• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

TfW class 398 Stadler Citylink tram trains

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,742
Location
Croydon
Regarding Pantograph wear. All it would need is a random (but short) time length delay after passing the balise (or whatever) that triggers the pantograph to raise. Then the contact wire would be in a different position relative to the pantographs contact strip each time.
Certainly not new to the UK. happens all the time at Wigston, Scrubs lane, and various points on the Great Western main Line
Perhaps it is more random in the applications you mention and/or on TfW the unit speed is far more precise. So varying the unit speed would be useful. Perhaps a variable speed limit sign that varied by time all day long.

Yeah I know - Heath Robinson. But I suppose in the higher speed applications there is a chance the train concerned has not yet reached the speed limit so speed might be more variable by accident.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,272
Location
Isle of Wight
They cut back on the number of feeder stations to free up capital to finance Taffs Well depot, and because of this anything more than 12 flirts in combined mode causes the system to go into low power. Trains get warnings and systems show up faults. The 4 an hour is out of the question, 36 of these cannot run on the current system.

If this was true and those working on the project know the proposed 4tph service is impossible... why are we only reading this from a single individual in a railway forum and not in the mainstream media? If you were so confident this was all 100% true I don't understand why you, or many others who presumably have the same knowledge, haven't been talking to journalists.

It doesn't add up.
 

Daniel Boone

Member
Joined
13 Oct 2024
Messages
119
Location
United Kingdom
If this was true and those working on the project know the proposed 4tph service is impossible... why are we only reading this from a single individual in a railway forum and not in the mainstream media? If you were so confident this was all 100% true I don't understand why you, or many others who presumably have the same knowledge, haven't been talking to journalists.

It doesn't add up.
Is it not possible that the current ability of the infrastructure is deliberately limited because of cost savings? I've heard that TFWs cash flow isn't particularly good, so I'd assume that the necessary OLE provision for 4tph has been delayed until actually required, along with Queen Street track layout reconfiguration and 398 introduction. This is purely speculative.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,272
Location
Isle of Wight
Is it not possible that the current ability of the infrastructure is deliberately limited because of cost savings? I've heard that TFWs cash flow isn't particularly good, so I'd assume that the necessary OLE provision for 4tph has been delayed until actually required, along with Queen Street track layout reconfiguration and 398 introduction. This is purely speculative.

398s are a fraction of the weight and power draw of the 756s, so either everyone else working for TfW is being astonishingly tight lipped... or there isn't actually a major issue here, and significantly lighter/less powerful tram trains will compensate for the increase in frequency.
 

VR494

Member
Joined
22 Jan 2026
Messages
237
Location
United Kingdom
Is it not possible that the current ability of the infrastructure is deliberately limited because of cost savings? I've heard that TFWs cash flow isn't particularly good, so I'd assume that the necessary OLE provision for 4tph has been delayed until actually required, along with Queen Street track layout reconfiguration and 398 introduction. This is purely speculative.
Cash flow is supposedly linked directly to the budget for transportation, set by the WA. Money is desperately needed elsewhere too!

Speaking to a former senior colleague, the ethos at the moment is they know openly these units are not fit for the needs of the CVL. Most of the management have distanced themselves from the operational aspects due to their openness and opinions. Higher up are pushing the idea and are more focused on the dream, so that’s what they want, let them have it. When it goes wrong later this year, it’s not going to be their problem as they were just told to do the job.

Leave it up to the next parliament to decide what to do. Honestly the whole thing is a political stunt. Only 4 of the units even work apparently, so the training is on and off as well.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
raising a pantograph at Westenhanger? What's the Eurostar running on before that? *Mind you, it did happen (at lower speed) when the 373s were still using the original Boat Train Route.
As I understand it, Eurostar needs an extra long pantograph in the Channel Tunnel because of the extreme height of the catenary (designed for the Le Shuttle trains).
So there is still a pantograph change at speed to/from Eurotunnel infrastructure, even though it's all under 25kV.
 

ajay1071

Member
Joined
12 Oct 2014
Messages
94
It will be a good day when the 398's enter service as the other rolling stock can be cascaded to their intended diagrams. It's a pity there has been so many continuing technical issues on the 398's as all the other new stock even the 67 s have settled down and performing well , bar for the odd in service failures which can be expected.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
6,008
Shows now, but at very small resolution (just 296x185). If you click/tap "Attach files" and select the photo, it should just attach at full resolution.

