Fingers crossed Monday 4rd September. 0656 and 0733 ex PBO. 1742 and 1812 return.
Does this mean Canal Tunnels will now be regularly used for stock movement?
Fingers crossed Monday 4rd September. 0656 and 0733 ex PBO. 1742 and 1812 return.
Does this mean Canal Tunnels will now be regularly used for stock movement?
Fingers crossed Monday 4rd September. 0656 and 0733 ex PBO. 1742 and 1812 return.
It's just before Fridesday 21th Septober.I'm not aware of such a date![]()
Fingers crossed Monday 4rd September. 0656 and 0733 ex PBO. 1742 and 1812 return.
I know it's more track related than the 700s themselves, but can I just get a quick clarification on something? They say they're "constructing a new chord" from Blackfriars to London Bridge, except it's not really a new junction is it, it was always there in the first place, it's just being altered, am I right?
Well the new alignment is a double tracked chord where is was at the Junction single tracked , so technically it's not a "new chord", but part used to exist
AIUI the final layout has three tracks on a significant part of the overall chord distance, with the centre road of 3 being bi-directional. I expect someone will know the exact lengths, but maybe they will be able to hold a train on the chord during perturbation.
Driver complaining about sensitive doors at Loughborough Junction this evening.
Haha you were on that too were you!? He also said to stand away from the button areas didn't he, whatever difference that was meant to make!
2V17 was the service, always pretty rammed that one.
Wasn't it always double tracked to halfway down the ramp. I can remember many times being on southbound trains waiting there whilst a northbound one passes over the single lead exit onto the ramp before it passed.
Looking at the formation on Saturday from the overbridge, it looked like relaid twin track all the way down the ramp now.
AIUI the final layout has three tracks on a significant part of the overall chord distance, with the centre road of 3 being bi-directional. I expect someone will know the exact lengths, but maybe they will be able to hold a train on the chord during perturbation.
Just spotted 700015 (one of the eight car units) south of Hatfield, moving slowly on the Down Slow. Surprised to see it out on the Great Northern so soon after the morning peak.
EDIT: There's a lot of them parked up in the sidings on the Down side of Hornsey!
The final layout on the Chord is for three tracks, none are bidirectional.
. Does this mark the start of driver training on these in earnest?
Hi
Not sure where else to post, does anyone know if tomorrow's 5Q15 clapham yard to Portsmouth and southsea is likely to run? It's VSTP and all the paths are there, to petersfield etc.
Many thanks
Yes I mean 707s but cannot find the equivalent for 707 thread.
Remind me when tables will.will . be fitted this year or. .