• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Unelectrified transfer lines in London (Private Eye)

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,548
Location
Preston Lancs
In terms of what's been added to the electrified network since 2010, there's not really been much that is useful for freight yet.

The biggest one is Gospel Oak - Barking, which has made future electric to Thames Gateway (+Purfleet/Dagenham/Tilbury) more practical, as already discussed.

Indeed. So glad that got done. I know it was London but at the time money was being spent elsewhere too. GOBLIN was and is a great piece of infrastructure to be electrified and makes future infills so much easier.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
Carlton Rd - Junction Road comes up regularly; and the amount of freight that would switch to electric haulage if it was (expensively) electrified is precisely nil. There’s plenty of people in the industry who still haven’t realised that.

Acton Wells to Acton Main Line is a better example, as is the London Gateway branch, Acton Wells to West London Jn, and Acton Wells to Harlesden J via Acton Canal Wharf.

The trouble with all these connections, though, is that they are linking up different feeding sections, which means complex electrical sectioning (as per Gospel Oak - Barking), and that makes short stretches very expensive.

As ever, treat the writings of “Dr B Ching” with extreme caution.
Acton Wells (ECR: Rugby) - Acton ML (ECR: Didcot): Neutral Section required
Junction Rd (ECR: Rugby) - Carlton Rd (ECR: York): NS req'd, plus lots of civils work
On the GOBLIN: Gospel Oak - South Tottenham (inc.) has Rugby as its ECR, and South Tottenham (exc.) - Barking has Romford as its ECR.

Sectioning between all the different ECRs, and all the signalling changes that would need to occur if any of these lines were to be electrified, looks like an absolute nightmare. However, a Static Frequency Converter (as installed for Potteric Carr Independent Feeder last year) could be a way around the phase imbalances between the feeders.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,321
Carlton Rd - Junction Road comes up regularly; and the amount of freight that would switch to electric haulage if it was (expensively) electrified is precisely nil. There’s plenty of people in the industry who still haven’t realised that.
Looking at it from a Goblin passenger train, would have thought the Junction Road link westbound could be done entirely on gravity - looks like it's about 1 in 50 downhill all the way!
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,941
Looking at it from a Goblin passenger train, would have thought the Junction Road link westbound could be done entirely on gravity - looks like it's about 1 in 50 downhill all the way!

Indeed. Unfortunately most freight traffic that way is empty, and loaded going the other way!
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
Surely it's what the class 88 is for?
The 88, and the abilities it offers, is currently used by DRS alone. For DB Cargo, Freightliner, and GBRf (the only operators who run intermodals, unless Colas joins the fray), they need to rely on having shunters at terminals with their current fleet.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Not to mention that if enough yards and terminals are electrified, it's much better value to have a diesel (or battery!) shunter or two at each of them and pure electric locos on the mainline, rather than procuring lots of bi-modal locomotives which spend most of their lives not using their expensive bit
 

Dunfanaghy Rd

Member
Joined
16 Sep 2019
Messages
466
Location
Alton, Hants
Another embuggerance is the 3rd-rail from Southampton to Basingstoke, to Kew, and to North Pole. To run E-locos would require a bi-current electro-diesel, which is a lot to fit in a UK gauge body. The 'Electric Spine' would have dealt with that, but by not running to Brum and the North-West it missed a trick, as that's where the traffic goes (wouldn't expect DaFT to know that, of course).
Pat
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
Another embuggerance is the 3rd-rail from Southampton to Basingstoke, to Kew, and to North Pole. To run E-locos would require a bi-current electro-diesel, which is a lot to fit in a UK gauge body. The 'Electric Spine' would have dealt with that, but by not running to Brum and the North-West it missed a trick, as that's where the traffic goes (wouldn't expect DaFT to know that, of course).
Pat
Indeed it would, however the handling of GWEP (amongst many other factors) kiboshed it into the long grass very quickly, especially with regards the conversion from DC to AC making everything that much more complex.
Feeding arrangements would have to change, signalling arrangements would have to change (not sure if the signalling from Basingstoke to Southampton MCT is AC-immune), major civils work would inevitably have to take place (the tunnels in Southampton, Popham, Waller's Ash & Litchfield, among others), etc., etc.

