If everything you've said is factual and you can prove it, why haven't you gone to the press with all of it? You say you want the public to know, but you only post on a rail forum.Another classic PR stunt there again. They need to stop promising dates, it's not going to happen. Late summer, but more like 2027-28.
Reality is, 34 units have been delivered. Only a handful of them are in a functional state as previously mentioned. Those that are running are consistently full of faults, a team are onboard to wipe all software. Faults are being hidden off logs, including those of previous brake issues. Evidence has been shown to the unions which they are hiding away. Staff are reporting them, and then dragged up to see management if they refuse to take a unit out. They are not fit for purpose, and it's not going to end well I'm sorry to say.
So far there only 3-4 crew passed out to work them too.
I know you don't believe me, but I wouldn’t even take my family on one of these things.
Maybe he doesn’t want to have the hassle of going to the press?If everything you've said is factual and you can prove it, why haven't you gone to the press with all of it? You say you want the public to know, but you only post on a rail forum.
Seems like you're getting real time information and very detailed information, so I assume you have pretty good sources. What have you got to lose?
Well they have got to "manage expectations". PR does make me cringe but if there was no information coming out I would be more concerned.Sounds just a little bit defensive about the toilet issue though!
And why is the regulator letting them test on live railways with that supposed level of faults? Would be far too big a risk to the public and the workforce.I find it strange that if the units are as bad as you say they are, and faults (brakes etc) are also as bad as you say. Why are the unions not shouting from the roof tops like they normally do when such serious issues with rolling stock.
Also why are the unions allowing there members to drive the units if they are so bad?
What time do the toilets close and what happens on the last train home?
Our new toilets will stay open until the last train has departed the station. Customers are advised to use toilet facilities before boarding the train.
Until late 2026, we’ll continue to use our Class 756 trains on our last services of the day. These trains have toilets on board.
After this, we’ll replace our Class 756s with our tram-trains, adding dedicated toilet stops to our timetable on late-night services. This will allow customers to get off and use the toilet, before getting back on and continuing their journey.
I can see there being huge delays on the last (few) services of a Friday or Saturday night.The toilet issue has been done to death on here, but for someone with a bladder or bowel condition, holding on 20 minutes for the next toilet can actually be a very long time, especially if you have a condition that means you can need the toilet urgently, without much warning, and can't hold on.
Ideally, there should be a toilet at every other station, but obviously there's no funding for that.
On this page under the FAQs, it says there will be toilet stops for the last trains of the night from December
![]()
Toilets | Transport for Wales
Transport for Wales | Buy Cheap Train Tickets and Check Train Timestfw.wales
I thought the 398 are EN15277 C-III compliant? If this is the case, I wouldn't be worried.
I find it strange that if the units are as bad as you say they are, and faults (brakes etc) are also as bad as you say. Why are the unions not shouting from the roof tops like they normally do when such serious issues with rolling stock.
Also why are the unions allowing there members to drive the units if they are so bad?
Bear in mind that most of the people with access to the facts are also subject to social media policies that mean they can't publicly comment. Whereas alleged former employees can spew whatever bile they wish free from consequences.Does anyone have information that can contradict or correct what VR494 is saying?
While admittedly their comments do seem excessively negative I’ve also yet to see anyone post anything to really contradict or truly explain the continuing multi year delays?
I realise no one is obliged to but when one person is continually shut down you would think someone would step up with factually correct information!( as happens in all other topics)
Unions want to keep current staff levels and at current pay levels so possibly on this occasion they aren’t jumping up and down about issues just yet…..as has been pointed out on this thread tram systems in other parts of uk don’t have conductors and drivers are on considerably less pay.
I think the hard part of us too is how much of this is the normal level of faults you get with a brand new train like this (the 197s were criticised for a long time due to faults and 'shoddy' construction)Bear in mind that most of the people with access to the facts are also subject to social media policies that mean they can't publicly comment. Whereas alleged former employees can spew whatever bile they wish free from consequences.
Also, whilst there are a few TfW employees on this site, to the best of my knowledge most of them aren't based on the Valleys network.
Bear in mind that most of the people with access to the facts are also subject to social media policies that mean they can't publicly comment. Whereas alleged former employees can spew whatever bile they wish free from consequences.
Well they don't need to touch network rail infrastructure for the initial planned route (Pontypridd to Cardiff Bay) but they have been doing that bit recently. Idk if they've been through Central (the network rail part) recently though.so when was the last time a 398 ventured out of Taffs Well onto Network Rail railway ? Presumably the 398s are actively running up and down the depot sidings daily
![]()
Transport for Wales enters final stages for tram-trains introduction
Transport for Wales (TfW) is entering the final stages of preparation ahead of the introduction of its first brand‑new tram‑trains on Pontypridd to Cardiff Bay services this summer.news.tfw.wales
05 Jun 2026
Transport for Wales (TfW) is entering the final stages of preparation ahead of the introduction of its first brand‑new tram‑trains on Pontypridd to Cardiff Bay services this summer.
