The second of the two runs has operated currently 72 minute early with set TP02 and 68022
It should have been the first path, rang out on that that then held to a middle time let us go then cancelled the 1st path and put us on the 2nd!!!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MDB1images

Member
Joined
9 Jun 2018
Messages
682
To change ends the drivers don't have to walk all the way outside do they? Isn't the outside walk just the length of the loco, then into the carriage at the loco end and walk through to the trailer cab?

The driver could walk through the train from DT towards rear of train and alght at the Guard area to go trackside which would reduce trackside walking.
Would then walk length of loco and enter cab, don't know the current method of work at Middlesbrough but would need tweaking for loco hauled(maybe a small lit cess side pathway).
 

BMIFlyer

Member
Joined
13 Mar 2017
Messages
723
it may not be possible to relock them from track level as the guards panel will be open.

You can close the guards office exterior door from the track level. There is a switch similar to that found on the current TPE fleets.

Or alternatively ask the guard to close it from inside.
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,205
it simply isnt that straightforward. TPE do not seem to have assured themselves that the supplier was supplying the right product to the right spec. You seem to think that they shouldn't be doing this. I suggest this is wrong.

Suggestions aren't cold hard facts.

CAF have delivered a product not fit for service, how is that the fault of TPE? It simply isn't.
CAF will undoubtedly fix the issue in time, but from what I was told (most likely third/fourth hand), this being 2 weeks back too where these issues started to crop up, they're not the best company to work with.

Who loses out? The passenger, oh that's me.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,892
Location
Fenny Stratford
Suggestions aren't cold hard facts.

CAF have delivered a product not fit for service, how is that the fault of TPE? It simply isn't.
CAF will undoubtedly fix the issue in time, but from what I was told (most likely third/fourth hand), this being 2 weeks back too where these issues started to crop up, they're not the best company to work with.

Who loses out? The passenger, oh that's me.

OK then - you are wrong. Cold enough?

You don't seem able to grasp the concepts of quality assurance and quality control. As the customer in these circumstances you do not sit back and wait for the product. This isn't the same as your window analogy. This is a multi million pound investment in new equipment and you seem to think you just fire and forget and then wonder why things go wrong. That is simply preposterous.

As a customer in these situations YOU go out to the manufacturer and asses and audit their processes, procedures and techniques and ensure they meet your standards before you start. You make sure they absolutely understand your specification, the delivery parameters and the acceptance criteria at the start. You then check the build at various stages of the project. You have agents or your own people on site to monitor the build and deal with any change issues that crop up to keep the production line moving and communication flowing. This helps avoid any uncontrolled change to specification or materials used in construction and tries to ensure you get a quality product first time. This is all fairly obvious project management stuff.

If you take your approach you lose the chance to head these issues of early, before they become a delay to delivery.

I do have some experience in exactly this type of thing!
 

BeHereNow

Guest
Joined
30 Dec 2017
Messages
308
The issue is not that there are technical difficulties, as there are with any new build. It's that the quick delivery was a key part of a winning franchise bid, and they were promised for December 2017.
 

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,741
A NOVA 3 looks like it's due to head down to Crewe South Yard today under one of two paths
ACTIVATED: http://www.realtimetrains.co.uk/train/O56873/2018/11/14/advanced
NOT YET ACTIVE: http://www.realtimetrains.co.uk/train/K97154/2018/11/14/advanced

This maybe freeing up room ahead of a delivery tomorrow from Portbury
http://www.realtimetrains.co.uk/train/K96124/2018/11/15/advanced

The Portbury to Manchester, Didcot West Curve.

Attention was required to the wrapping.
DSC01580.JPG DSC01581.JPG DSC01582.JPG DSC01583.JPG DSC01584.JPG DSC01585.JPG DSC01586.JPG DSC01587.JPG DSC01588.JPG
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,752
Except that they are not "trains," just locos, so a lot less to go wrong.
OK then if you are going to play that game, Class 66 and the new wagons EWS bought from Thrall, or the various coal hoppers, flats, box wagons etc Freightliner, GBRf et al bought. Those are “trains”.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
The amount of plastic wrapping on that is just ridiculous. We're going through an environmental crisis and plastic pollution plays a big part in that - so why on earth are trains of all things needlessly being wrapped in plastic, just for the plastic to be disposed of once the train reaches Manchester?
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,292
Location
South West London
The amount of plastic wrapping on that is just ridiculous. We're going through an environmental crisis and plastic pollution plays a big part in that - so why on earth are trains of all things needlessly being wrapped in plastic, just for the plastic to be disposed of once the train reaches Manchester?

And let's be honest, they'll put it through the wash before it's first journey
 

EE Andy b1

Established Member
Joined
12 Dec 2013
Messages
1,212
Location
CLC
OK then if you are going to play that game, Class 66 and the new wagons EWS bought from Thrall, or the various coal hoppers, flats, box wagons etc Freightliner, GBRf et al bought. Those are “trains”.

Who cares?

The point is passengers will not get the train service promised by TPE because they and there train builder CAF were way off the mark on how quickly these Mk5a sets (Nova 3) would be built, tested, trained on and then put into service. So not before May 2019 now.

We also have no idea how reliable they will eventually be on the Trans-Pennine route.

Passengers losing out again!
 

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
Does anyone know many sets have been delivered up to now, please?

I have TP01 to TP05 as delivered so far.
 

EE Andy b1

Established Member
Joined
12 Dec 2013
Messages
1,212
Location
CLC
Were they deck cargo? Could be to keep sea spray off

I can't ever remember seeing rolling stock in the UK being wrapped to the extent that these Mk5a sets have been, and not seen any photo's of these sets before wrapped although i did see one vehicle still wrapped at the Manchester International Depot the other week when four sets were outside on show.

Does anyone know many sets have been delivered up to now, please?

I have TP01 to TP05 as delivered so far.

TP09 ?!
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,829
The amount of plastic wrapping on that is just ridiculous. We're going through an environmental crisis and plastic pollution plays a big part in that - so why on earth are trains of all things needlessly being wrapped in plastic, just for the plastic to be disposed of once the train reaches Manchester?
Plenty of plastic on the railways these days. The loco-hauled Mark 5s will be one of the few things that ain't plastic!
 

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
I can't ever remember seeing rolling stock in the UK being wrapped to the extent that these Mk5a sets have been, and not seen any photo's of these sets before wrapped although i did see one vehicle still wrapped at the Manchester International Depot the other week when four sets were outside on show.



TP09 ?!

Sets 1-6 and 9 have now been delivered.

Thanks both. :)
 

SP Man

Member
Joined
26 Aug 2018
Messages
146
They are wrapped due to damage on the vinyls happening and they want to both protect it and also to easily see where the scrapes are happening. The issue is what's happened here with a plastic wrap coming lose. Very lucky that the photo of it flapping when going through a station is very worrying. If that was to hit someone or wrap around them at high speed the consequences could be quite fatal!
 