• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

TfW Request Stop Trial

Status
Not open for further replies.

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,292
Location
South West London
Similar to Scotrail, it seems TfW are trialling request stop buttons. I'm not sure of their implementation as it's not on a line with in-cab signaling (indeed it's a line with semaphores). Does anyone know how they're going to be implemented?

Source:

Request stop trial

We've been supporting @comms_design in creating and developing a Request to Stop prototype, which we'll be trailing next (this) week.

We'll be at Llanfairpwll station on Wednesday 24 July. Stop by if you're in the area; we'd love to hear your feedback!

 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
I wonder how the stop request is given to the driver? For those wanting to get off I suppose it's ask the guard as usual.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,220
I wonder how the stop request is given to the driver? For those wanting to get off I suppose it's ask the guard as usual.
Longstanding USA user of this system, the Norristown line in Pennsylvania, has a signal at braking distance before the station, which the train resets as passing.
 

1955LR

Member
Joined
11 Dec 2019
Messages
296
Location
Hereford
Last time I was in Switzerland they had that system on some lines . Button on the platform and on the trains for getting off . I was advised at the hotel how it operated
 

TheTallOne

Member
Joined
2 Jan 2024
Messages
265
Location
Birmingham
Simple option would be a big light near the station. But simple might not be safe/compliant?

Guess the safest option would be to have a red signal at the end of the platform and then the rest of the preceding signals would be slowing the train down ready for the red?

Although then how does it deal with stopping and non-stoping services? It'd have to show the red after the express had gone through and keep it red for the local?

Don't want the customer pressing the button too soon and the logic just making the signal red straight away.

Could it send a message to a signaller in the control room? And/or the train itself if it could work out the next non-express train?
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,220
Norristown Line, Pennsylvania USA, station.


Note right-hand running, stopping signal for nearer platform is behind photographer. Stop button on platform. Opposite direction stop signal (just) visible, mounted immediately beyond end of platform, this one visible from well down the line. Non-stop services just don't stop, even if button pressed - a sign on the platform (and in timetables) says so.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,309
Location
Somerset
Simple option would be a big light near the station. But simple might not be safe/compliant?
“Signal” of a different colour and shape at stopping distance. Signal lit means no stop requested - signal not lit = stop requested. Non-stop trains can just ignore it (though by their nature there aren’t many request stops on lines where there’s likely to be a “fast” in the period of time before a stopper when a prospective passenger might press the stop button.
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,629
Location
wales
Quite a few. Most on the HOWL, plus many on the Cambrian coast. Some in west Wales too.
West Wales i believe is as follows, Milford/ Fishguard line - Clarbeston Road (depending on service), Clynderwen.

Pembroke dock line Lamphey, manorbier (when heading west), Penally, Saundersfoot, Kilgetty, Narberth (not unusual to see all these be used as regular service stops in summer though).

Carmarthen - Swansea

Kidwelly and Ferryside.

Making by my maths 10 in West Wales.
 

Farigiraf

Member
Joined
23 Jul 2023
Messages
1,142
Location
Bridge on the River Cam
West Wales i believe is as follows, Milford/ Fishguard line - Clarbeston Road (depending on service), Clynderwen.

Pembroke dock line Lamphey, manorbier (when heading west), Penally, Saundersfoot, Kilgetty, Narberth (not unusual to see all these be used as regular service stops in summer though).

Carmarthen - Swansea

Kidwelly and Ferryside.

Making by my maths 10 in West Wales.
Johnston between Milford Haven and Haverfordwest is also a request stop.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
This saves a bit of brake wear and fuel because the train doesn't have to slow down and speed up on the chance that they have to stop on seeing someone on the platform. But I assume the timetable will still have to be planned on the assumption that trains may need to stop each time - especially when it's a single line.
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
This saves a bit of brake wear and fuel because the train doesn't have to slow down and speed up on the chance that they have to stop on seeing someone on the platform. But I assume the timetable will still have to be planned on the assumption that trains may need to stop each time - especially when it's a single line.
Brake pads are changed after so many miles, so makes no difference.
Trains are also fuelled depending upon how many miles they're diagrammed to work, so makes no difference
 

louis97

Established Member
Joined
14 May 2008
Messages
2,144
Location
Derby
Trains are also fuelled depending upon how many miles they're diagrammed to work, so makes no difference
You can't put in more than the tank capacity though... If it's full after less than the miles of the diagram you've made a saving.