And that's even before you order the materials for the work, the labour, and the plant for the work...
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,548
Location
Preston Lancs
Not to mention that if enough yards and terminals are electrified, it's much better value to have a diesel (or battery!) shunter or two at each of them and pure electric locos on the mainline, rather than procuring lots of bi-modal locomotives which spend most of their lives not using their expensive bit
Almost worthy of its own thread but yes, an electric shunter is needed or will be in future for use in the UK. I am surprised it has not happened before now.
 

apk55

Member
Joined
7 Jul 2011
Messages
446
Location
Altrincham
Modern electric locomotives can achieve such high power weight ratios that ballast is often needed. A class 88 can not achieve full power output until it is doing almost 50MPH (because of tractive effort limitations) so increasing the power output would achieve little benefit for most freight operations.
Adding a small diesel generator to an electric loco probably does not cost much and acts as a useful ballast weight. As well as being able to shunt off line they would have the advantage
a/ Self rescue in event of a power failure
b/ Rescue other trains in event of a power failure. A class 88 could move any passenger train at modest speed out of trouble.
C/ work engineering trains
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,361
Our main problem is that operators still seem to believe in the mixed traffic locomotive, at least for electrics.

Noone has decided to make a dual voltage electrodiesel yet, but then again they are turning out Bo-Bo locomotives that are clearly not optimised for freight operations.

We have no idea whether a Class 88/92 hybrid is possible on a Co-Co locomotive body yet.
And it looks like we won't find out any time soon.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,663
Acton Wells (ECR: Rugby) - Acton ML (ECR: Didcot): Neutral Section required
Junction Rd (ECR: Rugby) - Carlton Rd (ECR: York): NS req'd, plus lots of civils work
On the GOBLIN: Gospel Oak - South Tottenham (inc.) has Rugby as its ECR, and South Tottenham (exc.) - Barking has Romford as its ECR.

Sectioning between all the different ECRs, and all the signalling changes that would need to occur if any of these lines were to be electrified, looks like an absolute nightmare. However, a Static Frequency Converter (as installed for Potteric Carr Independent Feeder last year) could be a way around the phase imbalances between the feeders.

Why was the T&H Route electrified with the split between ECRs at South Tottenham rather than to the west towards Haringay Park? South Tottenham itself was previously under Romford ECR and now there is a situation where a train can leave Romford control just after Tottenham South Jn, pass into Rugby Control and then approaching Sevens Sisters return to Romford Control again. Seems a risky thing to do.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,809
Location
SW London

”A 60 year old diesel shunting locomotive has been re-engineered with a low-emission hybrid traction package using automotive technology, as part of a research programme backed by the UK’s Department for Transport”

An electric 08. Interesting to note that the class 08 design can trace its lineage back to the LMS's very first shunter, No 1831, which was converted from a "Jinty" steam engine in 1927. (Frames, wheels and coupling rods).

(My own 60-year old Hornby 08 is now running on a secondhand Triang "Jinty" steam chassis - so it's an electrically powered model of a diesel loco on a steam chassis)
 
Last edited:

Dunfanaghy Rd

Member
Joined
16 Sep 2019
Messages
466
Location
Alton, Hants
An electric 08. Interesting to note that the class 08 design can trace its lineage back to the LMS's very first shunter, No 1831, which was converted from a "Jinty" steam engine in 1927. (Frames, wheels and coupling rods).

(My own 60-year old Hornby 08 is now running on a secondhand Triang "Jinty" steam chassis)
They say there is a prototype for everything.
Pat
 
Status
Not open for further replies.

Top