The new Nova fleet is a welcome addition for someone like me who needs to use TPE quite frequently. Although it is defined which routes the new stock will operate, I am intrigued to understand if additional carriages would be required in the medium term?
If it was down to me, I would see an additional 2 standard class carriages across the Nova fleet, with the procurement of any additional units to replace any 185s that still need to operate on North Transpennine or WCML Scotland services.
(P.S. One kind request, where someone responds with a reason as to why something can’t happen, please can they also include a possible solution? E.g. one common theme is “Man Airport platforms are too short” and then leave it at that. Well they may be short, but they can accommodate a 200m train, or other stations that have short platforms may be named, but the question should be asked as to why TPE should be serving a small station to begin with?)
- The long-term view seems that TPE services will form the backbone of NPR, which has an aspiration of 200m trains capable of 125mph, which essentially means the 5-car IET units become 8-car equivalents, meaning a capacity upgrade is certainly on the cards. Therefore when would this be needed to service demand (as opposed to an official NPR launch)?
- Additionally there seems to still be 185 units operating on routes designated for the Nova fleet. Is this a long-term situation or temporary? If long-term, then surely TPE could do with additional units?
- If TPE get the Liverpool to Nottingham service, I see the benefit of operating purely 6-car 185 units on both south trans pennine routes, giving passengers a uniform offering on these routes.
- Finally are 5-cars, as they currently operate, enough?
If it was down to me, I would see an additional 2 standard class carriages across the Nova fleet, with the procurement of any additional units to replace any 185s that still need to operate on North Transpennine or WCML Scotland services.
(P.S. One kind request, where someone responds with a reason as to why something can’t happen, please can they also include a possible solution? E.g. one common theme is “Man Airport platforms are too short” and then leave it at that. Well they may be short, but they can accommodate a 200m train, or other stations that have short platforms may be named, but the question should be asked as to why TPE should be serving a small station to begin with?)