So, with SWR done, I think it's time for a more general thread to cover the renationalisations of TOCs, since this is something that'll be happening pretty often. Next up (at time of writing) is C2C, 20th July, then Greater Anglia, 12th October.
Previous SWR thread here: https://www.railforums.co.uk/threads/south-western-railway-nationalisation-time.286670/
I was wondering what time C2C will be taken over, as SWR was in the middle of the night. Is it going to be the same here?
Previous SWR thread here: https://www.railforums.co.uk/threads/south-western-railway-nationalisation-time.286670/
I was wondering what time C2C will be taken over, as SWR was in the middle of the night. Is it going to be the same here?