Finally getting back to people. However before I do that, the next two 700 deliveries should be 700101 and then 700018.
Garbage. Staff taking industrial action doesn't make a train break down, poor design, inadequate testing and mis-handling by operators causes trains to fail.
I know 377/5 has wittered on about how much testing the door mechanisms have been put through. Its of no use if the driver is unable to stop the train in the correct position for the GPS to unlock all the doors. Nor has that testing involved having the whole carriage subject to the hammering meted out by what is laughingly called track in 3rd rail land. My point is that vital peak hour crowd-shifting trains shouldn't be turned over to class 700s until all the "bugs" have been ironed out.
I never mentioned the doors, just general testing. Please stick to the facts.
As for the units being self-diagnosing, that's only useful if it means that the faults are fixed quickly and the unit returned to traffic. Current experience suggests that the self-diagnosis program might be something of a hypochondriac.
So far the units have all been fixed quickly, just not quick enough for them to remain in service on that service which is minutes.
I agree that the country is swarming with the products of Bombardier (and that they've had reliability problems too). Do you know what, I'd rather ride home in a Class 310 with slam-doors and opening windows than stand on a packed platform waiting for a train that never arrives because its sitting at Hassocks and only one set of doors will open.
That's nice but the hundreds of people not able to get on trains home because your nice little fantasy means lower capacity doesn't suit the majority.
The 313s (which are generally now considered 'simple') reportedly suffered from a far worse introduction than that of the 700s.
But that's a fact that doesn't suit their argument! Opinions matter more than facts to some on here.
Question for 377/5 (no agenda here, just interest from a signaller)
The faults that are happening day in/day out. Is it stuff that generally wouldn't/couldn't of been tested during the testing stage, or is it that now they are in service they are 'busier'/being used in a different way, and thus the testing wouldn't of picked it up?
I find the whole testing/reliability thing quite interesting. I see these trains everyday, and have grown on me!! I am yet to use one, but colleagues that have are overally impressed (apart from usual complaints)
If you rather, stick it in a PM
Sorry for the delay getting back to you but been a busy week.
Some of the issues have never cropped up during testing in either Germany or in the UK. It seems some of the issues is the combination of UK infrastructure and the way drivers drive not mixing well.
The reliability is climbing now as driver are getting used to them and the different driving style they require. That's no different from going from 319s to 377s.
Yesterday I alighted an 8 carriage 377 at St Pancras LL in order to get an EC train from Kings Cross. Alighting was very slow as was people boarding. From my couple of times on a 700, they do as they're designed to do and vastly superior in this regard
What worries me more than any train or infrastructure problems is the ability of the stations to actually cope with the number of passengers. Even off-peak at St Pancras LL, queues for the escalators and stairs regularly tail back on to the platform. I really can't imagine it dealing well with 24tph.
When built, St Pancras was build to cope with x amount of years growth. What's happened is the growth is a lot further ahead. I *think* its nearer a decade of growth ahead.
Are they still just doing Brighton - Bedford and London Bridge? What will be the next route to receive them?
One way or other, it's quite appropriate to blame a combination of the rail industry, GTR and/or the Thameslink Programme for these issues, ultimately resulting in the passenger not being provided with their published timetable.
Early days yet, but so far things could have gone a lot better.
No, any negative opinions about the trains are all figments of the imagination, and in the Thameslink Programme dreamworld the trains are wonderful and everyone loves everything about them.
In the real world, the seats are uncomfortable and legroom is awful, and a downgrade compared to the existing trains.
The next element of the Thameslink Programme to deliver misery to passengers will of course be the 2018 timetable, when many users will find their service is now more likely to suffer delays and disruption. Given the mess of the 700 introduction so far, and the wider GTR shambles, it seems the powers that be think this is all acceptable for passengers.
Things are not ideal but that's the real world. No-one expected the 700s to be faultless but some like yourself with an axe to grind has seemed to believe anything minor is the end of the world. Its hard to judge a finished project when its in the interim stages properly.
As for negative opinions not existing, your taking your own opinion to be a fact. It isn't. Its not even shared by everyone. The 700s have spilt opinions and on here its clear. There is no train that will magically make everyone happy. But the 700s are built to a spec that isn't what you want so your never going to be happy.
Issues in neutral sections.
Lots of work going into that as it seems to be a singe location that's an issue. And its not just a train fault but the interaction of train, driving style and infrastructure that is impossible to replicate in testing.
Sat now at St Pancras Thameslink, looks like I'm here till gone 6pm as 1W45 isn't running. However a 700 has just gone North when I want a Southbound one. Typical. I'm never going to catch one, why are they honestly so lacking in reliability?!!
