Bejasus the amount of veggie at Fencehouses is incredible!!Ive walked the line in its entirity between Shincliffe and Fence Houses and there are woods growing between the rails south of Fence Houses, fly tipping at Leamside, and there are bits of trackwork missing and landslips along the entire stretch.
In short, the whole lot would need replacing.
Wonder if it could be done in some way such as HS1. Either that or selling the land off completely to a private company, who have running rights to Middlesbrough and Newcastle and own the rest of the line and stations.
ReverendFozz said "Been thinking about the Leamside Line, if it ever were to come back into use, would it not be worth Doubling the line all the way to South Hylton, then going beyond South Hylton to the Leamside Line, I was also thinking, could Park Lane not be converted into the Mainline Station for Sunderland, with a loop to Newcastle, Park Lane-Washington-Newcastle-Sunderland(via Durham Coast Line) and a loop to Teesside, Park Lane-Washington-Fencehouses-Durham 'Parkway'-Ferryhill-Stockton-Boro-Hartlepool-Sunderland(via Durham Coast), with the possibility of adding some long distance services out of Park Lane to York, Leeds, Manchester, Liverpool, even Edinburgh or Glasgow(via Carlisle), that would use the Leamside, giving Sunderland a link with Durham without going onto the ECML, I don't think it should be used for Metro to be honest, keep it heavy rail to try and provide long lost links, also as part of my idea, I would convert the rest of the Sunderland line to Heavy Rail from Park Lane to South Hylton, with immediate stations being utilised for local stopping service between Sunderland, Washington and Newcastle.
The Hylton line is already double except for a 100 yards or so approaching the platform.If Hylton station proper was reopened it would mean reinstatement of the level crossing and the present platform would be better off being relocated to the original site on the other side of the road.
My understanding of the line is that it is engineered to Heavy Rail standards but I think the ferocious gradients on the approach to Pallion station would knock seven bells out of most diesel rolling stock.
Even in BR days the climb out of Sunderland to Fawcett Street Junction (site of Park Lane station) was often too much for a Deltic!
PS I nearly forgot one of the problems with reopening Hylton - Penshaw is that when the A19 was built just west of Hylton in 1970 a bridge was provided over the trackbed (in fact the rails were still in position then , disused for 3 years) but it was given a solid concrete base (at track height) and is not wide enough for double track.
My naturally cynical nature makes me think that this done on purpose so the line could not be reopened, as the entire bridge would need to be replaced at enormous cost.
"Also, from South Hylton onwards, any reconstruction would struggle with the "no new level crossings" rule. It would have about 4 or 5 just to Penshaw. "
The "no new level crossings" "rule" is, I think, a kneejerk reaction to media coverage of accidents at level crossings which largely ignores the fact that such accidents are almost invariably the fault of road users.In any case it contains the proviso "except in exceptional circumstances". The only two "real" level crossings would be Hylton and Coxgreen - the crossings at Offerton and near Penshaw are little more than field and farm access and could easily be rerouted.
Is it really likely that if Network Rail, Nexus and Tyne & Wear Council decided between them to reopen the line they would say "ARRRGGGH!! - 2 level crossings so we can't do it"?
Where is the 4 or 5 Crossings, are they between Penshaw and Follingsby or Sunderland or Penshaw, the ones I only of are Sulgrave and Fencehouses, but then I don't the area where a train would run through beyond South Hylton to the Leamside Line, I dont know how feasible it would be, but simply build bridges wide enough to let trains through at Sulgrave, Fencehouses and elsewhere along the line, or use double barriers both sides to stop cars weaving through, or put traffic lights on the Crossing with a signal box at each crossing with somebody flicking the switch to turn the lights red when need be
Of course this has nothing much to do with the Leamside line.
Only in the opposite sense, ie if they can path all the capacity they need down the coast there'll be less immediate need for the Leamside route...
Have been travelling past the Boldon Curve junction at Brockley Whinns Metro recently and it looks like the disused section is being repaired.