Training for traincrew is well under way, with test runs taking place most days.
TfW continues work to install nine new toilet facilities as well as five refurbished toilet facilities across the Treherbert, Aberdare and Merthyr lines, helping ensure customers have access to toilets when the tram-trains are rolled out.
The South Wales Metro aims to improve connections between Cardiff and the Valleys, with more frequent and faster journeys. TfW’s new fleet of fully electric tram-trains are key to delivering this ambitious Metro timetable.
The improved performance of the new trains, combined with the improvements TfW made to the infrastructure, will reduce journey times to around 50 minutes between Cardiff and Treherbert, Aberdare and Merthyr, with a train every 15 minutes. These changes will be delivered gradually in phases.
Tram-trains will also allow TfW’s network to be expanded, as they’re able to run on light-rail tram lines in the future, as part of the Cardiff Crossrail project. This will allow even more communities to access vital rail services.
The tram-trains are designed for Metro style hop-on-hop-off journeys, with level boarding from train to platform, three open and spacious carriages and improved spaces on board for wheelchairs and bikes.
The first of the 36 new tram-trains will be introduced onto Pontypridd to Cardiff Bay services this summer, replacing the older Class 150 trains that currently run on these services.
Dan Tipper, Chief Infrastructure Officer at TfW said: “Our teams are working extremely hard as we move into the final stages ahead of introducing our first tram‑trains into service. With driver and train manager training nearing completion and testing taking place most days, we’re making strong progress towards launching these services.
“The tram‑trains are central to delivering the faster, more frequent journeys promised by the South Wales Metro and, alongside pay as you go, will support a true turn‑up‑and‑go service for communities across the Valleys.”
As with other metro systems across the UK and Europe, TfW’s tram‑trains do not have toilets on board. Transport for Wales recognises how important access to toilet facilities is for customers and has made a significant investment to improve provision where the tram-trains will run.
This includes the installation of nine new station toilets across the network, alongside the upgrade of five existing facilities. These improvements mean that customers travelling on tram‑train services should never be more than 20 minutes away from a toilet when travelling on the network.
Each of the newly installed toilets have been designed with accessibility in mind, including:
To keep passengers safe, TfW has upgraded the CCTV and lighting at all stations where the new toilets have been installed. CCTV outside the toilets will be streamed live to TfW’s Integrated Control Centre in Taff's Well, where it’s managed 24/7 by a dedicated team.
- Wheelchair access.
- Support rails.
- Help points on the inside and outside of the toilets.
- Baby changing facilities.
- Sanitary product dispensers.
Live help points will ensure customers can report any issues, and remote door locking aims to also help reduce vandalism and anti-social behaviour. TfW will also employ mobile teams to keep the toilets clean and secure.
As installation of the new facilities progresses, with six of nine toilets now nearing completion, Transport for Wales will provide temporary facilities at Pontypridd, Trefforest and Radyr while existing toilets at these stations are refurbished. These temporary facilities will open in time for the first tram-trains to enter service.
Further information, including maps showing the new toilet locations, is available on the TfW website - https://tfw.wales/south-wales-metro-toilets
Notes to editors
Toilet facilities across the Treherbert, Aberdare and Merthyr lines will be in place before tram‑trains enter service on these routes, ensuring customers are no more than 20 minutes away from a toilet while travelling on the tram‑trains.
Each new toilet facility will open as soon as construction is complete, with toilets at Aberdare and Abercynon stations expected to be the first to open.
Over half of the new toilets have already been installed at stations, and work is ongoing to open the facilities in time for the introduction of the first tram‑trains onto the Treherbert, Aberdare and Merthyr lines.
For those travelling on board the tram-trains between Pontypridd and Cardiff Bay, passengers are advised to use customer toilets available at Pontypridd, Trefforest, Radyr, Cardiff Queen Street and Cardiff Central.
Further information, including maps showing the new toilet locations, is available on the TfW website - https://tfw.wales/south-wales-metro-toilets
The last test run via Network Rail metals (via Cardiff Central) was on 30th May. https://www.realtimetrains.co.uk/service/gb-nr:V12406/2026-05-30/detailed#allox_id=0Well they don't need to touch network rail infrastructure for the initial planned route (Pontypridd to Cardiff Bay) but they have been doing that bit recently. Idk if they've been through Central (the network rail part) recently though.
