Silly question but given what has been said above, how long do we have for new rolling stock to enter service before serious timetable reductions have to be made?

E.g. let's assume the new tram trains are further delayed (there was a comment in another thread about them not being out on tests for a whole because of wheel issues). If the 150s are being withdrawn regardless then what happens?
It all depends on which 150's have life left in them. Some may have a lot more mileage left in them than others.

There's 24 756's, 12 231's and 34 150's. So if it came to it the Flirts can cover for the 150 replacements without needing the 398's. It will mean that 197's will remain on Maesteg/Ebbw Vale services which will mean the plans of 4-5 car on all Manchesters may be pushed back.

It's clear to see it's been a bad week for unit availability, but it's not as bad as some are making out. The sooner 756's are in the service, the better.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43096

On Moderation
Joined
23 Nov 2015
Messages
18,895
I'm not missing the point at all. You are simply looking at this from a factual point of view of how the railway currently operates, which is basically by means of keeping costs low, ticket prices high and making rail travel as uncomfortable for passengers as is possible.

The point that you are actually missing is that with better planning, provision and not having ROSCO's becoming very rich from leasing trains at the expense of the TOCs and the public purse, we could easily be in a position where we can keep enough stock rolling for enough time to enable a one in, one out system. Any business in the world can become more efficient by looking at their inefficiencies and finding a solution that makes the experience of dealing with them better for their customers.

I'm purely looking at this from a passenger perspective and passengers don't care why trains are being withdrawn if there is no replacement stock and their service capacity is either reduced or the service canned. As far as pax are concerned, the railway should do everything it can to provide the level of capacity required on each route and that level should always be maintained and anyone arguing against that is giving the railway industry a "get out of jail free" card to play with whenever this doesn't happen
You are missing the point, I'm afraid. All the TfW fleet plan should have been implemented by now, so the 150s should have gone before now. They have instead used up their remaining time to C6 overhaul as cover for late deployment of the new fleets - so the original plan was something like a one in, one out policy as you suggest. They've managed to use up all their contingency to their next overhaul and given the issue around the 150's bodies and lack of future lease opportunities, it is entirely understandable why the owner belives there is no commercial case for doing so, and the operator would also be unprepared to fund the work.

You also cannot just defer overhauls - they involve overhaul of safety critical equipment.
 

Lurcheroo

On Moderation
Joined
21 Sep 2021
Messages
1,241
Location
Wales
It all depends on which 150's have life left in them. Some may have a lot more mileage left in them than others.

There's 24 756's, 12 231's and 34 150's. So if it came to it the Flirts can cover for the 150 replacements without needing the 398's. It will mean that 197's will remain on Maesteg/Ebbw Vale services which will mean the plans of 4-5 car on all Manchesters may be pushed back.

It's clear to see it's been a bad week for unit availability, but it's not as bad as some are making out. The sooner 756's are in the service, the better.
If things get really dire, the 158’s whilst also struggling, have more life left in them and I think might be getting C6 overhauls (don’t quote me on that though) but certainly the leases have been extended and will be around at least 12 more months. Then the Cambrian 197’s could be brought in on the rest of the network if capacity can be found to stable and maintain them whilst 158’s continue on the Cambrian. But from what I hear, that’s not going to happen as it stands.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,662
Location
South Wales
Presumably away from TfW, the 150s at GWR and Northern are getting C6 overhauls as (amazingly) there are no immediate plans for replacement of the Northern & GWR 150 fleets?
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,635
Location
wales
But fact is reality. Things go wrong, as they have this week. And don't get me wrong, TFW have got it wrong every couple of weeks since they took on the franchise. There's always something going wrong. BUT, the plans in place were the plans in place. From the original franchise plans the entire new fleet, including 398's, should've been in service by now.

If I look at it from a passenger perspective then i'd like a 5 car IET every ten minutes going up each Valley and they all run to London. But i'm not that detached from reality.

What you're basically suggesting is TFW spending however much it would cost (hundreds of thousands? millions?) to get knackered, corroding nearly 40 year old stock through an exam that takes many weeks just to tide over for the next few months.
Not to mention the lack of anywhere to store them.
In fact some GWR units took upwards of 6 months.
 

Lurcheroo

On Moderation
Joined
21 Sep 2021
Messages
1,241
Location
Wales
In fact some GWR units took upwards of 6 months.
As I alluded to in post #1066 I think the GWR ones were much worse than originally thought and took much longer and cost more than expected, which may well have influenced why the lease company has no interest in doing the TFW ones.
 

diligentdave

Member
Joined
20 Oct 2007
Messages
445
If things get really dire, the 158’s whilst also struggling, have more life left in them and I think might be getting C6 overhauls (don’t quote me on that though) but certainly the leases have been extended and will be around at least 12 more months. Then the Cambrian 197’s could be brought in on the rest of the network if capacity can be found to stable and maintain them whilst 158’s continue on the Cambrian. But from what I hear, that’s not going to happen as it stands.
158's are easier to overhaul as they have aluminium body shells rather than steel like the 150's.
Presumably away from TfW, the 150s at GWR and Northern are getting C6 overhauls as (amazingly) there are no immediate plans for replacement of the Northern & GWR 150 fleets?
The Northern Class 150's for both Angel and Porterbrook are indeed going through C6 programs but they are having large sections of solebar replaced (4 metre lengths at a time in some places) and floors in what is now a very well organised process but it still takes upto 90 days per unit on a good unit.
 

Cambrian359

Member
Joined
17 Jun 2018
Messages
306
Not sure but 150240 was taken out of service today as it had a corroded floor . I wonder if we will see it back again.
Is this something that’s likely to spark a mass emergency withdrawal until they are all checked over? Or is it something they find occasionally and deal with as and when discovered?
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,662
Location
South Wales
TfW must be struggling for 150s and 231s today.
Penarth has been single 153s all day, apart from a few double this morning, and there's even double 153s on Rhymney - Barry - Bridgend.

