Morecambe has to have two, as there is no way (beyond Bare Lane) for a Heysham service to use the northernmost platform , and the run-round loop would still be required anyway for the Heysham flask services. Check your Quail!
So just keep the one that has the loop ie the southern one. That is what was meant
My guess: because Europe is bigger than the UK so they have more room.I have never been sure where to ask this question but this thread seems kind of appropriate: why do continental stations have so many more platforms and other infrastructure?
Also, they didn't suffer a 'Beeching axe' and so didn't lose as many lines, platforms and stations as we did.It actually varies enormously across Europe and I suspect depends on varied national policies, when the last major rebuild took place, and in some cases the massive changes in traffic flows over the last century.My guess: because Europe is bigger than the UK so they have more room.Also, they didn't suffer a 'Beeching axe' and so didn't lose as many lines, platforms and stations as we did.
never mind platforms, the Great Eastern could do with being six-track to Shenfield (maybe even Chelmsford!) with two for Metro/Crossrail, two for Suburban and two for Express, four track to Ipswich.
I look forward to receiving your quotation for the above work
.
Not much you can do to change it, but I always thought Bath Spa struggles with only 2 platforms given the departure times. If the Cardiff-Portsmouth service is a few minutes late (as it often is) it will frequently knock on delays to the following London HST...and this is before peak time traffic can add another service into that short period of time!
No idea what they'd do with 4 platforms during the 15 minute gaps in service though...
I don't think that's really a factor as far as the number of platforms are concerned - after all, if they're stopping, their maximum speed is irrelevant, and if they're passing, it makes relatively little difference whether they do so at 25mph or 125mph! Speed differentials become more significant over longer portions of plain line, where an express passenger might catch a class 6 freight, for example.The biggest problem is not the amount of trains using a station but the variables of the speed of the trains.
I don't think that's really a factor as far as the number of platforms are concerned - after all, if they're stopping, their maximum speed is irrelevant, and if they're passing, it makes relatively little difference whether they do so at 25mph or 125mph! Speed differentials become more significant over longer portions of plain line, where an express passenger might catch a class 6 freight, for example.
Pondering this today, I'd say Exeter Central could do with the other side of P3 being opened up, as it could be used for the shorter SWML services, rather than than them clogging P1 at EXD, which could possibly help speed up Metro services (Back of fag packet idea this, admittedly) P1 could be used for Exmouth stoppers possibly.
Are you effectively suggesting that SWT only run their Waterloo trains as far as Central? While a fair proportion of passengers on those trains use central, I think terminating them there solves a problem at St Davids which doesn't actually exist...
Although you say 'clogging up' platform 1 at St Davids, they merely go in after the :18 Exmouth has left. To be honest, it all works quite well and efficiently to be honest!
I have never been sure where to ask this question but this thread seems kind of appropriate: why do continental stations have so many more platforms and other infrastructure? For example, I recently caught a train at Bari Centrale in southern Italy which has 9 through platforms and 6 terminal platforms to cope with ~14 departures per hour, a similar traffic density to Wolverhampton.
So just keep the one that has the loop ie the southern one. That is what was meant
realistically Piccadilly's 13 and 14 should be like Oxford Road with 4 through platforms and a bay platform for terminating trains from the east.
Havant could probably do with more than two through platforms for the amount of services that go through. It's commonplace for either SWT or Southern trains to have to wait outside Havant for a platform when coming in from the London direction. Also making Platform 2 at Fareham a through platform would allow "looping" of slow trains to allow late running fasts overtake.