New paper from TfL Board Programmes and Investment Committee

Reducing some planned expenditure, but few others being increased.

Includes photos and/or descriptions of works at :
Knightsbridge, Paddington, Kings Cross, Waterloo, Leyton, Ladbroke Grove, Stratford, Tottenham Hale, West Ham, Colindale,

Some stations are getting new or additional entrances

Also some info on Acton AC02 shed


== Doublepost prevention - post automatically merged: ==

Appears Cannon Street entrance at Bank is finally open

 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,051
Location
West Wiltshire
From page 74-75 of TfL Board, mayor's transport strategy

Bakerloo line upgrade
Stage one of the Bakerloo Line Upgrade will replace the existing, life-expired fleet of trains which are currently 51 years old. A new maintenance facility will also be constructed at Stonebridge Park to replace the current facility which requires extensive reconfiguration and upgrading for the maintenance of a modern fleet. Other works such as power and upgraded communications systems will also be required to enable the introduction of new trains. Feasibility work has started to help inform the delivery strategy and to develop the scope of the project. A priced option currently exists for the purchase of new trains for the Bakerloo line within TfL’s contract with Siemens Mobility Ltd for the supply of the new Piccadilly line fleet. By exercising this contract option, and subject to funding, new trains on the Bakerloo line could be introduced from the late 2020s. These new trains will provide significant benefits to customers with improved reliability

 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
Yes it is indeed excellent news. Very glad that they have finally come round to the idea that the bakerloo needs the work more than other deep level roots. I know that money is still tight due to the unrest between TFL and central government but surely, even with inflation and high costs as they currently are comma with the number of passengers using the system again and the Elizabeth line as it is I should imagine the financial strain is not quite as bad as they feared it might be. On a side note, my screen reader isn't handling that paper particularly well, what is happening at king's cross?
 

tomuk

Established Member
Joined
15 May 2010
Messages
2,009
Yes it is indeed excellent news. Very glad that they have finally come round to the idea that the bakerloo needs the work more than other deep level roots. I know that money is still tight due to the unrest between TFL and central government but surely, even with inflation and high costs as they currently are comma with the number of passengers using the system again and the Elizabeth line as it is I should imagine the financial strain is not quite as bad as they feared it might be. On a side note, my screen reader isn't handling that paper particularly well, what is happening at king's cross?
TfL have arranged for the entrance on the south side of Euston Road directly opposite Kings Cross to be replaced with a new step free entrance incorporated into the new building being built to replace Belgrove House.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
Ooo that will be useful., I find that entrance has some value but it's lack of step 3 can be a nuisance if either myself or the people I'm traveling with have luggage as is often the case when attempting to use it.
 

Backroom_boy

Member
Joined
28 Dec 2019
Messages
583
Location
London
TfL have arranged for the entrance on the south side of Euston Road directly opposite Kings Cross to be replaced with a new step free entrance incorporated into the new building being built to replace Belgrove House.
Ah it's the entrance to the underpass to KX on Euston Road, I was thinking it was the old Thameslink entrance.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,172
Location
0035
Ah it's the entrance to the underpass to KX on Euston Road, I was thinking it was the old Thameslink entrance.
It’s a shame it isn’t the old Kings Cross Thameslink entrance, which has been closed full time since Covid start, and even before that was open with limited hours. This entrance has a bus stop right outside whereas the current south side entrances or the new Belgrove House entrance do not. Admittedly it’s only useful for the Victoria line.

The nine minute step free saving doesn’t add up. Whilst the pedestrian crossing timings are very pedestrian unfriendly it does not take that long to cross the road, and if it did then that is a poor reflection on TfL who are responsible for traffic light timings. I know it’s being funded by the development, but personally feel the money better spent elsewhere.
 
Status