No better than 319s? - except they have air conditioning
Is AC any better than just opening windows? , a better ride
Unless the trains in question are pacers, the passengers don't care too much about ride quality. The ride quality on 319's isn't bad anyway, much more standing room
No more room than the 319/4's, longer trains on nearly all services
Could be done with any train but fair enough and a lack of centre seats of 3. The intervention with temporary Electrostars was a consequence of the delays in procuring the 700s so in specifying and designing the future trains, that is irrelevant. I await the wailing and gnashing of teeth in the local rag here following a surprised favourable response to the 387s. There weren't any complaints about the firm seat though so it seems to be a UKR issue.
The 387's are miles better than the 700's in my opinion but they are by no means the best trains out there, the 377's are much better. The complaining about the firm seats was pretty much over and done with after the 377/6's, although that doesn't mean that the seats are no longer cheap and could be loads better.
The journey experience for the majority of passengers from quite early in the lifetime of the class 700s will be greatly improved. For those who currently have trouble getting on the trains, let alone have the luxury of a seat, it will improve a lot. Bedford passengers are a minority on the line. As has been stated by Bald Rick and others, the
average journey time on Thameslink is 25mins. It is the Dft's responsibility to provide the best service for the majority of passengers, within the budget and existing infrastructure constraints. Without unlimited funding, they can't please all the people all the time.
When the DfT did that survey, did they take into account that the average journey time would increase when all the Peterborough, Cambridge, Littlehampton, Horsham and East Grinstead passengers joined the pool? With all those journeys, I doubt the average will be any less than 30 mins.
I can't answer that one other than that maximum capacity at Kings Cross is finite so beyond a certain point in the next few years, services cannot expand to cover the demand. No doubt somebody here with sufficient knowledge of the GN's available infrastructure will be able to explain. Of course with any large scale improvement of services there will be those who see no benefit or even a slight reduction of service, but that is just part of life, where there are always winners and losers.
Capacity on Thameslink isn't finite either - especially when there is disruption on the BML! (Which there is almost every day
)