Melancholia
Member
Paddington has lost P13 over Christmas to make way for the extension of P12 to accomodate longer trains.
There might be a problem if a station were to be expanded by more than one platform. Fortunately for Waterloo when the Euro platforms were built, they were on the side of the station with the higher platform number; had Waterloo been numbered the other way around, that is, starting with no 1 on the Windsor lines, the platforms would surely have had to be renumbered when the new ones came into operation.
The difficulty with Cardiff Central are the tiled platform numbers in the station subway, and the station being listed.
I imagine in that scenario it could have been one place where having different 'public' numbers to what is on the signalling diagrams would make sense. In practice the International platforms were essentially treated as a different station to domestic Waterloo, so the numbering needn't be sequential. Using letters for the international platforms would be a non-starter though, as that's already done at Waterloo East.
In the 1950s London Bridge did not have a platform 5. The high level through platforms were 1, 2, 3, 4, 6 and 7. 1/2, 3/4, and 6/7 were all island platforms. Between the tracks that served platforms 4 and 6 there was a through track, not used at that time. Presumably that through track had been regarded as "platform 5".
Wasn't there a missing platform at London Bridge before the current rebuild started?
For some reason I'm thinking it was platform 7
I thought Temple Meads had a platform 2 but its at the southern end of the station?
I knew about the missing platform 14 as I spent 20 minutes walking round looking at the layout and was wondering where the hell platform 14 was.
Sunderland doesn't have a platform 1
Just after they discovered that the underlying pier structure couldn't take the weight. 1980s sometime - I cant really remember seeing all 5 platforms in use. Perhaps usage was infrequent before they actually got round to lifting the track.
Plymouth hasn't got a platform 1 or 2 from what I can remember
Just after they discovered that the underlying pier structure couldn't take the weight. 1980s sometime - I cant really remember seeing all 5 platforms in use. Perhaps usage was infrequent before they actually got round to lifting the track.
I didn't think that 7 was ever used in the first place.
Isn't it that little south facing bay on the town side of the station? Not in public use now though.
I always believed it was where the car park now is on the opposite side of the station building, to the north east side of platform 1.
They did it for Reading? Was there so much new signalling, it was wroth while?It's updating signalling equipment that's the big hidden cost. The theatre indicators would all need re-configuring for a start, but lots of stuff in the control room too.
They did it for Reading? Was there so much new signalling, it was wroth while?
Sent from my SM-T810 using Tapatalk
It can obviously be done if stations are completely re-built and re-signalled as was Reading. Indeed, the scale of the changes would have prevented the platforms from not being re-numbered.