Although I'm not sure how wide spread filling units just for the particular diagram is, certainly seems unwise. I know from my experience it didn't happen where I worked as the units worked away from a fuel point several days in a row.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,402
Location
Northampton
This saves a bit of brake wear and fuel because the train doesn't have to slow down and speed up on the chance that they have to stop on seeing someone on the platform. But I assume the timetable will still have to be planned on the assumption that trains may need to stop each time - especially when it's a single line.
Presumably the timetable planning won't change at all, and it'll still be a zero-second 'dot stop' with half a minute adjustment allowance after each request stop.

Given the limited benefits of request stops and additional issues with them I don't really see why they aren't just advertised as normal stops (or closed, if appropriate).
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
Presumably the timetable planning won't change at all, and it'll still be a zero-second 'dot stop' with half a minute adjustment allowance after each request stop.

Given the limited benefits of request stops and additional issues with them I don't really see why they aren't just advertised as normal stops (or closed, if appropriate).
Indeed, there's a strong argument that if a stop doesn't have enough passengers for at least one to be boarding or alighting on every calling train, then it probably shouldn't be a stop in the first place. But that runs into political issues of course.
 

flitwickbeds

Member
Joined
19 Apr 2017
Messages
768
Indeed, there's a strong argument that if a stop doesn't have enough passengers for at least one to be boarding or alighting on every calling train, then it probably shouldn't be a stop in the first place. But that runs into political issues of course.
At least one passenger per calling train seems quite a high threshold. Some popular high frequency stations would no longer be served under your proposal!
 

Jez

Established Member
Joined
22 Jan 2011
Messages
2,311
Location
Neath
Most of the request stops in West Wales on the Pembroke and Milford lines are regularly called at whenever ive used these services. This is also why Kidwelly and Ferryside became booked stops as almost every service would call there.

The Heart of Wales is a different story and quite a few of them are missed when I have used the HOWL line. Never called at Bynea when ive used it or Sugar Loaf and very rarely at a few others such as Llanbister Road and Pen y Bont. Unsure about North Wales but when I recently used the Conwy Valley as far as Betws-Y-Coed all request stops were called at even Dolgarrog. I myself used Glan Conwy to alight the train but there was someone waiting to get on also so it would have stopped.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,402
Location
Northampton
Indeed, there's a strong argument that if a stop doesn't have enough passengers for at least one to be boarding or alighting on every calling train, then it probably shouldn't be a stop in the first place. But that runs into political issues of course.
I'd not go as far as that, although I do think there are cases for stations to be made limited times only as well as outright closure. Lots of these stations will cost very little to run, so the threshold for staying open can remain very low for social value.
 

louis97

Established Member
Joined
14 May 2008
Messages
2,144
Location
Derby
Presumably the timetable planning won't change at all, and it'll still be a zero-second 'dot stop' with half a minute adjustment allowance after each request stop.
This doesn't really apply to TfW, almost all TfW request stops have dwell time, some of up to 60 seconds!
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,402
Location
Northampton
This doesn't really apply to TfW, almost all TfW request stops have dwell time, some of up to 60 seconds!
Fair enough, that's changed in the rules in the last couple of years, but makes even less sense to retain request stops.
 

Lurcheroo

Established Member
Joined
21 Sep 2021
Messages
1,239
Location
Wales
How many request stops are there in Wales these days?
I believe it’s 58. Hopefully the map I’ve added is of decent quality.

As for how it will work, it will use the GSMR system and there will be (I believe) an additional small display to inform the driver of whether someone at the stop has pressed the button to request the train to stop. This part hasn’t been implemented yet so there will be staff that are part of the project with a mobile phone linked to the platform system, on the trains in question to tell the guard if there is someone waiting who can inform the driver in the appropriate manner.

I’m not certain how it will tie in with guards either, whether it will be linked to their work phones, whether only the driver will know and they still use the old system of buzzing the driver to say they don’t have anyone onboard to get off. It’s early days so I wouldn’t be overly surprised if that part of the method of working hasn’t been decided yet.

As for fuel, at Mach, every train that comes on to depot of a night time gets fuelled to max. So if the train uses less fuel for the same mileage since it was last fuelled then that is a cost saving.
I’m not totally sure on the brake changes but I’ll have to ask now out of curiosity.
197’s work differently though, as they have a dynamic brake which gets used exclusively above a certain speed so brake wear will be less. But perhaps there are other benefits in terms of mechanical sympathy if the dynamic brake isn’t having to work as hard all the time.



As a Cambrian coast driver with our 15 request stops, I’m supportive of it but can see it having its own issues / not being as effective as hoped.
 

Attachments

  • IMG_2333.jpeg
    IMG_2333.jpeg
    334.6 KB · Views: 142
Status
Not open for further replies.

Top