when the existing ones would be being maintained, so there'd be a set of coaches sitting around unused).
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
It seems DaFT have asked them to increase capacity, though, as they have (also according to the same article) leased 2 additional HST power cars so they can add another HST diagram.

Those two power cars are effectively maintenance spares - they have up until now had ten power cars for five sets, which is not sufficient (there were no others available at the time when they acquired their HSTs).

If they are going back to running four out of five sets, that's only what they were doing anyway back in the earlier years.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
It seems DaFT have asked them to increase capacity, though, as they have (also according to the same article) leased 2 additional HST power cars so they can add another HST diagram (presumably on a day when the existing ones would be being maintained, so there'd be a set of coaches sitting around unused).

They may have asked them to increase capacity, but they'll only agree to pay for the certain capacity and method of implementation they've agreed (the additional power cars). It's not impossible that Arriva said to the DfT as part of the latest (and recently announced) negotiations "hey, we've got these Mk4s", but they'd have been shouting about tens of thousands of extra seats if these had been included. The negotiations could still be ongoing and something that'll get triggered under certain conditions, but I'm doubtful
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,275
Ooh! Seem's interesting. They could replace the Liverpool to Birmingham service because LNWR is interested in running services to Manchester instead.
Are LNWR really wanting to do that? Or has it been suggested so many times by forum members it’s assumed a life of its own? But as others have already mentioned in their replies, it’s been reported as Manchester anyway.

It seems DaFT have asked them to increase capacity, though, as they have (also according to the same article) leased 2 additional HST power cars so they can add another HST diagram (presumably on a day when the existing ones would be being maintained, so there'd be a set of coaches sitting around unused).
Wasn‘t the future additional HST diagramming, (to be achieved with the extra power cars), already announced by DfT in early 2020 anyway, so that bit is just confirming something already known?

It was covered in all the mags back when the extra XC 170 centre cars was in the headlines...
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
Are LNWR really wanting to do that? Or has it been suggested so many times by forum members it’s assumed a life of its own? But as others have already mentioned in their replies, it’s been reported as Manchester anyway.
It has died off, but Manchester Airport was a serious proposal.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,818
Those two power cars are effectively maintenance spares - they have up until now had ten power cars for five sets, which is not sufficient (there were no others available at the time when they acquired their HSTs).

If they are going back to running four out of five sets, that's only what they were doing anyway back in the earlier years.
It was sufficient way back when XC first started the franchise as 4 from 5 sets were diagrammed daily. However, they’re another 10 years older and are maintained by Laira now.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
It was sufficient way back when XC first started the franchise as 4 from 5 sets were diagrammed daily. However, they’re another 10 years older and are maintained by Laira now.

It wasn't really - tended to result in Voyager substitutions reasonably often.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,692
Unless of course WMT are indeed withdrawing one path which I believe is planned north of Northampton?
They have binned one south of Northampton, not aware of them getting rid north of there. Even then I don't believe that is permanent.
 

chorx18

Member
Joined
13 Mar 2017
Messages
8
Would love to see the loco swap reinstated at New Street but don't think that's likely to happen!
 

cjmillsnun

Established Member
Joined
13 Feb 2011
Messages
3,275
That was talked about years ago, and clearly not viable as it wasn't progressed. There are significant problems with incompatible electrical systems.
The electrical systems aren’t a big issue as static converters could be fitted in the HST PCs could easily do the voltage conversion. The issue is that the Mk4s are out of gauge. There was an excellent post on this forum some time back about it.
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
Crosscountry splitting their services for the sake of using electrics sounds like a rather bizarre way to tackle things. If anyone was really dead set on using these Mark 4s the most sensible thing would be a diesel or bi-mode loco haul

XC are proposing to run them between Manchester and Birmingham using Class 90s, as it's all wired.

I wonder if any combination of locos could offer the capability of a "push-push" configuration, with a Class 90 at one end and a diesel at the other, powered by either alone, and controllable from each end?
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
I wonder if any combination of locos could offer the capability of a "push-push" configuration, with a Class 90 at one end and a diesel at the other, powered by either alone, and controllable from each end?

Not without work, and the only diesels which are likely to be available are 67s, which have poor acceleration.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Not without work, and the only diesels which are likely to be available are 67s, which have poor acceleration.
It also has to be cheaper than new build stock, once the work which needs doing is more than changing the seat covers, carpets, interior branding, livery and possibly (but not needed) changing of seats, it is getting towards the same price as just some new Hitachi units, I would imagine the work needed to make 90s and 67s work together with mk4s at the same time would be more than the leasing cost of new Hitachis.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
It also has to be cheaper than new build stock, once the work which needs doing is more than changing the seat covers, carpets, interior branding, livery and possibly (but not needed) changing of seats, it is getting towards the same price as just some new Hitachi units, I would imagine the work needed to make 90s and 67s work together with mk4s at the same time would be more than the leasing cost of new Hitachis.

It would almost certainly be cheaper to use Mk4s - but would result in a train with crap acceleration (on diesel, anyway).

Mk4s might be OK as as short-term stopgap (if used only with electric locos), but aren't really a long-term solution for XC.

It remains to be seen whether it actually happens, of course!
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Musing on the proposal for XC to use the Mk 4 sets...

Given a 90 minute journey time, 4 sets would neatly cover a standalone Piccadilly-New Street service, albeit needing a Voyager as a spare. Plus something of a rework to the timetable.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,818
The electrical systems aren’t a big issue as static converters could be fitted in the HST PCs could easily do the voltage conversion. The issue is that the Mk4s are out of gauge. There was an excellent post on this forum some time back about it.
The design for the electrical system was done, as I understand it - the plan was to put the static converters at the end of the TOE, which makes the cost significantly less as there'd be (roughly) half the number of vehicles to convert.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
they could reverse at International (perhaps another diagram).

New St capacity might depend on how much of the current timetable ends up thrown in the air post-Covid, if XC ends up going through a fundamental rethink. Away from XC, the CrossCity reduction to 4tph looks like a permanent change - hitherto unthinkable. Not much may be off the table (said speculatively).
 

CW2

Established Member
Joined
7 May 2020
Messages
2,222
Location
Crewe
Having trawled through my stock of used fag-packet calculators, I'd suggest the way to use 90s + Mk 4 stock on Manchester - Birmingham would indeed be to split the Manchester - West of England service in two.
Something like:

Manchester Piccadilly depart 07:58 (minimum headway behind xx:55 Euston)
New Street arrive 09:28
New Street depart 09:38
Manchester Piccadilly arrive 11:10

connecting at New Street into / out of

Ex West of England arrive 09:25
To West of England depart 09:42
(West of England to / from New Street timings unaltered)

Some tweaking of the Manchester Stoke all-stations local would be needed to get the xx:58 Picc - New Street through Stoke without delay.
I haven't attempted to prove these paths in detail - I'm sure somebody with access to the necessary train planning software will be along shortly to point out where I've gone wrong!
On the surface though, this looks doable.
Incidentally I don't agree with the narrative that class 90s are especially sluggish. Given the size of train we're discussing here, I suspect they would be quite sprightly. They would lose time on the Stafford - Wolverhampton section which is 125 mph, but only maybe a minute.
 
Last edited: