• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

The next station is...!

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Trainfan344

Established Member
Joined
13 Oct 2012
Messages
2,305
Kintbury
--- old post above --- --- new post below ---
It should be noted that while unrelated to this current leg, The Lamington Viaduct disruption is expected to continue until March meaning it should be included in the Red Text Section on the first page
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,411
Location
A typical commuter-belt part of north-west England
Newbury
--- old post above --- --- new post below ---
1. How to play.....

In the event of long-term engineering works, these should be ignored unless they span a timetable period and are noted in the National Rail Timetable.

In answer to the query raised about the Lamington Viaduct, those works do not span the full entirety of a timetable period, so cannot be noted in the RED SECTION which is at the foot of the rules section of the very first posting on this quiz.
 

Trainfan344

Established Member
Joined
13 Oct 2012
Messages
2,305
Newbury
--- old post above --- --- new post below ---


In answer to the query raised about the Lamington Viaduct, those works do not span the full entirety of a timetable period, so cannot be noted in the RED SECTION which is at the foot of the rules section of the very first posting on this quiz.

I was thinking of this quote:


Temporary disruptions, such as landslips or flooding, should be ignored unless the disruption period exceeds one month.
--- old post above --- --- new post below ---
Newbury Racecourse
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,411
Location
A typical commuter-belt part of north-west England
Thatcham

--- old post above --- --- new post below ---

The latest news from Network Rail say that it will be expected that the required works at the Lamington Viaduct will now not be completed prior to early March. so I see where the two sections of the rules can be confusing. It all depends what you think the type of works on the Lamington Viaduct should be described as.
 
Last edited:

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
Because this is prolonged, shall we assume Lockerbie to Carstairs to be shut until further notice? (We treated Banbury to Leamington similarly last year when it had that landslip.)
 

Trainfan344

Established Member
Joined
13 Oct 2012
Messages
2,305
Because this is prolonged, shall we assume Lockerbie to Carstairs to be shut until further notice? (We treated Banbury to Leamington similarly last year when it had that landslip.)

Sounds like a smart idea.
--- old post above --- --- new post below ---
Basingstoke
 

Darren R

Established Member
Joined
26 Jan 2013
Messages
1,252
Location
Lancashire
GENERAL INFORMATION

Re: the earlier discussion regarding the ongoing problems at Lamington. The precedence on this thread is that "engineering work" has always meant pre-planned and publicly advertized. Rule 1 was applied when the line through Dawlish was closed for an extended period in similar, weather-related circumstances.

Therefore, the following routes may be considered 'out-of-bounds':

Dover Priory to Folkestone Central
(closed until further notice)
Lockerbie to Carstairs (closed until Monday 29th February)

Currently there are also weather-related closures still ongoing elsewhere. National Rail Enquiries is currently advising that these will all be resolved by the end of January. Therefore, unless closure is further extended beyond the end of this month, the following routes are still in play:

Prudhoe to Hexham
Girvan to Stranraer
Llandudno Junction to Blaenau Ffestiniog

I'll PM adtrainz to ask him to update the Red Section accordingly.
--- old post above --- --- new post below ---
----------------------------------------------------------------------------




Salisbury
 

HMS Ark Royal

Established Member
Joined
2 Sep 2015
Messages
2,798
Location
Hull
*raises hand*

Whats the rule on stations that have no service but remain open such as Newhaven Marine or the other two whose names escape me at the moment but which remain technically open
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,411
Location
A typical commuter-belt part of north-west England
*raises hand*

Whats the rule on stations that have no service but remain open such as Newhaven Marine or the other two whose names escape me at the moment but which remain technically open

When you say "the other two", were you thinking of the three stations of Wedgwood, Barlaston and Norton Bridge in the Midlands, who all have not been closed as yet, but do not receive any rail services?


Perhaps an adjudicator could come to your assistance on that matter that you have raised and give clarification.
--- old post above --- --- new post below ---
Salisbury

Tisbury
 

Darren R

Established Member
Joined
26 Jan 2013
Messages
1,252
Location
Lancashire
Thornford



--- old post above --- --- new post below ---
--- old post above --- --- new post below ---


Perhaps ask a mod or admin? adtrainz hasn't been seen online since 7 June 2015.


Yeah, that's probably a better idea! :oops: I'll PM OxtedL when I get home.


*raises hand*

Whats the rule on stations that have no service but remain open such as Newhaven Marine or the other two whose names escape me at the moment but which remain technically open

If you can't catch a regular timetabled train to the station, it doesn't count. ;) We'll have no bustitutions on this quiz, thank you! :D
 
Last edited:

Top