306024
Established Member
The third program was just as informative, and hopefully as others have suggested further series could run right up to the opening ceremony.
Last edited by a moderator:
I wonder if closer to the line opening they'll do some programs about fitting out the tunnels and station and maybe even the rolling stock?
Yep, you're right - got my figures the wrong way round!
Really enjoying the series, the second and third episode seem to be a lot more engineering focused than people focused like the first episode.
The building of the new Canary Wharf station is amazing, although I am surprised they didn't go into any detail as to why it's pretty much completed with 4 years spare when other stations are just getting underway.
To build a new motorway in the UK typically costs £24m per mile (or £38m per km). The proposed M4 relief road in south Wales is 23km in length, which suggests a cost of about £900m. Once you add in the required junctions, feeder roads and the difficulties of constructing a motorway on terrain such as the Gwent Levels, a billion pounds is pretty much exactly what you'd expect it to cost.
The M4 connects the three largest conurbations in Wales (Swansea, Cardiff and Newport) with each other and with England, and is of vital importance to the Welsh economy. A new motorway is required because the existing M4 is narrow, meandering, not fit for purpose - for example, it does not have a hard shoulder for much of its length - and is extremely congested.
Probably because it isn't nearly finished. There's a lot of work to do including setting up the retail areas and the roof gardens. It is the largest Crossrail station in the project, so why make it the last thing to be completed?
Canary Wharf station was started before anything else, sometime in 2009 I think. The reason is probably to do with opening the shopping levels above the station as soon as possible, even though the station itself won't open until later. Remember also that Crossrail completion was deferred by a couple of years in 2010 in order to reduce construction costs.
But it is nearly finished. Station clutter is pretty much all that is left, along with trackwork. Most of the work now is on the upper levels for the shopping/restaurants and rooftop garden
We need private sector companies like this and the documentary has shown the value they bring to the project.
Thoroughly enjoying the documentary - the last 2 episodes with their emphasis on engineering I thought was better than the first one.
What is interesting the degree of cooperation between the public body Crossrail and the dozens of private sector suppliers who provide the tunnelling equipment, cranes, building materials etc.
This the face of modern day business. Yet there are some who would label these private companies are money grabbing, profit orientated scum and would prevent them having anything to do with running train services. We need private sector companies like this and the documentary has shown the value they bring to the project.
Indeed, and the success of Crossrail Ltd provides a good template for future large-scale infrastructure projects (read: HS2). If the public sector has the revenue risk then you have to ensure that the smartest minds are there as the private sector will do everything they can to increase profits (oddly enough). If the smartest minds on the project are in the private firms then you get the Edinburgh Trams fiasco.
Yes they seem to have done most things right. Although you will probably find that even in the offices of Crossrail Ltd the employees are outnumbered by consultants. HS2 does also seem to be following the Crossrail model.
Who is Crossrail aimed at anyway? Is it in competition with FGW?
In effect, it is what has been needed and planned since the UK saw the success of the Paris RERs, i.e. routing high density routes through the centre to get double ended traffic flows.
All three episode have been good. I agree the latter two have been better balanced in terms of people stories. The stories they have had have been interesting - the guy who had been tunnelling for 50 years, the ones doing their first job etc. - the passion they all show is part of the interest. I also thought the history/looking back at the building of the tunnel near excel was fascinating too.
Yes that was very interesting about the Excel/Connaught Tunnel. I have enjoyed the series, I wonder if they will do a follow up.
They say this was the biggest construction project for a long time, was it more complicated in some ways than the building of the Channel Tunnel?
I seem to recall when crossrail was first planned in the 1980s it was to have been a much larger project, as well as going west to Reading (Rather than Maidenhead), it was also going up the Chiltern route towards Aylesbury and I think further east in Essex and south in Kent. Abbey Wood seems an odd place to terminate. I should have thought that Dartford, Ashford or Ebbsfleet/Northfleet or the Medway towns would have been a good destination with more interchange facilities. At least it is now going to Reading which makes more sense.
The building of the new Canary Wharf station is amazing, although I am surprised they didn't go into any detail as to why it's pretty much completed with 4 years spare when other stations are just getting underway.
Canary Wharf station was started before anything else, sometime in 2009 I think. The reason is probably to do with opening the shopping levels above the station as soon as possible, even though the station itself won't open until later. Remember also that Crossrail completion was deferred by a couple of years in 2010 in order to reduce construction costs.
6123. MR LEWIS: Mr Anderson, could you describe now to the Committee your concerns over sterilisation of this site?
(Mr Anderson) This is because the North Quay site is needed by Crossrail as a construction site in connection with the construction of the station. We have no argument with that and if, as we all hope, we end up building the station, then we will use it too. What we cannot accept, however, is the site being sterilised if, for some reason, the Promoter decides not to implement Crossrail or delays it, whether or not the station is to be built by us. If all went according to plan, the Bill received Royal Assent in the summer, we sign an agreement to build the station and we were given the go-ahead to start working, then the only thing that would hold us up would be waiting for the DLR to vacate the site. We would get on site as quickly as possible, build the station, and get off it again so we could implement our planning permission and develop North Quay.
As mentioned elsewhere, Crossrail will now extend to Reading. I think the reason for not doing this from scratch was so that Crossrail didn't have to pick up the cost and complication of remodelling the station.
Absolutely - Reading now has 15 platforms whereas before it had just 9. The station will also be handling the new Reading to Heathrow rail link. Which begs the question how much capacity do the slow lines have or will rail link be using fast lines along with HST/IEP?
Final question. The GWML is notorious for delays whether lightning strikes, points/signal failures, broken down trains or people under trains. How will Crossrail function if trains have stopped or delayed because of signalling problems at say Maidenhead or Ealing Broadway ?
The show seemed to suggest the new Crossrail station connects Moorgate and Liverpool Street stations?
At the beginning the narrator says Crossrail connects Heathrow Airport but it does not directly?
Absolutely - Reading now has 15 platforms whereas before it had just 9.
The show seemed to suggest the new Crossrail station connects Moorgate and Liverpool Street stations?