8-car units for instance will be used for Tattenham Corner-Cambridge. Already a lot of station lengthening/SDO needed for that
yeh, although ive heard nothing about platform extensions on the tatt branch... so i assume itll be all SDO down there.
8-car units for instance will be used for Tattenham Corner-Cambridge. Already a lot of station lengthening/SDO needed for that
yeh, although ive heard nothing about platform extensions on the tatt branch... so i assume itll be all SDO down there.
Correct as I understand. Tattenham already has 8 car trains operating so it's a simple swap for 377 to 700s.
8 cars at both stations via the Horsham service which stops there.Any idea if New Cross Gate or Norwood Junction are going to get lengthened or will they just get infrequent 8 car TL services?
Any idea if New Cross Gate or Norwood Junction are going to get lengthened or will they just get infrequent 8 car TL services?
I think norwood junction is getting a platform back but not sure when or if it will be 8 or 12 car.
Any idea if New Cross Gate or Norwood Junction are going to get lengthened or will they just get infrequent 8 car TL services?
Norwood Junction's extra platform (on the down side) was a development project around 2012 or so, proposed in connection with terminating and reversing some peak trains from the Crystal Palace direction, this was supposedly more economical with rolling stock diagrams, however last time we discussed it the details had been completely removed from NR's CP5 enhancement plans. Possible reason being that the combined TSGN franchise will shortly have more rolling stock that it can use...
The extra platform Norwood is still the cards but it's for the current Beckenham Junction service to be diverted too as Talbot want to double track the route. Note this is a TfL lead scheme so why might not been in the NR plans.
Are there any stations on that branch that are (or close to) 8-cars in length? Perhaps Coulsdon Town for example? I was under the impresssion that the announcements just tell you to join the front 4 coaches for all stations because there is no SDO on the 455's that sometimes work this line.
Norwood Junction's extra platform (on the down side) was a development project around 2012 or so, proposed in connection with terminating and reversing some peak trains from the Crystal Palace direction, this was supposedly more economical with rolling stock diagrams, however last time we discussed it the details had been completely removed from NR's CP5 enhancement plans. Possible reason being that the combined TSGN franchise will shortly have more rolling stock that it can use...
Are there any stations on that branch that are (or close to) 8-cars in length? Perhaps Coulsdon Town for example? I was under the impresssion that the announcements just tell you to join the front 4 coaches for all stations because there is no SDO on the 455's that sometimes work this line.
It was canned as there was no point spending several million on putting in extra bidi signalling now when it is all due to be renewed in the next 5 years or so, and it thus comes almost for 'free'.
That would make sense. I assume your 'Talbot' above is a really poor autocorrect for Tramlink?
Reedham 8 car
Coulsdon Town 8 car
Woodmansterne 6 car
Chipstead/Kingswood/Tadworth 5 car
TAttenham COrner can actually fit 9 on if i am not mistaken.
The above is just of the top of my head so may not be 100%.
Yeh, it is very lazy announcing that for ALL trains as you say cos 377s have got SDO so the announcement is wrong. Even worse is that Vic and London Bridge dont announce anything at all to do with short platforms.
Thanks for the correctionReedham 8 car
Coulsdon Town 8 car
Woodmansterne 6 car
Chipstead/Kingswood/Tadworth 5 car
TAttenham COrner can actually fit 9 on if i am not mistaken.
The above is just of the top of my head so may not be 100%.
Yeh, it is very lazy announcing that for ALL trains as you say cos 377s have got SDO so the announcement is wrong. Even worse is that Vic and London Bridge dont announce anything at all to do with short platforms.
. Looks like the platform lengths on the branch are half-decent. The Caterham branch is awful. I remember using Whyteleafe a while back and saw SDO5 by the stop mark, and the other two intermediate stations are not much better.
. Clapham Junction doesn't announce for many Southern services. If Southern's system is like SWT's system, it doesn't know what stock is working it, and the short platforms are hard coded for the most restrictive stock used.It is very lazy, you can see it on the Caterham line as well, for the most part they just lock the trailing set out of use for the whole branch line!
Thanks for the correction. Looks like the platform lengths on the branch are half-decent. The Caterham branch is awful. I remember using Whyteleafe a while back and saw SDO5 by the stop mark, and the other two intermediate stations are not much better.
I remember Victoria did announce train lengths, but yes London Bridge doesn't. Nor does LOROL (no surprise :roll. Clapham Junction doesn't announce for many Southern services. If Southern's system is like SWT's system, it doesn't know what stock is working it, and the short platforms are hard coded for the most restrictive stock used.
A manager told me the announcements aren't LOROL's fault. They need DARWIN to be compatible and while LOROL already have it, Southern are the last TOC in the country to roll it out.
Is Darwin the software that runs the auto PA announcements?
Is Darwin the software that runs the auto PA announcements?
The very same locals who were demanding a direct service because a two minute change across the platform is not good enough - they simply must take precedence over all operational efficiencies and common sense. Greater good and all that :roll:
Bugs me that layout at Blackfriars. The Through lines used to be on the West side and were moved to the East side at great expense I imagine. Why did they not just move the Southbound line only to the East side. Place both through platforms on the inside of the layout (so shared with a terminating platform). Then with the terminating platforms in the centre there was a 50% chance of a simple cross platform change in either direction. The other, worst, 50% would be a requirement to walk on the level via the North end concourse,
The above idea would also facilitate turning back late running Thameslink services at Blackfriars with the minimum of conflicting moves.
The current design seems pointless while the Wimbledon loop continues through the core - which it probably should do !.
This been done to death (and off topic) but was at. It would have required a flyover from London Bridge Up Thameslink that would have to climb from a viaduct to them rise another while curving over for tracks from Elephant & Castle. There is limited space to do this and would have required land take. Not to mention the visual impact of the new viaduct over two other railway ones creating a six/seven floor high block. And it would have spoil the St Pauls sightlines. That affected the plans for Blackfriars.
I don't buy this issue of the loop going through being a big thing. Currently the line is supporting this so it's already happening. It's just an excuse for poor infrastructure if you say you can't do this regularly.
The original idea was that the London Bridge trains would run through and the Loop trains would terminate. With the bay platforms to the west there would be no sharing of track between these groups of trains. As it is, this is the only flat junction on the busiest core section of Thameslink and therefore probably limits the capacity and reliability of the service as a whole.
Won't fast Southern services be crossing at BrickLayer's Arms? I understood the dive under was for slow Southern services only.
The original idea was that the London Bridge trains would run through and the Loop trains would terminate. With the bay platforms to the west there would be no sharing of track between these groups of trains. As it is, this is the only flat junction on the busiest core section of Thameslink and therefore probably limits the capacity and reliability of the service as a whole.