• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thameslink/ Class 700 Progress

Status
Not open for further replies.

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
I'd sooner have proper mobile coverage installed in St Pancras (low level), so I don't need to use Wi-Fi on the train OR try and use the Wi-Fi service that I've had problems logging in to - and requires personal details (like many) before you can get access at all.

Wi-Fi on a train is fine. If it's free, there's definitely no harm in having it. I don't it's that vital though.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
I'd sooner have proper mobile coverage installed in St Pancras (low level), so I don't need to use Wi-Fi on the train OR try and use the Wi-Fi service that I've had problems logging in to - and requires personal details (like many) before you can get access at all.

Wi-Fi on a train is fine. If it's free, there's definitely no harm in having it. I don't it's that vital though.

That was my inference in post #2514. Although I'm sure that every effort is being made to ensure that the 700s are as trouble-free as possible, there's still the possibility of a brand-new design having unforseen issues so all available resources should be concentrating on the things that would make or break the service's viability. If necessary, deployment of wi-fi should be shelved until the trains are performing adequately in their primary function, i.e. carrying lots of passengers safely.
They've got until 2020 anyway.
 
Last edited:
Joined
24 Mar 2009
Messages
592
That was my inference in post #2514. Although I'm sure that every effort is being made to ensure that the 700s are as trouble-free as possible, there's still the possibility of a brand-new design having unforseen issues so all available resources should be concentrating on the things that would make or break the service's viability. If necessary, deployment of wi-fi should be shelved until the trains are performing adequately in their primary function, i.e. carrying lots of passengers safely.
They've got until 2020 anyway.

Good point, well made. I'd prefer the oily bits and sparky bits of the trains to work when they enter service. I'm not really bothered about on-train WiFi. In my experience (Virgin Trains, I'm pointing at you) the service is patchy at best.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
I doubt Wi-Fi would cause any issues to the rest of the train functionality. I'm sure that whether it was part of the design request, Siemens has a simple off the shelf system to retrofit at any time.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,019
Location
St Albans
I doubt Wi-Fi would cause any issues to the rest of the train functionality. I'm sure that whether it was part of the design request, Siemens has a simple off the shelf system to retrofit at any time.

I'm sure that installing wi-fi will be relatively trouble-free, but it will take a finite resource to get it fully operational, so any proirity on that resource would be for the more mundane functions of the train.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
The bigger issue will be NR getting the signal to the train I'd have thought.
 

BelleIsle

Member
Joined
24 Aug 2012
Messages
116
I'd sooner have proper mobile coverage installed in St Pancras (low level), so I don't need to use Wi-Fi on the train OR try and use the Wi-Fi service that I've had problems logging in to - and requires personal details (like many) before you can get access at all.

Wi-Fi on a train is fine. If it's free, there's definitely no harm in having it. I don't it's that vital though.

Here here. Personally, I would like some sort of mobile coverage sorted all the way past West Hampstead as it can be a little patchy with all those tunnels and cuttings to negotiate.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
@Class377/5 have you had your training on them yet? if you have what do you think about from from a driver's point of view?
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
I drove past one yesterday around Horley. Not a fan of the Panto Lights being on all the time.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
@Class377/5 have you had your training on them yet? if you have what do you think about from from a driver's point of view?

Don't think he's a driver, stand to be corrected though!

Not a driver but views from a cab are great compared to current stock. Happy to hear to from a actual driver view point but ones I've spoken to stated it's a far better experience with driving position front and center for the train.

I notice the new diamond shaped stop boards haven't yet appeared at stations on the Catford loop (not sure about Sutton way)?

I'm not going to believe the 319s are actually going until the signs go up...

Already been mentioned in staff briefs about Sutton trains going over to 700 operation this year. Note the 12th 700 is planned to be a 700/0 so won't be long until right stock is here.

I drove past one yesterday around Horley. Not a fan of the Panto Lights being on all the time.

