Does look like TfW, GWR and SWR have sorted the spares issues on the 230 and 484s.With the amount of work that's gone into the 230's. What is their expected lifespan?
Could be an interesting read.So much I want to say on this thread, so many misunderstandings, so much speculation, so little time to address it all! One day a book will be written about the truth behind what went on with Vivarail.....
One day a book will be written about the truth behind what went on with Vivarail.....
Definitely will be an interesting read…Could be an interesting read.
Assuming the 230 upgrades work, and they start to run a full day and all 5 are available, then couldn't they just replace the 197s in the current timetable?Here we are at another timetable change, not a major one i know but again it looks like only one 230 out so the fleet is still only going to cover half a diagram per day probably until at least December again. What an absolute waste of money. And the 197s still being kept off the mainline which is struggling with shortages of trains.
How long have TfW now had these units as a stop-gap and when was it proposed the next "proper" rail units would be delivered?Assuming the 230 upgrades work, and they start to run a full day and all 5 are available, then couldn't they just replace the 197s in the current timetable?
They weren’t a stop gap.How long have TfW now had these units as a stop-gap and when was it proposed the next "proper" rail units would be delivered?
Yes they would, but it seems that’s still quite a way off.Assuming the 230 upgrades work, and they start to run a full day and all 5 are available, then couldn't they just replace the 197s in the current timetable?
I dont know that there are any public plans for replacement so quite some time away.How long have TfW now had these units as a stop-gap and when was it proposed the next "proper" rail units would be delivered?
So if they now have 3 working trains and started the updates for the other 2 in April,Yes they would, but it seems that’s still quite a way off.
I dont know that there are any public plans for replacement so quite some time away.
I have no idea what that says as it’s behind a pay wall.So if they now have 3 working trains and started the updates for the other 2 in April,
which should have been tested and in operation by now.
What's the current situation?
Thanks, it was saying TfW were debating about if 2 or 3 would be modified and in April agreed on 2, so another will be modified with 006?I have no idea what that says as it’s behind a pay wall.
My understanding is that 007,008,009 and 010 are all unmodified.
A quick flit through RTT and it seems 008,009 and 010 are out routinely but not sure about 007.
006 is the first one to bed and has been modified and has been seen out at least once on a test run back on the 26th of august as said in post #660.
As that seems to be its first and only test run, I would still think there is some way to go.
Is that 2 or 3 initially or total ?Thanks, it was saying TfW were debating about if 2 or 3 would be modified and in April agreed on 2, so another will be modified with 006?
The article says that they decided to apply the modifications to 2 units to prove the modifications, with the third being added once the costs and benefits were clear. It is intended that all 5 will eventually be modified.Is that 2 or 3 initially or total ?
Perhaps that’s where 007 is.
I would have thought that If successful all 5 would get the modifications.
Just imagine if the TfW Class 230 saga (aka "The Neverending Story") were to be made the standard TfW future fleet procurement specification.The article says that they decided to apply the modifications to 2 units to prove the modifications, with the third being added once the costs and benefits were clear. It is intended that all 5 will eventually be modified.
The modifications involve the engine management software, battery efficiency and cooling, and prevention of radiator blockages. They are also looking to increase strategic spares holding.
Ahh good to know!The article says that they decided to apply the modifications to 2 units to prove the modifications, with the third being added once the costs and benefits were clear. It is intended that all 5 will eventually be modified.
The modifications involve the engine management software, battery efficiency and cooling, and prevention of radiator blockages. They are also looking to increase strategic spares holding.
That’s interesting that the batteries can’t provide suitable acceleration.From what i know about travelling on them and from what the crews say the engines constantly run and they also help power the train along with the batteries, the geofence thing happens at a couple of places where the engines are still running but don’t give power it’s battery only and you can feel when the full power with the engines kicks in again. If the engines were switched off and the train ran on battery only they would never keep on time and will soon run out of power. But they only do a couple of trips a day anyway, i don’t think they will ever run a full day and full timetable with just the 230s.
So much I want to say on this thread, so many misunderstandings, so much speculation, so little time to address it all! One day a book will be written about the truth behind what went on with Vivarail.....
From what i know about travelling on them and from what the crews say the engines constantly run and they also help power the train along with the batteries, the geofence thing happens at a couple of places where the engines are still running but don’t give power it’s battery only and you can feel when the full power with the engines kicks in again. If the engines were switched off and the train ran on battery only they would never keep on time and will soon run out of power. But they only do a couple of trips a day anyway, i don’t think they will ever run a full day and full timetable with just the 230s.
And - I can believe this would imply more fuel usage if the batteries were not sufficient to accelerate the train as originally planned.You have the advantage over me as I have not even seen one let alone ridden on one, but what you say is different to how they were initially conceived. AIUI the three car units were designed with traction motored bogies on the two end cars and two engine pods in each end car. The engine pods were to solely provide power to charge the batteries which were located under the centre car, and it was the batteries that supply 100% of traction motor energy as well as the auxilliaries for lighting, heating, doors etc. Obviously braking and retardation of units was to provide regen braking to top the batteries up.
AIUI the 230s were only going to be powered by onboard generation via batteries so based on Ken's experience, has the traction circuitry been modified so that the onboard engines now provide traction power straight to the traction motors ?
Sound like a big change to me.
I suepct it was due to how the charge/discharge system was concieved on paper versus the practical realities of working with lithium-basecd cells that led to the change.You have the advantage over me as I have not even seen one let alone ridden on one, but what you say is different to how they were initially conceived. AIUI the three car units were designed with traction motored bogies on the two end cars and two engine pods in each end car. The engine pods were to solely provide power to charge the batteries which were located under the centre car, and it was the batteries that supply 100% of traction motor energy as well as the auxilliaries for lighting, heating, doors etc. Obviously braking and retardation of units was to provide regen braking to top the batteries up.
AIUI the 230s were only going to be powered by onboard generation via batteries so based on Ken's experience, has the traction circuitry been modified so that the onboard engines now provide traction power straight to the traction motors ?
Sound like a big change to me.
interesting stuff! it certainly would make sense to not let unused capability go to waste.I suepct it was due to how the charge/discharge system was concieved on paper versus the practical realities of working with lithium-basecd cells that led to the change.
Lithium batteries can only be charged (or discharged) at a specific rate based on the cell chemistry and construction method (known as the 'C' rating), and that rate is also dependent on the charge state and cell temperature to avoid going into thermal runaway. The gensets are probably capable of producing more current than can be used to safely charge the batteries (especially once they have heated up), which can be directly sunk by the traction circuitry to augment the current the batteries are capable of discharing. if acceleration demand is there. The 'safe' discharge rate threshold in the BMS (which will be determined by the battery C-rating, charge state and temperature) will determine the accleration profile when running battery-only and the gensets are idling due to geofencing.
So it does! Good to see it’s coming along.Seems that 006 is out on test again today.
No idea unfortunately. I was wondering the same though .Only 3 minutes lats passing Shotton Paper Company, but shortly afterwards, 14 minutes late at Dee Marsh Junction....what happened?
Ahh ok that’s interesting!What really annoys me about geo-fencing is that it was designed to keep noise pollution down in built up areas. Then they whacked an air raid siren on the doors when they close! Driving them I can tell you there’s not much difference in speed if the engines are off, except leaving shotton heading towards Wrexham. A 197 gets to 40mph quicker up the bank. But otherwise there’s very little in it. Last year we were asked to turn then engines off between certain stations to remove leaves from the radiators and there was no lost time at all. Obviously this assumes there’s no other issues with the unit.