gordonthemoron
Established Member
TGVs are nothing special comfort wise
TGVs are nothing special comfort wise
Thankyou for that analysis, HSTEd.
Obviously the trains won't be 100% full even at those prices, so if these trains are at an average of 30% capacity (as is the current situation on the WCML, I believe), then this pushes up the break-even cost of a Birmingham ticket to about £50 and a Manchester/Leeds ticket to around £60. (Calculated assuming the cost of a Birmingham train will be £21'918.38 and Manchester/Leeds train £26'237.20, worked out using your analysis).
For comparison, here are the current Anytime Returns from London: EUS-BHM £79.00, EUS-MAN £148.00 and STP-LDS £124.50.
I don't think that just because HS2 will be to larger loading gauge will necessarily mean "more comfort". You could still end up with rock hard seats sitting on top of a whining motor bogie and underneath an annoyingly loud air con system. My point is that it's not all about space.
For continental loading gauge we should thinking Great Central...surely that line could also be rebuilt, at a fraction of the HS2 cost, for 150mph running?? The alignment is there, there may be a need to knock a few houses down, but if there's a will......
HS2 does not stack up, 90% vanity, 10% reality.
For continental loading gauge we should thinking Great Central...surely that line could also be rebuilt, at a fraction of the HS2 cost, for 150mph running?? The alignment is there, there may be a need to knock a few houses down, but if there's a will......
HS2 does not stack up, 90% vanity, 10% reality.
For continental loading gauge we should thinking Great Central...surely that line could also be rebuilt, at a fraction of the HS2 cost, for 150mph running?? The alignment is there, there may be a need to knock a few houses down, but if there's a will......
HS2 does not stack up, 90% vanity, 10% reality.
The idea that the GC was built to continental gauge is a myth, the London extension was more generous - but only that section. Rebuilding the GC is daft. It provides none of the solutions to the problems we need to. It's nonsense when you really think about it. Where would it run to in London? Marylebone is now very busy. How does it get freight off the WCML? It doesn't. It's an enthusiasts pipe dream that solves nothing.
One thing I can't understand about HS2 is the fact that 8ft either side of the WCML and ECML are owned by NR already, anybody thought about placing 2 more lines on said land??
One thing I can't understand about HS2 is the fact that 8ft either side of the WCML and ECML are owned by NR already, anybody thought about placing 2 more lines on said land??

As I remember it,the Central Railway proposal was a fully costed sensible project which would have indeed taken all the freight off the WCML.The government admitted as much,but they were frightened that if anything went wrong they would be left to pay the balance of the funding and therefore wouldn't pass the bill through parliament.
We need a heavy freight railway just as much as we need a high speed passenger railway.
No. We don't. The FOCs simply couldn't afford to pay the costs of a railway only they use and have to cover all the costs. They'd go bust overnight. It's why the idea has always been a non-starter. No-one bothered to ask the FOCs what they thought of the idea. Their answer? - it's a bad one!
Actually, what proportion of freight comes via ferry/chunnel and what comes from container ships?
We need a heavy freight railway just as much as we need a high speed passenger railway.
It's not as if it would be difficult to cobble together a 75mph alignment that isn't in any way obstructed by HS2 through to the Midlands that avoids London. Then electrify and clear for 20'3" (that is the tallest practical standard gauge loading gauge, and since we only get to build it once......)
The point you've ignored still stands. A purely freight railway will never cover its costs and none of the FOCs can afford (or want) one. That's the reality.
He hasn't ignored the point Paul,the fact is the Central Railway project was scrutinized and indeed it was found a viable proposition
To say the FOC's don't want one,I also do not agree with ,as similar a proposal is being attempted with the S&C and it's branch to remove freight from the northern reaches of the WCML and as you know it is the southern end that is far more congested,so it's fair to say seperating the two types of traffic would be attractive to both groups...
They built a dedicated freight railway from Rotterdam docks direct into Germany - is that a white elephant?