You might not like it but it's going to be useful in dealing with incidents. Been many events in Core with things in the pan well so working out where they've come from is going to help. And the lights are required for this. The 87s don't record unless pan is in use so aren't that great at helping track event causes.
 
Last edited:

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Not a driver but views from a cab are great compared to current stock. Happy to hear to from a actual driver view point but ones I've spoken to stated it's a far better experience with driving position front and center for the train.



Already been mentioned in staff briefs about Sutton trains going over to 700 operation this year. Note the 12th 700 is planned to be a 700/0 so won't be long until right stock is here.



You might not like it but it's going to be useful in dealing with incidents. Been many events in Core with things in the pan well so working out where they've come from is going to help. And the lights are required for this. The 87s don't record unless pan is in use so aren't that great at helping track event causes.

Maybe but out on the BML there isn't all that much that goes on overhead. Maybe they'll be useful for inspecting Balcombe Tunnel.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Maybe but out on the BML there isn't all that much that goes on overhead. Maybe they'll be useful for inspecting Balcombe Tunnel.

I'm talking about the BML and SEML where events the track have caused massive issues cause but cannot be traced back to the original location to lack of evidence.
 

dlj83

Member
Joined
11 Mar 2012
Messages
168
Apologies for low quality, but seen at Streatham Common last night
 

Attachments

  • DSC_1052.jpg
    DSC_1052.jpg
    100.7 KB · Views: 188
  • DSC_1056.jpg
    DSC_1056.jpg
    98 KB · Views: 180
  • DSC_1051.jpg
    DSC_1051.jpg
    93.5 KB · Views: 185
  • DSC_1057.jpg
    DSC_1057.jpg
    96.7 KB · Views: 239

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
As I finished my shift, 1X700 (unknown No) was departing the depot for a daytime run, so someone's getting brave now lol :D
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
700107/108/110 all went out on driver training today.can expect to see more of this now.
 

Cundy66

Member
Joined
6 Jan 2012
Messages
231
Location
Bedford
Been told that there's now two 700's with ThamesLink and will be operating out of Bedford on Thursday 11th/Friday 12th Feb, didn't get times but was told they would be different headcodes from before, not my biggest knowledge area, so was wondering if anyone knew what the schedule was.

Also can anyone confirm which number they have now, as I saw one at Cricklewood Tuesday 2nd Feb so hope to be able to trace which it was.

Thanks in advance.

Cundy66
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,460
Location
Gomshall, Surrey
On the attached photo, 700109 has one window blanked out on the 4th car from the rear, and two on the 6th. I assume these are for toilets - can anyone confirm this, please?
 

Attachments

  • 24803260651_da3164fe8b_z.jpg
    24803260651_da3164fe8b_z.jpg
    293.4 KB · Views: 114
Last edited:

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,032
Location
Newhaven
Been told that there's now two 700's with ThamesLink and will be operating out of Bedford on Thursday 11th/Friday 12th Feb, didn't get times but was told they would be different headcodes from before, not my biggest knowledge area, so was wondering if anyone knew what the schedule was.

Also can anyone confirm which number they have now, as I saw one at Cricklewood Tuesday 2nd Feb so hope to be able to trace which it was.

Thanks in advance.

Cundy66

Is this for mainline service or testing?
Thanks
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
On the attached photo, 700109 has one window blanked out on the 4th car from the rear, and two on the 6th. I assume these are for toilets - can anyone confirm this, please?

I hope that's the private lounge area for me (with comfy sofa, power socket and tip-down table). I did ask someone at Siemens when I saw the mock up at ExCeL, so hopefully they didn't disappoint me....
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
On the attached photo, 700109 has one window blanked out on the 4th car from the rear, and two on the 6th. I assume these are for toilets - can anyone confirm this, please?

Going by the map, the blank window in the 4th car FTR is a toilet, the blank in the 6th car FTR is the disabled toilet.
 
Status
Not open for further replies.

Top