thenorthern
Established Member
- Joined
- 27 May 2013
- Messages
- 4,714
Whenever I pass through Nuneaton I find it strange that there are still 5 WCML platforms in use considering for most the day the only trains that stop there are the London-Crewe semi-fast trains as well as the Coventry to Nuneaton shuttle on Platform 1. In my view platforms 4 and 5 could be removed at Nuneaton and the station would still work fine.
At the same time whenever I am at Stoke-on-Trent I notice that with the amount of trains using platforms 1 and 2 with varying speeds is probably too much for the station to cope with especially when one train is late it has a knock on effect.
It made me think are there any other stations with too many or not enough platforms for their current capacity?
I reckon there are more with not enough capacity rather than too much.
At the same time whenever I am at Stoke-on-Trent I notice that with the amount of trains using platforms 1 and 2 with varying speeds is probably too much for the station to cope with especially when one train is late it has a knock on effect.
It made me think are there any other stations with too many or not enough platforms for their current capacity?
I reckon there are more with not enough capacity rather than too much.