Hi everyone
Tottenham Hale had extensive work done with a new station entrance twinned with LU and a new high capacity footbridge and a new escalator and lift/step free access.
But right now it doesn’t seem finished.
The footbridge leads to a back area that makes the journey much longer and feels like a second thought. The gate line at the end of the footbridge is always closed unless they do the very unpopular ticket checks and funnel everyone through this.
95% passengers use the original footbridge so what is the point of the new one.
It looks like the gate line at the end of the footbridge should be extended to the main building but hasn’t happened yet.
I’m sure there were plans to remove the old footbridge and create an access to the road bridge adjacent.
All seems a bit of a waste of time putting the footbridge in!
I tweeted GA who just said “don’t know” which was very useful - NOT!
Tottenham Hale had extensive work done with a new station entrance twinned with LU and a new high capacity footbridge and a new escalator and lift/step free access.
But right now it doesn’t seem finished.
The footbridge leads to a back area that makes the journey much longer and feels like a second thought. The gate line at the end of the footbridge is always closed unless they do the very unpopular ticket checks and funnel everyone through this.
95% passengers use the original footbridge so what is the point of the new one.
It looks like the gate line at the end of the footbridge should be extended to the main building but hasn’t happened yet.
I’m sure there were plans to remove the old footbridge and create an access to the road bridge adjacent.
All seems a bit of a waste of time putting the footbridge in!
I tweeted GA who just said “don’t know” which was very useful - NOT!