plymothian
Member
We use 6 a lot. Examples are St James Park on the Down Waterloo. At Dawlish Warren if we give 6 and draw up to the signals (both well clear of the platforms) then we've departed the station right time and the delay is put down as signals. If we wait at the platform for the signal to clear we get the delay. Same at Worle in both directions.
Giving 6 came about our way as a driver was given 2 at SJP at had a SPAD. It was felt that giving 6 would draw attention to the red signal.
If 6 was given as part of a shunt move then the movement would have already been agreed with all concerned.
I much prefer to wait time at a platform then a few yards beyond it. If something goes wrong such as somebody being taken ill on the train or a problem further down the line resulting in a significant delay, you are much better off being at a station platform with easy egress than locked on a train remote from one. If the driver subsequently has a SPAD, that is not the fault of the guard. A train moving towards a red signal has the same risk irrespective of whether '2 bells' or '6 bells' has been given. Worrying about any delay minutes being attributed incorrectly is a common and often repeated myth. If the signal is at red you are not going anywhere whether you are stopped at the signal or in the platform before it. Somewhere like Worle where even the longest trains are easily clear of the platforms the driver should not be receiving '6 bells' on the buzzer. There is no consistency from guards when applying this train of thought. The signals are some distance away from the platforms. Then take stations like Bath Spa and Keynsham in the up direction. The next stop signals after both of the respective up platforms are significantly closer than those beyond the platforms at Worle, but because they are not visible during despatch, no guard ever gives '6 bells' at either of these locations. Surely the risk of the driver having a SPAD is greater at a platform where the next signal isn't visible compared to one where it is?
In agreement. Always better to wait at a platform than outside as it's easier to control passengers at a station (especially when it's so hot), and if things do go belly up there's no need to think about wrong move procedures. Stuff delay attribution (and I do truely believe the 'you get the attribution' is a load of bunkum).
St James Park down, Dawlish Warren, Credition up - never give 6 - always wait.
Worle both directions aren't starting signals anyway. Worle Junction is approach control too, so you will very very rarely get a proceed aspect to go along the main line whilst stood at Worle.