just saw the first thameslink Brighton to Cambridge direct route starts today.
https://www.standard.co.uk/news/tra...ghton-via-central-london-launch-a3785091.html
https://www.standard.co.uk/news/tra...ghton-via-central-london-launch-a3785091.html
The first direct trains between Cambridge and Brighton via central London were launched today.
The new Thameslink service will create space for 40,000 commuters a day and ease capacity on overcrowded Tube lines.
It includes a key section — Finsbury Park, St Pancras, Farringdon, City Thameslink and Blackfriars — creating a quicker alternative to the Northern line to and from London Bridge. There will also be direct links to Gatwick. Six trains a day will run during the “curtain-raiser” phase, with services launching in full in May.
There will be one return service from Brighton to Cambridge, departing at 11.32am from Brighton and 2.14pm from Cambridge, and two between Horsham and Peterborough. These will depart at 10am and 1.30pm from Horsham and 9.46am and 1.17pm from Peterborough.
The ability to run through-trains has been made possible by opening a tunnel linking King’s Cross — where the Cambridge and Peterborough services terminated — and St Pancras, where the trains connect with Thameslink’s Bedford-to-Brighton line....
Last edited by a moderator: