Quite, and terminating at Kent House is the obvious alternative.Quite a big "if", I would have thought - and not exactly the most critical part of the timetable at Beckenham
Quite, and terminating at Kent House is the obvious alternative.Quite a big "if", I would have thought - and not exactly the most critical part of the timetable at Beckenham
It used to be used for some of these peak shorter runs (it's rarely used for overtaking) - so that could come back in theory. It's actually an option for the Rainham and adding some extras, if admittedly 8 car length.Quite, and terminating at Kent House is the obvious alternative.
The signalling would have to change regardless. As to what they do, it'll depend on what happens north of Queens Park, and that NR interoperability.I feel like shortening the platforms and moving signals would be quite the faff for some stations on the line. New Beckenham springs to mind as the current train stopping position for up trains is bizarrely far away from the platform entrance/tunnel. I think on a 10 car train only the rear 3 carriages are by the station building.
If they are doing a total rebuild, would it not be easier to raise the level of the tracks?Strictly speaking, the existing electrification infrastructure could remain in place, with an earthed fourth rail added in the style of the Watford DCs.
I think a total rebuild is more likely though, given the line will likely need all the platforms reworking with higher track level.
Yes, that's what I meant.If they are doing a total rebuild, would it not be easier to raise the level of the tracks?
I seem to recall 2 times when the track level was raised on the Hayes line, once in the 60s at Clock House to stop the flooding issues and in 1998 for Elmers End and the trams.Yes, that's what I meant.
Raisinh the track level is likely easier than lowering the platforms.
Yes, that's what I meant.
Raisinh the track level is likely easier than lowering the platforms.
Given the lack of height on some of the road underbridges for high vehicles, raising the track levels and the bridge decks in places near some stations might be fairly good idea.I seem to recall 2 times when the track level was raised on the Hayes line, once in the 60s at Clock House to stop the flooding issues and in 1998 for Elmers End and the trams.
@hwl - I think the difference between platform heights is in the order of a couple hundred millimetres. I think reconstruction of bridge decks is extremely unlikely.Given the lack of height on some of the road underbridges for high vehicles, raising the track levels and the bridge decks in places near some stations might be fairly good idea.
I have a feeling the two Catfords will eventually merge in the future. I have no doubt that TfL will make the interchange easier even without removing the buildings.Raising the track for Beckenham Junction P4 seems more realistic. As for the others, it'll be interesting to see.
But plenty of platform land will go unused. Maybe it won't be touched, but I would hope for some TOD near to the stations upon conversion. Catford has apts right between them!
The stations themselves might get built out a bit more - most are two side platforms with a cursory building on just one side - would have more in the barriers etc - or change to single egress)