So I can give some context for you.Yes I think the plan changed while it was in the platform and I had already disappeared. The staff member who turfed me off definitely thought the return working to Bidston was cancelled, as I asked; and there was also a class 5 empty working to Bidston in RTT when I abandoned.
Now on board the next northbound, a 197.
What price a coupling adapter to permit emergency tow-away by a 197?So I can give some context for you.
230009 was reported to have failed on Birkenhead depot and meant that 230008 was the only working 230.
This means that if it was to fail in service there is absolutely no way to rescue it. So TFW control will not risk allowing it into passenger service.
Shortly after it was planned to run it back to depot empty 230007 had been made available as a rescue unit and hence why they could reinstate 230008 into passenger service.
No idea.What price a coupling adapter to permit emergency tow-away by a 197?
Doesn't say much for "innovative" British trains in the 21st century.So I can give some context for you.
230009 was reported to have failed on Birkenhead depot and meant that 230008 was the only working 230.
This means that if it was to fail in service there is absolutely no way to rescue it. So TFW control will not risk allowing it into passenger service.
Shortly after it was planned to run it back to depot empty 230007 had been made available as a rescue unit and hence why they could reinstate 230008 into passenger service.
Yep! Gone are the days of one coupler type being made for all.So much for group standards!
Who was it who refused the said allowance and the reason why?Whilst 196’s and 197’s can couple mechanically they can’t electrically. There is a special mode on the TCMS to allow it but i was told it’s not allowed to be used.
Thanks for the context. Makes some kind of sense of it all. But to echo the other comments, "my standard's better than your standard"!So I can give some context for you.
230009 was reported to have failed on Birkenhead depot and meant that 230008 was the only working 230.
This means that if it was to fail in service there is absolutely no way to rescue it. So TFW control will not risk allowing it into passenger service.
Shortly after it was planned to run it back to depot empty 230007 had been made available as a rescue unit and hence why they could reinstate 230008 into passenger service.
I'm predicting words to the effect that they're still swapping units halfway through the day to manage their performance and if this is what is required to keep them going then they're still awful. Ready, steady.....No comments on the 230s since May.....does this mean they are now working as required?
I've been critical in the past, but if these are working to spec, this should be a recognised achievement for tfw
Unit swap is still happening, todays was 15 minutes late (And has since recovered all lost time)p.s. I don't know for sure whether a unit swap is still happening half way through the day
So in actual fact the 230s have failed.....they're being swapped out after half a day and the 197s taking the bulk of the work? Or is there more to it?The way I see it if there are 2x 197's and only 1 230 running on the line then the reliability still isnt sorted out!
If the specification was for each set to work a maximum of half of a dece!erated diagram, requiring a second to replace it for the remaining half; and one set in particular to rust away peacefully without use in service, then yes - they've been a roaring success. Anyone got a copy of the original spec that they'd like to share?No comments on the 230s since May.....does this mean they are now working as required?
I've been critical in the past, but if these are working to spec, this should be a recognised achievement for tfw
I'm not actually a tfw manager, but I can definitely confirm that wasn't what the contract saidIf the specification was for each set to work a maximum of half of a dece!erated diagram, requiring a second to replace it for the remaining half; and one set in particular to rust away peacefully without use in service, then yes - they've been a roaring success. Anyone got a copy of the original spec that they'd like to share?
Like setting them up as a new ride attraction on Blackpool Pleasure BeachAt the moment, if they can manage two diagrams with 197s, then what harm is another one? If the 230s just aren’t working, then perhaps try them elsewhere (as I proposed above).
Quick question… would the 230s be more reliable on services that aren’t stopping and starting, like the Bidston to Wrexham trains? Perhaps using them between Crewe and Chester where it’s a very simple non stop run would prevent issues from happening (so often)?
Their top speed is 60 or 70....I'm sure someone will clarify.Quick question… would the 230s be more reliable on services that aren’t stopping and starting, like the Bidston to Wrexham trains? Perhaps using them between Crewe and Chester where it’s a very simple non stop run would prevent issues from happening (so often)?
The way I see it, it isn’t that the ‘230s are an abysmal failure’ as such, don’t get me wrong they are extremely poor in reliability, but the GWR ones are showing a much better success rate with their battery charging idea on 230001. Perhaps this is something that TfW should consider IF they are wanting to keep the 230s.
At the moment, if they can manage two diagrams with 197s, then what harm is another one? If the 230s just aren’t working, then perhaps try them elsewhere (as I proposed above).
The original short term plan was for them to work the Conwy valley, Crewe shuttle and Bidston line with 4 of 5 in service daily before all moving to the Bidston line permanently for the proposed half hourly service.Quick question… would the 230s be more reliable on services that aren’t stopping and starting, like the Bidston to Wrexham trains? Perhaps using them between Crewe and Chester where it’s a very simple non stop run would prevent issues from happening (so often)?
The way I see it, it isn’t that the ‘230s are an abysmal failure’ as such, don’t get me wrong they are extremely poor in reliability, but the GWR ones are showing a much better success rate with their battery charging idea on 230001. Perhaps this is something that TfW should consider IF they are wanting to keep the 230s.
At the moment, if they can manage two diagrams with 197s, then what harm is another one? If the 230s just aren’t working, then perhaps try them elsewhere (as I proposed above).
Quick question… would the 230s be more reliable on services that aren’t stopping and starting, like the Bidston to Wrexham trains? Perhaps using them between Crewe and Chester where it’s a very simple non stop run would prevent issues from happening (so often)?
Their top speed is 60 or 70....I'm sure someone will clarify.
The line to crewe is a 90mph line, although they could run on it, its not exactly progress
The original plan was indeed for 230s to temporarily go on Crewe - Chester shuttles, and as I said at the time it was hard to think of a worse train for that service. A unit with a 60mph limit on a 90mph line isn't ideal, but you've also got a seating and door layout that isn't really what you'd want for that service.The original short term plan was for them to work the Conwy valley, Crewe shuttle and Bidston line with 4 of 5 in service daily before all moving to the Bidston line permanently for the proposed half hourly service.
I’m not sure if it was delivery delays, pandemic, reliability or all the above that meant the original plans never came to happen.
Yawn.I think my idea is best - tow them to Mr. Simm at Newport scrap prices are good at the moment - don't waste any more time and money on them.
Sounds like that was the right call then.I think the real deal breakers in the end though were Avanti's (fairly justified as things turned out) fears about the difficulties of rescue if a unit failed, and also the logistics of operating the route itself - 5 different driver and 6 different guard depots work the shuttle at different times during the day. It's either a lot of training, or a lot of diagram unpicking, to fix that issue.