Thanks for reply!! Going to the 769 storage house then!!
Indeed, though the similar discussion on the thread about GWR 769s concluded that there was no suitable re-use available for this particular equipment. GWR's have had even less use than TfW's of courseEven for an industry as profligate as the railway, you'd want to think that almost brand new generating units should be removed before the bodyshells go through the shredder.
Off to Long Marston this week.Thanks for reply!! Going to the 769 storage house then!!
Just 769007 or are all of them going this week?Off to Long Marston this week.
I expect so. The 769/0 are going first. The three 769/4 will be the last in service.Will all the TFW 769s go to Long Marston?
Where was it?Well I saw something a little unexpected out of a train window today.
View attachment 130125
When I first saw it in the distance I was a bit confused because I was fairly sure there isn't normally a railway line down there.
I've only seen pictures of this sort of thing before.
It's the A48 Western Avenue at the junction with Waungron Road. Waungron Park station is slightly to the left of the photo.Well I saw something a little unexpected out of a train window today.
View attachment 130125
When I first saw it in the distance I was a bit confused because I was fairly sure there isn't normally a railway line down there.
I've only seen pictures of this sort of thing before.
Is this part of 769007, or has another unit moved by road?Well I saw something a little unexpected out of a train window today.
View attachment 130125
When I first saw it in the distance I was a bit confused because I was fairly sure there isn't normally a railway line down there.
I've only seen pictures of this sort of thing before.
Is this part of 769007, or has another unit moved by road?
Only 769007 has moved. The next TFW one is not due to move until the end of March.Is this part of 769007, or has another unit moved by road?
How many 231s will need to be in service before all the 769s can be withdrawn?
They have 11 in total yes so im guessing 9 diagrams on Rhymney/Bargoed to Penarth and 2 spare?Do they have eleven 231s ? a couple in daily traffic so another six could cover the current six 769 diagrams fairly easily I imagine.
That depends what condition its running gear is in. If it's not fit to run - for instance, if parts have been removed to keep other sets in traffic - then it could be cheaper and/or quicker to move it by road than to carry out the work and possibly have to hire in a loco to tow it as well.Moving 007 by 4 separate lorry loads rather than towing it must cost a fortune too. Must have money to burn.
Also don't forget that nearly all the TfW 769s arrived by road and were only tripped across the brickyard after shunting together, by a light loco from Leicester.That depends what condition its running gear is in. If it's not fit to run - for instance, if parts have been removed to keep other sets in traffic - then it could be cheaper and/or quicker to move it by road than to carry out the work and possibly have to hire in a loco to tow it as well.
That would be a good reason for the road move then!The 769's don't have route clearance back to Long Marston.
769007 - It moved in two parts, with both Alleleys trucks doing the 2 moves over 2 days.Is this part of 769007, or has another unit moved by road?
If withdrawn before that date, will they be stored at Camon till then, or some other location?Only 769007 has moved. The next TFW one is not due to move until the end of March.
Yes, Its working between Rhymney and Bargoed today until 19:30Would like to see 768008 before it goes. Does anyone know if it is regular service?
Thanks to all who confirmed this769007 - It moved in two parts, with both Alleleys trucks doing the 2 moves over 2 days.
Yeah, withdrawn yesterday......and didn't make its full diagram.I hear 003 has been withdrawn. Does anyone know of the plan for the rest?
Yeah, withdrawn yesterday......and didn't make its full diagram.
The 769/0s are going first with the 769/4s finishing last and all are heading to Long Marston for storage