If anymore 150s develop irreparable faults beyond the ones due to leave because of not getting the C6 overhauls, then TfW could be seriously in trouble on Valleys services for the rest of this year
 
Last edited:

Lurcheroo

On Moderation
Joined
21 Sep 2021
Messages
1,241
Location
Wales
TfW must be struggling for 150s and 231s today.
Penarth has been single 153s all day, apart from a few double this morning, and there's even double 153s on Rhymney - Barry - Bridgend.

If anymore 150s develop irreparable faults beyond the ones not getting the planned C6 overhauls then TfW could be seriously in trouble on Valleys services for the rest of this year
6 out of 7 231 diagrams are covered by 231’s today. The other is covered by a 150.

The situation is not good across the board and I see no sign of major improvement until the 756’s are in service.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,662
Location
South Wales
6 out of 7 231 diagrams are covered by 231’s today. The other is covered by a 150.

The situation is not good across the board and I see no sign of major improvement until the 756’s are in service.
It's easy to argue that Penarth - Coryton/ Caerphilly can make do with single 153s, but it won't stop the inevitable complaints
It does raise the question whether the June TT change on the Valleys should've been delayed until December when there was more chance of 756s being ready for passenger service
 

Jez

Established Member
Joined
22 Jan 2011
Messages
2,342
Location
Neath
TfW must be struggling for 150s and 231s today.
Penarth has been single 153s all day, apart from a few double this morning, and there's even double 153s on Rhymney - Barry - Bridgend.

If anymore 150s develop irreparable faults beyond the ones due to leave because of not getting the C6 overhauls, then TfW could be seriously in trouble on Valleys services for the rest of this year
Does anyone know how many pairs of 153s are required for the Valley Lines/Cardiff Local services such as Penarth, Vale of Glamorgan, Coryton/City Line etc. I know single 153s often turn up on Ebbw Vale to Newport too but im sure the LTP diagrams show 150s doing Ebbw Vale-Newport unless thats now changed.

I know a good number of 153s are needed for the HOWL and the Crewe stopper so there cant be that many left with only 24 (12 if doubled up)
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,628
Location
Llanharan
150227 is very much still sat on Canton, despite me being told it left for Newport, saw it today sitting on the line closest to the mainline and brickyard on Canton, with two of it's headlights on the entire day..
 

Lurcheroo

On Moderation
Joined
21 Sep 2021
Messages
1,241
Location
Wales
150227 is very much still sat on Canton, despite me being told it left for Newport, saw it today sitting on the line closest to the mainline and brickyard on Canton, with two of it's headlights on the entire day..
2 white lights (one either side) will just be the marker lights and would be unusual for it to be next like that. The instruction is to leave tail lights illuminated on both ends when stabling.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,628
Location
Llanharan
2 white lights (one either side) will just be the marker lights and would be unusual for it to be next like that. The instruction is to leave tail lights illuminated on both ends when stabling.
Oh yes of course, my mistake. Unsure if the marker lights on both sides were on, certainly wasn't the tail lights though.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,205
As far as I'm aware they did have that plan, but have been let down by manufacturers and other companies not delivering contracted products on time, and it was said elsewhere (not sure if on this thread) that the 150s needed a once-in-every-10-years exam in order to continue running which was absolutely not economical.
It's a shame that they cannot do checks on the 150s that have passed their C6 dates to check if they are still safe to run. Repeat those checks at frequent intervals, e.g. once per week or once per month. It's bizarre that a train is deemed safe to run one day but not the next. Clearly the level of deterioration over 10 years will vary significantly from one unit to the next.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,203
It's a shame that they cannot do checks on the 150s that have passed their C6 dates to check if they are still safe to run. Repeat those checks at frequent intervals, e.g. once per week or once per month.
are you suggesting that this doesn’t currently happen?
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,871
What you're basically suggesting is TFW spending however much it would cost (hundreds of thousands? millions?) to get knackered, corroding nearly 40 year old stock through an exam that takes many weeks just to tide over for the next few months.
What does the exam actually involve and is it something that can be replaced by increased day-to-day inspections of certain areas?

6 out of 7 231 diagrams are covered by 231’s today. The other is covered by a 150.
Does this mean the 231s are still encountering 'teething troubles' (only 6 out of 11 units working seems a bit on the low side) or is it normal for fleets of any age to fail to cover all their booked diagrams?
 

Caaardiff

Established Member
Joined
9 Jun 2019
Messages
1,398
What does the exam actually involve and is it something that can be replaced by increased day-to-day inspections of certain areas?
I'm not sure exactly, but we're talking overhaul levels. Not just checks. It's rated on mileage. Once the mileage is used, that's it.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,670
Location
Greater Manchester
What does the exam actually involve and is it something that can be replaced by increased day-to-day inspections of certain areas?
As said by someone experienced earlier on the thread:
The Northern Class 150's for both Angel and Porterbrook are indeed going through C6 programs but they are having large sections of solebar replaced (4 metre lengths at a time in some places) and floors in what is now a very well organised process but it still takes upto 90 days per unit on a good unit
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,908
It's a shame that they cannot do checks on the 150s that have passed their C6 dates to check if they are still safe to run. Repeat those checks at frequent intervals, e.g. once per week or once per month. It's bizarre that a train is deemed safe to run one day but not the next. Clearly the level of deterioration over 10 years will vary significantly from one unit to the next.
That can and does happen - C6 extensions can be carried out, it requires a survey of the vehicle. There will be a point however where nobody will agree to sign another extension without the work being completed.
 