I believe the bridge over the A483, and the bridge under it further down the line, couldn't be doubled within the funding available. As it's possible to produce a timetable that doesn't need trains to pass each other near these bridges then they will be left as they are. This does of course create some performance risk!
The maps show the track under the A483 bridge at Dodleston is planned to be double track, so there will only be one 2.5 mile single track section Rossett-Gresford.