Old tracks been taken up and new ones put down it seems. Not long before a lot more freight traffic heads down the Durham Coast Line instead of the ECML.
Of course this has nothing much to do with the Leamside line.
I think that would be a long term aspiration though. Whilst the idea of Sunderland to South Shields through Metros appeals to me, especially given the proximity of Brockley Whins to Tyne Dock, any sort of regular service would require the doubling of what has only ever been a single track curve, and upgrading of the track towards Tyne Dock, as given the Tyne and Wear Metros’ “lively” performance when running on rough track, I’d think the ride characteristics over this section of line would be akin to a ship in a storm….Though by Hyrdo's account, it seems that quite a lot of work is already being done. Also, this would require South Shields bound services to cross the Durham Coast up line, putting more pressure on the limited capacity of the route.It has taken them a while to do it, considering that it has been in the Route Utilisation Stragetgy for a long time. Tyne Dock keeps winning contracts to move stuff, one of the recent ones has been biofuels for somewhere on Teesside.
One thing this does mean is that there is a greater likelihood of Metros using the line and infilling the Brockley Whins - Tyne Dock gap.
I think that would be a long term aspiration though. Whilst the idea of Sunderland to South Shields through Metros appeals to me, especially given the proximity of Brockley Whins to Tyne Dock, any sort of regular service would require the doubling of what has only ever been a single track curve, and upgrading of the track towards Tyne Dock, as given the Tyne and Wear Metros lively performance when running on rough track, Id think the ride characteristics over this section of line would be akin to a ship in a storm .Though by Hyrdo's account, it seems that quite a lot of work is already being done. Also, this would require South Shields bound services to cross the Durham Coast up line, putting more pressure on the limited capacity of the route.
It'll be good to see the curve back in use for freight though, the reopening of that section has been talked about and rumoured for years.
Probably one of the more likely reopenings as it doesn't need too much infratsructure works apart from new stations and electrics. Certainly nothing like tunnelling in the west end of Newcastle. Don't think it will happen anytime soon but possibly could be feasible when the current Metrocars are retired, so more stock could mean it will happen. Also I haven't heard any more info about the new stabling point at South Shields, but again this would make a South Shields - Sunderland link more realistic.
You'd be suprised the amount of people who change at Pelaw for a service to/from South Shields or Sunderland. Plus it is the intermediate stations as well, which would be better served. If you wanted to go from say Tyne Dock to Brockley Whins now you'd probably get a bus, but if the link was there it would open up more possibilities.
Operationally it would be good as you could have a new route to South Shields in case there is a problem between Bede and Pelaw, and also Brockley Whins and Tyne Dock could be used like shuttle stations.
What have the last few posts got to do with the Leamside? They are well off route, never mind topic.
What have the last few posts got to do with the Leamside? They are well off route, never mind topic.
Not too far off topic as the Boldon Curve is only a mile or so away from the Leamside line. Any diversion south from Tyne Dock could influence traffic on the Leamside line. Also, dont take the place too seriouslyIts all hypothetical anyway.
You must be new here! Going off topic is kind of a pass time round here![]()
To address your point though, is there the demand that would justify a Tyne Dock-Brockley Whinns/Boldon/Sunderland service that a bus route would not better serve?
The one good thing is that it is wholly within Tyne and Wear - looking at other possible line extensions and reopenings, such as Leamside line, ABT and Ponteland, all three would require some sort of input from a council outside of Nexus' remit. It is hard to quantify demand at the minute, but I think there is a good market there - even if it does mean abstraction of passengers from bus services. When we used to go to the airshow at Seaburn, before the Sunderland extension was opened, often we'd go to South Shields and get one of the E1 buses along the coast. Even this took quite a while just to get to Seaburn. Admittedly I'm not sure what the fastest bus is to Sunderland from South Shields at the minute, but I'm sure a Metro between the two would be well used.