Thameslink/ Class 700 Progress

Status
Not open for further replies.

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
So, when do the trains arrive in the UK for testing?

Auguest time, around a month after Three Bridges depot is completed (required fir commissioning).

What's the progres of the construction? When is the first set due for testing on the route itself? How many complete sets are there?

Are the 12 and 8 car sets getting different sub class numbers?

Progress is good tho I don't have full details.

I can't talk too much about testing at the moment but have heard that the later phases have changed.

I actually got an update today and its all very exciting and good news.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
So, when do the trains arrive in the UK for testing?

I think most of the testing will be done at Siemens test track, if I remember correctly from a tv program Siemens do a load of testing then the TOC (in this case TL) do their testing then once both a happy a unit gets signed off and delivered via the channel tunnel
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I think most of the testing will be done at Siemens test track, if I remember correctly from a tv program Siemens do a load of testing then the TOC (in this case TL) do their testing then once both a happy a unit gets signed off and delivered via the channel tunnel

There is still a lot initial testing that will be required. August until Aprill IIRC.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Individual unit testing can be done on the test track, but the class must be tested on the route to ensure all the calculations and simulations regarding performance, clearance etc- for example signal sighting and stopping positions. Just look at the mess that TER in France got into!
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,018
Location
St Albans
I believe the seats should be wider at with armrests, even the odd fold down table for some mod-cons. There is far too much standing space, it's as if the DFt panicked. But that if only the mockup from 1 Coach is it not?

Maybe they should have 1+2 seating in standard class with full relininng seats and individual full sized tables for the privileged few that board at the start of each run.
Serriously though, the standing room may seem a little generous now, but in 20 years time, (about halfway through the stock's life) floor space may be quite precious. Just look at the clamour there has been recently for removal of the third seat on 2+3 seat arrangment on 319s to make more room for standing. Nobody said much about that twenty five years ago when the stock was new..
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,082
Maybe they should have 1+2 seating in standard class with full relininng seats and individual full sized tables for the privileged few that board at the start of each run.
Serriously though, the standing room may seem a little generous now, but in 20 years time, (about halfway through the stock's life) floor space may be quite precious. Just look at the clamour there has been recently for removal of the third seat on 2+3 seat arrangment on 319s to make more room for standing. Nobody said much about that twenty five years ago when the stock was new..

i fear those days. If the london/southeast birth rate continues the way it is, we wont be able to move.

16 coach trains from 2030 ;)
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,018
Location
St Albans
The south-east and the east where most of the Thameslink commuters live have birthrates slightly below the England and England and Wales figure. London is quite a lot higher but that population is more likely to be using the Underground and the Overground (i.e. as per the Wombles :) ) than Thameslink.

As has been said many times here, 16 coach trains won't really help. But Crossrail 3, 4 &5 will! Still, we can't blame the DfT for thinking ahead when they get slaughtered every time a train gets overcrowded with so little standing room.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Maybe they should have 1+2 seating in standard class with full relininng seats and individual full sized tables for the privileged few that board at the start of each run.
Serriously though, the standing room may seem a little generous now, but in 20 years time, (about halfway through the stock's life) floor space may be quite precious. Just look at the clamour there has been recently for removal of the third seat on 2+3 seat arrangment on 319s to make more room for standing. Nobody said much about that twenty five years ago when the stock was new..

Yes that would be much better.... :roll:
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
All seating should be like first class on Heathrow Express! Extreme comfort for some, loads of standing room for the many.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,082
All seating should be like first class on Heathrow Express! Extreme comfort for some, loads of standing room for the many.

ANYTHING will do. Its all down to a extra inch or so of memory foam. Not much to ask for, i dont really expect seats to be as comfy as CIG seats for example, as I doubt they would get through the fire regs.
 

Via Bank

Member
Joined
28 Mar 2010
Messages
760
Location
London
The units begin arriving this year to begin acceptance testing and training, revenue service in 2016. Full fleet in service by 2018.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,018
Location
St Albans
The units begin arriving this year to begin acceptance testing and training, revenue service in 2016. Full fleet in service by 2018.

I wonder how long before the milestone event of the first one passing through the core happens. Presumably such a test would be needed fairly early in the testing regime. Somebody will need to check the beacons.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
With the way things are going, it's a miracle if any train makes it through the core without problems!
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I wonder how long before the milestone event of the first one passing through the core happens. Presumably such a test would be needed fairly early in the testing regime. Somebody will need to check the beacons.

August/September I reckon, tho I haven't seen the testing plan. Initial testing includes the Core on overnight testing.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
The units begin arriving this year to begin acceptance testing and training, revenue service in 2016. Full fleet in service by 2018.

Any idea approx when the acceptance testing in the UK starts? Just had a quick look on google for "Class 700", didn't get any vids of them running
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Any idea approx when the acceptance testing in the UK starts? Just had a quick look on google for "Class 700", didn't get any vids of them running

Despite the fact you can easily take videos, there's none on line strangely. They do look good on the move with their pan light on in the dark.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Despite the fact you can easily take videos, there's none on line strangely. They do look good on the move with their pan light on in the dark.

https://www.youtube.com/watch?v=wEZpvfYoAxI

Found that vid of an SNCB Desiro, no idea how old the unit is but the traction motors sound different from the UK Desiros, I wonder if the City's will use the same traction motors (unless SNCB specified the traction motors to be used perhaps)
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,602
Location
Nottingham
https://www.youtube.com/watch?v=wEZpvfYoAxI

Found that vid of an SNCB Desiro, no idea how old the unit is but the traction motors sound different from the UK Desiros, I wonder if the City's will use the same traction motors (unless SNCB specified the traction motors to be used perhaps)

The sound is to a large extent down to the way the traction electronics are programmed, since they generate the AC frequencies that power the motors. It is possible that the motors and even the electronics are identical in Belgium, but the software uses different algorithms, for example to avoid interference with particular signalling equipment.
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
I'm looking for a Coach by Coach Seating plan for the Class 700's - there's 52 pages of posts here but I can't find one with a quick review. Can anyone please point me in the direction of one - either online or in forum. Cheers
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,082
I'm looking for a Coach by Coach Seating plan for the Class 700's - there's 52 pages of posts here but I can't find one with a quick review. Can anyone please point me in the direction of one - either online or in forum. Cheers

closest thing ive found:

https://www.flickr.com/photos/mattbuck007/12837538835/sizes/o/

12837538835_a301601e63_b.jpg
 
Last edited:

physics34

Established Member
Joined
1 Dec 2013
Messages
4,082
less toilets than current stock, less seats, worse seats, no tables...... here i go again......... ;)
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
The cycle storage area is the only iffy bit of the layout that I can see if people are already sat in the tip-up seats when someone with a bike wants to board the train or if people have got their luggage there
 