backontrack
Established Member
Westbury
1. How to play.....
In the event of long-term engineering works, these should be ignored unless they span a timetable period and are noted in the National Rail Timetable.
Newbury
--- old post above --- --- new post below ---
In answer to the query raised about the Lamington Viaduct, those works do not span the full entirety of a timetable period, so cannot be noted in the RED SECTION which is at the foot of the rules section of the very first posting on this quiz.
--- old post above --- --- new post below ---Temporary disruptions, such as landslips or flooding, should be ignored unless the disruption period exceeds one month.
Because this is prolonged, shall we assume Lockerbie to Carstairs to be shut until further notice? (We treated Banbury to Leamington similarly last year when it had that landslip.)
Grateley
*raises hand*
Whats the rule on stations that have no service but remain open such as Newhaven Marine or the other two whose names escape me at the moment but which remain technically open
Salisbury
I'll PM adtrainz to ask him to update the Red Section accordingly.
--- old post above --- --- new post below ---
Perhaps ask a mod or admin? adtrainz hasn't been seen online since 7 June 2015.
*raises hand*
Whats the rule on stations that have no service but remain open such as Newhaven Marine or the other two whose names escape me at the moment but which remain technically open
Yeah, that's probably a better idea!I'll PM OxtedL when I get home.