Thanks for the link, l had seen it rumoured on another forum but wasnt sure. It is a bit of a scenic route from Portbury to longsight via Holyhead
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

notlob.divad

Established Member
Joined
19 Jan 2016
Messages
1,609
Why are they taking them so far? They have just finished utilisng the Leyland sidings as a temporary northern base during the Blackpool blockade. Surely utilising this again would be much more sensible than dragging them all the way to Holyhead.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,557
Why are they taking them so far? They have just finished utilisng the Leyland sidings as a temporary northern base during the Blackpool blockade. Surely utilising this again would be much more sensible than dragging them all the way to Holyhead.

13 sets of 5 car trains won't fit at Leyland plus as I recall the agreements on the planning application were that once Northern finished with it the site would be demolished.
 

Kieran1990

Member
Joined
29 Feb 2016
Messages
420
Location
Leeds
With just 13 sets how tightly will they be diagrammed?
Is it 6 sets each to both routes that they are intended for?
 

BMIFlyer

Member
Joined
13 Mar 2017
Messages
723
With just 13 sets how tightly will they be diagrammed?
Is it 6 sets each to both routes that they are intended for?

Scarborough needs 5 sets. There should be one spare set per day as a minimum.

The Mk5A's should start running with 2 diagrams per day initially on LIV-SCA late this year. That would pretty much equal 6 trains in each direction per day similar to the planned Mk3 diagrams.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
On the contrary, are the Mk5s not actually being delivered earlier than anticipated?

The TPE franchise agreement shows the Mk5 lease start date as 2 November 2017.
Class 397s are set as 2 October 2018, and the 802s as 29 August 2019.
TPE appears to have 12 months leeway on these dates for the whole fleet to be in unrestricted service.
You'd have expected every effort would be being made to bring all the new stock into service as soon as possible.
Parking the trains more than 100 miles from the nearest service location suggests problems to me.
Maybe it's CAF who needs the storage space until the Mk5 sets are accepted for use on NR.
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Looks like now in the event with the various delays that these trains are a waste of time and money may as well just kept al the 185 along with the 802's or wait for a bigger fleet of 802's. Always struck me as somewhat nonsensical decision to have 3 types of train where there was previously 1 and the loco hauled being a single point of failure on a very busy line.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Looks like now in the event with the various delays that these trains are a waste of time and money may as well just kept al the 185 along with the 802's or wait for a bigger fleet of 802's. Always struck me as somewhat nonsensical decision to have 3 types of train where there was previously 1 and the loco hauled being a single point of failure on a very busy line.

Somewhere there's a picture of TPE's first 802 on test at Darlington.
So the first new TPE train to turn a wheel in the UK is the bi-mode option!
It naturally has all the advantage of the prior class 800 testing/approvals, while CAF has had to start from scratch on all 3 of its TPE/Northern fleets.
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Somewhere there's a picture of TPE's first 802 on test at Darlington.
So the first new TPE train to turn a wheel in the UK is the bi-mode option!
It naturally has all the advantage of the prior class 800 testing/approvals, while CAF has had to start from scratch on all 3 of its TPE/Northern fleets.

Well yes but the Loco Hauled stock was supposed to be a quick win and get into service quickly, while an 802 might get into service as quick if not quicker at this rate.
 

BMIFlyer

Member
Joined
13 Mar 2017
Messages
723
The Mark 5A’s will be in service by the end of 2018. The problem we have is lack of space at the moment to store any further push pull sets as they are being built very quickly.

Have patience!
 

Kieran1990

Member
Joined
29 Feb 2016
Messages
420
Location
Leeds
Yes the first 802 ran this week, and as other posters have stated, the Class 800s have been testing in the UK for a while.
The first Mk5a is due to run next week in test- so not bad going for CAF
 

keith1879

Member
Joined
1 Jun 2015
Messages
393
Somewhere there's a picture of TPE's first 802 on test at Darlington.
So the first new TPE train to turn a wheel in the UK is the bi-mode option!
It naturally has all the advantage of the prior class 800 testing/approvals, while CAF has had to start from scratch on all 3 of its TPE/Northern fleets.