They aren't. They are performing higher than the 387s did on service introduction, maybe better than the 377s on TL. And last week they were out performing the 319s massively.
Will there be any extra 700 services added next week?
None this week folks.
None of the 8 car units are in service, IIRC.
Not yet. Soon. Final testing ongoing this week.
Can anyome explain why the Class 387 trains needed to have plug sockets for every one to two seats but the class 700s don't? Apologies if it's already been asked.
Sent from my SM-G925F using Tapatalk
700s spec is 6 years older than the 387s despite the former being more technically advanced.
So how long is the average journey onone of these 387 trains likely to be once they move on?
Do many people travel from Brighton to City Thameslink? That's longer than 25 minutes.
I'm not saying plug sockets are the most essential thing, just surprised some trains have time and others don't.
Average time has been quoted as 45 minutes.
However drop the 24tph core frequency to something which allows more realistic dwell times, and the issue goes away. No one has yet provided a convincing reason why this can't happen. In reality this will probably be the eventual outcome once the planned service becomes unworkable, but with a lot of pain and disruption along the way.
The dwell times are realistic. I've had 319s work almost within these times regular in peak a few years ago. The problem is the 319s cannot cope with being faster between stops nor the accelerated passenger numbers.
This is exactly what has happened. Thameslink was never designed as and should never have become a relief for overcrowding on the Underground. Funneling additional trains and passengers into St Pancras LL is a recipe for disaster on a monumental scale.
At present, passenger access to St Pancras LL has to be restricted because of overcrowding due to delays caused by late running, driver shortages, infrastructure failure and now Class 700 failure.
What's going to happen when GN services are shoehorned in at the same time as ATO is being introduced and all the services are formed of 700s?
You don't have to be a clairvoyant to predict what's going to happen. The frustrating thing is that railway management and engineers won't listen. They've been taken in (as they always are) by the snake-oil salesmen from the train & signals manufacturers - "Just let us show you our latest piece of kit...no this one will definitely work better than the last piece of **** we foisted on you...technology and computers will make it all work"
Don't believe it. I've been proved right with the Class 700s and I'll continue to be proved right until someone sees sense and prunes back the monstrous cluster**** that's about to happen.
The TLP was always designed with Underground relief. TfL has been a partner in the TLP since day one and one of its supporters.
As for the railway being taken in by salesmen, that's complete fiction. BR suggested doing it and then asked those salesmen to develop products to achieve that! Nice way to rewrite history there.
Lets not forget those supporting the old days, BR wanted to run all Kings Lynn services through he Core with Networkers! Something everyone agrees is not sensible today.
You do realise that 700 introduction on GN happens a year before running through to the Core right? Introducing ATO is expected at a different point to the May timetable IIRC so your trying to suggest multiple things are happening together that actually are months apart.
The 700s are not being shoehorned in. The term means squeezing things in. Not sure how putting 8 and 16 into a max capacity of 32 (24 paths out of the available 32 is not shoehorning anytbing) is shoehorning anything in. In fact its making sensible use of the available capacity.
However what have you been proven right with the 700s then? I'm unclear of your meaning so can you please expand and explain your claim please?
i think its more likely that the 24tph will be scaled back after the first few months on woe....Remember that for this to run efficiently, all trains from the south and the north have to arrive at the start of the core "on time" and there to be NO delays in the core whatsoever...or there will have to be a very sharpish contingency where trains are turned around quickly, short of their destination.
I predict that
Who said there will be do delays in the Core ever? That is impossible. Still things like ill passengers, bridge strikes etc that can never be avoided. Not everything that causes delays on the railway is the railways fault.
TOPS is showing both 700002 & 700010 as out today, can anyone confirm this?
Should have been 102/110 I believe. No 8 cars out at present. None have been signed over to GTR yet for passenger service (as per the plan).
What's the settled position with First Class on the 700s? Is it coach 1 or 12 which is permanently declassified? (I seem to have read conflicting information via various sources).
Rear of the train is declassified from what I've been shown. I asked about this last week. However this is not a 100%. Sorry I can't be more helpful but its not my area.
This is completely unacceptable. Siemens should not be putting trains into service before they are ready. How dare they not foresee the problem of avian fowling of the pan well. A specialist bird of prey test rig should have been set up at Sandy in cooperation with the RSPB to derisk such issues. On this basis it is a safe bet they have not planned for swans nesting on the line, fox hunts shorting the third rail with their beagles and the surge of passengers going out to celebrate when England win a major football tournament. This would have never have happened when we had National Service.
It was a 319 that that came into contact with a train. The incident then brunt a hole into the roof of the 319 near the pan. very wise to get train out of passenger service after that.