The alternative, which we've seen at various points during the past 3-4 years I've lived in Cardiff, is a mixture of cancellations and substitutions of older rolling stock. TfW have deliberately brought a number of 153s back into service to cover for stock shortages in and around South Wales.TfW are obviously outwardly confident that the entire 398 fleet will be in daily passenger service by December. If that doesn't happen, what's the alternative?
Presumably mainline want the 231s now but still can't have them, and presumably 150s will continue to be withdrawn when their allowed miles are up.
December could become the crunch date.
But those 153s can't be used on the Pontypridd lines, and we've been told that Valleys crews competency on the 153s has expired as well to use them on the Rhymney line.The last test run via Network Rail metals (via Cardiff Central) was on 30th May. https://www.realtimetrains.co.uk/service/gb-nr:V12406/2026-05-30/detailed#allox_id=0
== Doublepost prevention - post automatically merged: ==
The alternative, which we've seen at various points during the past 3-4 years I've lived in Cardiff, is a mixture of cancellations and substitutions of older rolling stock. TfW have deliberately brought a number of 153s back into service to cover for stock shortages in and around South Wales.
Never going to happen. There would be uproar from both ends of the line. At best they could lose the Caerphilly part of those runs and just have Penarth to Coryton.Canning the Penarth-Coryton service and replacing it with buses is one extreme option - that releases up to 7 x 756s for use elsewhere, and those customers (myself included) have a lot of other options for their journey when compared to those in the Valleys.
There's still a few 150's on the mainline that could be subbed by those 153's. Are there many more left in storage?But those 153s can't be used on the Pontypridd lines, and we've been told that Valleys crews competency on the 153s has expired as well to use them on the Rhymney line.
There's not many left due to retire so they could stretch some more life out of them if needed.Presumably mainline want the 231s now but still can't have them, and presumably 150s will continue to be withdrawn when their allowed miles are up.
December could become the crunch date.
Speaking to friends who know people who know more than most it appears many VR494 haters will have egg on their face ‘shortly’ (as TfW seem to like to use this term)Does anyone have information that can contradict or correct what VR494 is saying?
While admittedly their comments do seem excessively negative I’ve also yet to see anyone post anything to really contradict or truly explain the continuing multi year delays?
I realise no one is obliged to but when one person is continually shut down you would think someone would step up with factually correct information!( as happens in all other topics)
Unions want to keep current staff levels and at current pay levels so possibly on this occasion they aren’t jumping up and down about issues just yet…..as has been pointed out on this thread tram systems in other parts of uk don’t have conductors and drivers are on considerably less pay.
Outside of a Class 455 farewell tour, it’s quite difficult to view scheduled toilet stops as anything other than farcical in this day & age! Regardless of the merits or otherwise of turning the ‘big railway’ into a tramway, that’s a pretty shoddy situation.The toilet issue has been done to death on here, but for someone with a bladder or bowel condition, holding on 20 minutes for the next toilet can actually be a very long time, especially if you have a condition that means you can need the toilet urgently, without much warning, and can't hold on.
Ideally, it should be no more than 10 minutes to the next toilet, but obviously there's no funding for that.
On this page under the FAQs, it says there will be toilet stops for the last trains of the night from December
![]()
Toilets | Transport for Wales
Transport for Wales | Buy Cheap Train Tickets and Check Train Timestfw.wales
TfW are obviously outwardly confident that the entire 398 fleet will be in daily passenger service by December. If that doesn't happen, what's the alternative?
Presumably mainline want the 231s now but still can't have them, and presumably 150s will continue to be withdrawn when their allowed miles are up.
December could become the crunch date.
It looks like, apart from main stations like Queen Street and Pontypridd, it could be 1 single, unisex toilet at the stations with toilets. There could be a long wait at some stations on the last train of the nightOutside of a Class 455 farewell tour, it’s quite difficult to view scheduled toilet stops as anything other than farcical in this day & age! Regardless of the merits or otherwise of turning the ‘big railway’ into a tramway, that’s a pretty shoddy situation.
How many ‘patrons’ are able to use the station facilities at once; are they installing a proper toilet block or just a couple of single lavatories? The tram crews might need to take a flexible approach as to how long these additonal dwells will take with a busy load on the last run on a Saturday night!
Outside of a Class 455 farewell tour, it’s quite difficult to view scheduled toilet stops as anything other than farcical in this day & age! Regardless of the merits or otherwise of turning the ‘big railway’ into a tramway, that’s a pretty shoddy situation.
How many ‘patrons’ are able to use the station facilities at once; are they installing a proper toilet block or just a couple of single lavatories? The tram crews might need to take a flexible approach as to how long these additonal dwells will take with a busy load on the last run on a Saturday night!
It looks like, apart from main stations like Queen Street and Pontypridd, it could be 1 single, unisex toilet at the stations with toilets. There could be a long wait at some stations on the last train of the night