• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

The future of the Ladywell Bypass

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

cle

Established Member
Joined
17 Nov 2010
Messages
5,667
Quite, and terminating at Kent House is the obvious alternative.
It used to be used for some of these peak shorter runs (it's rarely used for overtaking) - so that could come back in theory. It's actually an option for the Rainham and adding some extras, if admittedly 8 car length.

I feel like shortening the platforms and moving signals would be quite the faff for some stations on the line. New Beckenham springs to mind as the current train stopping position for up trains is bizarrely far away from the platform entrance/tunnel. I think on a 10 car train only the rear 3 carriages are by the station building.
The signalling would have to change regardless. As to what they do, it'll depend on what happens north of Queens Park, and that NR interoperability.

As frequency will likely need to go up (I think NXG and Lewisham alone will be like Brixton/H&I type demand) - homes for these additional services from Queens Park and up also needs to be considered. Not easy (Stonebridge Park depot needed) - given the 4tph Euston service too which presumably will survive.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,382
Strictly speaking, the existing electrification infrastructure could remain in place, with an earthed fourth rail added in the style of the Watford DCs.

I think a total rebuild is more likely though, given the line will likely need all the platforms reworking with higher track level.
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
826
Location
London
Strictly speaking, the existing electrification infrastructure could remain in place, with an earthed fourth rail added in the style of the Watford DCs.

I think a total rebuild is more likely though, given the line will likely need all the platforms reworking with higher track level.
If they are doing a total rebuild, would it not be easier to raise the level of the tracks?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,382
If they are doing a total rebuild, would it not be easier to raise the level of the tracks?
Yes, that's what I meant.

Raisinh the track level is likely easier than lowering the platforms.
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
826
Location
London
Yes, that's what I meant.

Raisinh the track level is likely easier than lowering the platforms.
I seem to recall 2 times when the track level was raised on the Hayes line, once in the 60s at Clock House to stop the flooding issues and in 1998 for Elmers End and the trams.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,293
Yes, that's what I meant.

Raisinh the track level is likely easier than lowering the platforms.
I seem to recall 2 times when the track level was raised on the Hayes line, once in the 60s at Clock House to stop the flooding issues and in 1998 for Elmers End and the trams.
Given the lack of height on some of the road underbridges for high vehicles, raising the track levels and the bridge decks in places near some stations might be fairly good idea.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,672
Location
Northampton
Given the lack of height on some of the road underbridges for high vehicles, raising the track levels and the bridge decks in places near some stations might be fairly good idea.
@hwl - I think the difference between platform heights is in the order of a couple hundred millimetres. I think reconstruction of bridge decks is extremely unlikely.
 
Last edited:

cle

Established Member
Joined
17 Nov 2010
Messages
5,667
Raising the track for Beckenham Junction P4 seems more realistic. As for the others, it'll be interesting to see.

But plenty of platform land will go unused. Maybe it won't be touched, but I would hope for some TOD near to the stations upon conversion. Catford has apts right between them!

The stations themselves might get built out a bit more - most are two side platforms with a cursory building on just one side - would have more in the barriers etc - or change to single egress)
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
826
Location
London
Raising the track for Beckenham Junction P4 seems more realistic. As for the others, it'll be interesting to see.

But plenty of platform land will go unused. Maybe it won't be touched, but I would hope for some TOD near to the stations upon conversion. Catford has apts right between them!

The stations themselves might get built out a bit more - most are two side platforms with a cursory building on just one side - would have more in the barriers etc - or change to single egress)
I have a feeling the two Catfords will eventually merge in the future. I have no doubt that TfL will make the interchange easier even without removing the buildings.

Also, I wonder what the gateline situation would be like for Beckenham Junction, as it currently has no gates and will also be shared between 3 TOCs (SE, SN and TfL) if this gets completed.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,334
Location
London
If the legislation for building the eventual Extension phase 2 allows for the closure of the Ladywell Loop then closure would be the neatest solution. If for whatever reason formal closure doesn't happen and you end up needing a parliamentary service then it would be messy (unless that parliamentary service can be provided in the form of a weekly bus ...).
 
Status
Not open for further replies.

Top