Hi everyone

Tottenham Hale had extensive work done with a new station entrance twinned with LU and a new high capacity footbridge and a new escalator and lift/step free access.

But right now it doesn’t seem finished.

The footbridge leads to a back area that makes the journey much longer and feels like a second thought. The gate line at the end of the footbridge is always closed unless they do the very unpopular ticket checks and funnel everyone through this.

95% passengers use the original footbridge so what is the point of the new one.

It looks like the gate line at the end of the footbridge should be extended to the main building but hasn’t happened yet.

I’m sure there were plans to remove the old footbridge and create an access to the road bridge adjacent.

All seems a bit of a waste of time putting the footbridge in!

I tweeted GA who just said “don’t know” which was very useful - NOT!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

VauxhallandI

Established Member
Joined
26 Dec 2012
Messages
2,749
Location
Cheshunt
Yep the route is a lot longer than it was before, backward step for Southbound connection from rail to tube
 

TheHSRailFan

Member
Joined
16 Jun 2018
Messages
297
To be honest, I was hoping the station's redo would be been better... the new platform and station entrance are... fine at best. However, the new footbridge serves no use anymore and the station really does need a redo from fresh.
 

jon81uk

Member
Joined
17 Aug 2022
Messages
1,093
Location
Harlow, Essex
I went off looking for plans a while ago and it seems the original plan submitted for planning permission back in 2013 was for the footbridge to be built closer to the station building and steps/esaclators would lead directly up from the side of the ticket hall onto it. Instead as the footbridge was built earlier and seperately there is no integration and we get overcrowding outside the waiting room space as the platform isn't wide enough for everyone to pass down.
 