That is full resolution! I only had 3x optical zoom at my disposal and I wasn't very close...
 

ptreanor

Member
Joined
2 May 2017
Messages
45
Location
Exeter
raising a pantograph at Westenhanger? What's the Eurostar running on before that? *Mind you, it did happen (at lower speed) when the 373s were still using the original Boat Train Route.
The Eurostar pantographs are lowered and then raised at Westenhanger when changing between HS1 and ET catenary configurations. The ET catenary is considerably higher than that on HS1 for obvious reasons.
 

chargesmith

Member
Joined
14 Nov 2023
Messages
274
Location
South Wales
At least one more test run today. Just seen two units out and about in formation.

Appears to be multiple runs planned today according to RTT and they've all been on time so far which hopefully means they were successful.

Does anyone know how many miles of fault free running are needed?
 

Gordonman

Member
Joined
14 Jan 2020
Messages
629
Location
Baildon
At least one more test run today. Just seen two units out and about in formation.

Appears to be multiple runs planned today according to RTT and they've all been on time so far which hopefully means they were successful.

Does anyone know how many miles of fault free running are needed?
Any I/D's of the units on test today please?3Q00 and 3Q10 appear to be the initial reporting numbers
 

chargesmith

Member
Joined
14 Nov 2023
Messages
274
Location
South Wales
Any I/D's of the units on test today please?3Q00 and 3Q10 appear to be the initial reporting numbers
3Q10 was the one I saw - didn't manage to see the unit numbers.

== Doublepost prevention - post automatically merged: ==

Any I/D's of the units on test today please?3Q00 and 3Q10 appear to be the initial reporting numbers
Just saw 3Q24 as well - unit numbers were 019 and 030
 
Last edited:

VR494

Member
Joined
22 Jan 2026
Messages
237
Location
United Kingdom
At least one more test run today. Just seen two units out and about in formation.

Appears to be multiple runs planned today according to RTT and they've all been on time so far which hopefully means they were successful.

Does anyone know how many miles of fault free running are needed?
It’s 1,500 per unit, however the WA have supposedly reduced this under a dispensation agreement to allow the units get out quicker.

They went to the test track to have this done, but I think funding has been an issue again. So they came back early.

The current units out are fault free runs to accumulate this, and drivers are currently training, 4 days classroom and 12 hours handling.

Due to unit unavailability, drivers are currently having issues getting the hours in to pass out competent. So there’s already a backlog on those completing the classroom phase and into handling. They cannot simply do a short conversation course because of the nature of the units.

Stadler are saying that the majority of the issues are software related, but before they go out there’s a load of modifications they need to have, such as extending tables to be removed due to issues with health and safety concerns around hand entrapment.

The door mechanism is also visible, and yellow stickers need to be installed around these too.
 

Attachments

  • IMG_2469.jpeg
    IMG_2469.jpeg
    110.1 KB · Views: 169
Last edited:

iamraymond

Member
Joined
10 Nov 2025
Messages
102
Location
Bristol
It’s 1,500 per unit, however the WA have supposedly reduced this under a dispensation agreement to allow the units get out quicker.

They went to the test track to have this done, but I think funding has been an issue again. So they came back early.

The current units out are fault free runs to accumulate this, and drivers are currently training, 4 days classroom and 12 hours handling.

Due to unit unavailability, drivers are currently having issues getting the hours in to pass out competent. So there’s already a backlog on those completing the classroom phase and into handling. They cannot simply do a short conversation course because of the nature of the units.

Stadler are saying that the majority of the issues are software related, but before they go out there’s a load of modifications they need to have, such as extending tables to be removed due to issues with health and safety concerns around hand entrapment.

The door mechanism is also visible, and yellow stickers need to be installed around these too.
Scraping the barrel here, I'd hardly call a 10 second job of "installing" a yellow sticker a "modification"
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,809
Location
SW London
Scraping the barrel here, I'd hardly call a 10 second job of "installing" a yellow sticker a "modification"
Most of the delay would be in ordering and producing the stickers. That would take rather more than 10 seconds.

It all adds up: 10 seconds x two leaves x 3 doors x two sides x 36 units, plus the time to walk between doors and between units.

== Doublepost prevention - post automatically merged: ==

They cannot simply do a short conversation course because of the nature of the units.
Just a quick chat?
 

Top