Hi.
I was wondering what procedure/policy etc is on having trains blocking level crossings? This afternoon I was at my local station (with my 2yr old son watching the trains go past, which is something he loves doing and so daddy "has" to take him when "he" asks to go
) when there was signal problems in the local area. After around 20mins, a scheduled freight train come slowly through as a red signal could be seen further down the line and as the train came to halt the last 6 wagons were still covering the level crossing. As the signalling problems were still in place, this train was covering the very busy level crossing for around 10/15mins! This created huge tailbacks on the road which was compounded by the gates coming down pretty much soon as they went up due to the backlog of train funnelling through. To my very untrained eye, this appeared to be a risky move to let the freight train come and cover the level crossing in the middle of signalling problems as this train could have been held for a very long time. Anyway, to a car driver this is very frustrating. What got me wondering was why this long freight train had not been held at the previous signal where it would not have created any problems? Can anyone shed some light on what should/shouldn't happen in these sort of instances? Many thanks!
I was wondering what procedure/policy etc is on having trains blocking level crossings? This afternoon I was at my local station (with my 2yr old son watching the trains go past, which is something he loves doing and so daddy "has" to take him when "he" asks to go
) when there was signal problems in the local area. After around 20mins, a scheduled freight train come slowly through as a red signal could be seen further down the line and as the train came to halt the last 6 wagons were still covering the level crossing. As the signalling problems were still in place, this train was covering the very busy level crossing for around 10/15mins! This created huge tailbacks on the road which was compounded by the gates coming down pretty much soon as they went up due to the backlog of train funnelling through. To my very untrained eye, this appeared to be a risky move to let the freight train come and cover the level crossing in the middle of signalling problems as this train could have been held for a very long time. Anyway, to a car driver this is very frustrating. What got me wondering was why this long freight train had not been held at the previous signal where it would not have created any problems? Can anyone shed some light on what should/shouldn't happen in these sort of instances? Many thanks!