There are videos (up this thread for example) showing that the Mark 5 stock has been turning plenty of wheels in this country ....the sets have been delivered by rail. All indications seem to be that this will be the first of the new stock to enter service for TP.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
There are videos (up this thread for example) showing that the Mark 5 stock has been turning plenty of wheels in this country ....the sets have been delivered by rail. All indications seem to be that this will be the first of the new stock to enter service for TP.

That's fine for the basic vehicle, but the DT is the critical part of the set, and its interface with the class 68.
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
That's fine for the basic vehicle, but the DT is the critical part of the set, and its interface with the class 68.
That's why they have been running the MK.5 set with Class 68s out at Velim. That should have cleared most teething problems......
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
The Mark 5A’s will be in service by the end of 2018. The problem we have is lack of space at the moment to store any further push pull sets as they are being built very quickly.

Have patience!
They were supposed to be in service from this summer. Instead of telling passengers to have patience perhaps we should be telling you to honour your franchise commitments.
 

EE Andy b1

Established Member
Joined
12 Dec 2013
Messages
1,212
Location
CLC
I once said good on TPE for getting on with the job of getting new trains, utilising Mk3s for training on service trains until Mk5s came into operation.
How wrong i was!
Problems not of all there own making but very slow at getting any training done.
Hopefully Freightliner Heavyhaul crews will get these sets tested quickly and then TPE might get on with the job of providing a reliable service with adequate seating for passengers.
Err sorry customers!!
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
They were supposed to be in service from this summer. Instead of telling passengers to have patience perhaps we should be telling you to honour your franchise commitments.

Mk5s always planned for the autumn...

And everyone going on about the 802s. This is an initial one, i believe the stated plan is for an initial one to allow some staff familiarisation but I don't think a load more 802s are expected soon.
 

jhy44

Member
Joined
7 Aug 2008
Messages
202
Location
Marylebone (London)
Can someone explain to me why TPE have ordered coaches and engines rather than an MU?
What are the advantages/reasons? From my own uneducated point of view I'd have assumed it would have been cheaper for them to simply procure more 802s than order a third type of train, and with the current love of Bi-Modes, seems odd to be ordering Diesel locos to run partially under the ECML wires.

Explanations/wisdom would be greatly appreciated :)
 

BMIFlyer

Member
Joined
13 Mar 2017
Messages
723
Can someone explain to me why TPE have ordered coaches and engines rather than an MU?
What are the advantages/reasons? From my own uneducated point of view I'd have assumed it would have been cheaper for them to simply procure more 802s than order a third type of train, and with the current love of Bi-Modes, seems odd to be ordering Diesel locos to run partially under the ECML wires.

Explanations/wisdom would be greatly appreciated :)

Need new trains quickly - the locos already exists and have the latest technology on board so just need coaches.

All other manufacturers have massive backlogs hence why the 802 units will be the last to arrive next year.
 

jhy44

Member
Joined
7 Aug 2008
Messages
202
Location
Marylebone (London)
Need new trains quickly - the locos already exists and have the latest technology on board so just need coaches.

All other manufacturers have massive backlogs hence why the 802 units will be the last to arrive next year.

Ah, makes sense, thank you! I hope in due course they replace the Locos with some bi-modes, if such a loco exists.
 

BMIFlyer

Member
Joined
13 Mar 2017
Messages
723
Ah, makes sense, thank you! I hope in due course they replace the Locos with some bi-modes, if such a loco exists.

The class 88 exists but isn't powerful enough on diesel yet for running to class 68 times on TPE services away from the wires.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
I'm sure I read somewhere that the plan was to introduce mk5+68s onto the Newcastle services initially, before cascading them to Middlesbrough/Scarborough/Hull(?) services when the 802s arrive. Is that still the case?
 