Hi all,
I have tried to understand some of the more detailed postings above but I think I am a bit thick. I am presuming that there are lots of options in terms of what is offer in terms of digital signalling Therefore, some simple questions if I may, to try and ascertain whether Grayling's announcement is most likely a distraction technique or most likely the right thing to look at to increase capacity and resilience on the trans-pennine at the best cost:
1. To increase capacity, does both the track ALL the trains passing through that section need to be fitted with a particular system? Is that system largely the same as has been installed on the Thameslink core?
2. If the answer above is yes, is it realistically achievable to retrofit all the types of trains likely to be using this line over the next say 15 years with that technology? The reason I say 15 years is to acknowledge this is a reasonable period to presume legacy stock moving over this line.
3. If you can retrofit all the trains with the relevant system, is that problem solved or do different train lengths etc also present challenges? I am thinking particularly of the variable freight traffic over this line.
4. If you can move everything you need to to the new system, what sort of percentage increase in capacity might this provide on a route with very mixed traffic, bearing in mind the very large amount of junctions and interactions with other routes on this line (in contrast to the Thameslink core which has limited junctions and interactions).
Whilst I would be happy to see the Transpennine line become an early adopter of an effective digital system, I am concerned, as you always have to be with Grayling, that an expert in digital signalling might tell you in 2 minutes what the £5million will take too long to find out... that of all the lines to look at to see if digital technology can improve in terms of capacity and resilience (and maybe speed), the TP is one of the worst in the county. If that is the case, I would much rather that was acknowledged now and so the need for new "hardware" such as passing loops, freight lines etc - is the focus of attention.